“Nothing happens without foundations.” So says Jan Leen van der Vlies, project director at Franki Grondtechnieken. Together with Voorbij Funderingstechniek, Franki Grondtechnieken forms the foundation joint venture contracted by construction consortium De Groene Boog to carry out the foundation work for the A16 Rotterdam project. Jan Leen van der Vlies, Bart de Lange (project manager for the Voorbij-Franki foundation joint venture at De Groene Boog) and Erik Sandifort (project manager at Voorbij Funderingstechniek) talk about a project of phenomenal scale.
At the table from an early stage
“We have been involved since the tender phase,” says Van der Vlies. “We commissioned an engineer to calculate predictions for piling, vibratory driving and pressing. We also investigated whether the site was accessible to the heavy foundation equipment, and contributed to discussions on the final design (DO). In addition, we provided engineering capacity to De Groene Boog to develop the construction design (UO) for 34 cofferdams, namely the North and South approaches and the cut-and-cover section. Working with engineering firm M.U.C. and Hektec, we produced the UO calculations for sheet piles, strut frames and anchors.”
A wide range of work
The foundation joint venture could be described as De Groene Boog’s ‘invisible friend’. Both companies are a striking presence while the work is under way, but their work becomes invisible once the project is complete. De Lange notes: “At peak times, as many as 33 foundation rigs were working at the tunnel at the same time.” The A16 Rotterdam project is divided into 3 sections. Section 1 is by the airport and includes, among other things, the A13 slip roads; section 2 covers construction of the tunnel, while section 3 involves building the flyover over the A20/Terbregseplein. “The project includes a mix of structures, both temporary and permanent,” says Sandifort. “Our work is therefore very varied: constructing retaining structures, pressing sheet piles, installing anchors, foundation work using precast piles (VSP), building piled embankments and constructing combi-walls. Every discipline in our field is involved.”
Rottemerentunnel: piles installed with watchmaker’s precision
“To build the tunnel, we constructed a sheet-pile cofferdam with sheet piles extending for around 7 km. We then installed around 9,000 VSP composite piles along the 2.2 km tunnel route,” says De Lange. “Looking at the tunnel, we began with the culvert beneath Bergweg, where the first sheet piles were pressed and vibrated into place in April 2020. Around 7 km of sheet piling, with two longitudinal walls and cross-walls in between to divide the cofferdam into compartments. In the tunnel cofferdam, we used four types of VSP composite pile: an Octicon 480 core in a 610 tube, an Octicon 430 core in a 560 tube, a #350 core in a 560 tube, and a 320 square precast core in a 508 tube. The Octicon 480 in a 610 tube is a new type, so we specially made moulds for the cores and the drill bit.” Van der Vlies concludes: “The piles in the tunnel cofferdam were installed with real watchmaker’s precision.” This extremely tight dimensional tolerance is necessary because, unlike conventional methods, the underwater concrete slab in this project is poured directly as a structural floor. The piles must therefore be positioned within strict tolerances in every direction, so that divers can install the reinforcement cages underwater over the pile heads, which contain heavy-duty GEWI bars.
Foundation work
In the two years before the De Groene Boog project, the foundation joint venture carried out a major foundation project on Theemsweg in Rotterdam. Voorbij Funderingstechnieken and Franki Grondtechnieken therefore work well together. Voorbij Funderingstechnieken is distinguished by its very broad range of foundation techniques, complemented by a strong position as a supplier of steelwork and precast concrete elements, together with the associated engineering expertise. Since the beginning of the last century, Franki Grondtechnieken has been a specialist company, particularly in deep foundations, with an extensive fleet of equipment across North-West Europe. Together, they make a versatile, powerful joint venture.
Een zakelijke vraag aan Voorbij Funderingstechniek? Get in touch
Who worked on A16 Rotterdam
- consortiumDe Groene BoogMentioned in Project A16 Rotterdam to become the first energy-neutral motorway, including a 2.2 km-long tunnel
- lifting and transport frame
SarensMentioned in Reinforced underwater concrete floor for Rottemerentunnel - supplier of reinforcing steelBCSMentioned in Reinforced underwater concrete floor for Rottemerentunnel
- construction consortium
Van OordMentioned in De Groene Boog aims for maximum reduction in CO2 emissions - construction consortiumDura VermeerMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
- construction consortiumJohn LaingMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
- construction consortiumDe Groene Boog construction consortiumMentioned in GPS-guided precision excavation in the wet cofferdam
- excavation workAannemingsbedrijf Verboon Maasland BVMentioned in GPS-guided precision excavation in the wet cofferdam
- foundation contractor consortiumFranki GrondtechniekenIn this story
- UO calculationsM.U.C.In this story
- UO calculationsHektecIn this story
- reinforcementDiepstraten WapeningstaalMentioned in Specialist reinforcement solutions for 33 structures
- ready-mixed concreteDyckerhoff BasalMentioned in Specially formulated mixes significantly reduce carbon footprint
- waterproofingBrabotechMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
- construction consortiumDe Groene Boog construction consortiumMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
- prefabricatedCiviele technieken deBoerMentioned in A leading name in heavy lifting and specialist transport
- Bonneveld Gewapende Grondconstructies
BonneveldMentioned in One of the largest EPS structures ever built
Keep following this
Get an email when a new story is published. No account needed.
- ProjectA16 Rotterdam
- ThemeUnderground construction
- SubjectRoad construction
- CompanyVoorbij Funderingstechniek
- CompanyFranki Grondtechnieken
- CompanyM.U.C.
- CompanyHektec