1. Grond/Weg/Waterbouw Nederland
  2. Projects
  3. Afsluitdijk

Renovation

Afsluitdijk

Met deze grootschalige renovatie is de Afsluitdijk over vier jaar weer klaar voor de toekomst.

  • Project typeRenovation
  • ClientRijkswaterstaat
  • Stories26
  • Companies involved21
  • Latest story2 October 2026

All stories about this project

Specials

Afsluitdijk reinforcement complete: pumping station and new sluices officially opened

Met Aberdeen
Water infrastructure

Optimal fire safety for the Afsluitdijk

Met Unica Fire Safety
Water infrastructure

A great challenge on the Afsluitdijk: pouring concrete on a 10% slope

Water infrastructure

A complex IT puzzle on the Afsluitdijk

Met Batenburg Industrial Automation
Water infrastructure

‘You can’t see from the outside how much work is being done on the Afsluitdijk’

Met Boskalis, Invesis, IJsselmeerwerken VOF en Provincie Fryslân
Water infrastructure

A sheet pile structure with anchoring has been installed at the Lely monument, halfway along the dyke.

With Bonneveld
News

Hydraulic systems must perform at 100% at all times

Met ELMA
Water infrastructure

Specialist machinery in action

Specials

The most stable revetment of its kind

Met Holcim Coastal
News

‘Placing underwater concrete is all about good planning’

With DISA International
Water infrastructure

Stronger Together, Proud Together

Water infrastructure

Trelleborg Ridderkerk designs and manufactures seals for the Afsluitdijk

Met Trelleborg Ridderkerk
Water infrastructure

Afsluitdijk renovation | Working safely in areas suspected of containing unexploded ordnance

Water infrastructure

Safe driving on the Afsluitdijk thanks to unique safety barrier between the carriageways

Water infrastructure

“Alternative systems are permitted, provided they comply with the rules”

Met Saferoad
Water infrastructure

Afsluitdijk system integration: invisible and indispensable

Met Croonwolter&dros
Water infrastructure

E-engineering: power and data for the renovated Afsluitdijk

Met Hycom
Water infrastructure

Greater discharge capacity through specialist, bespoke pump design

Met Flowserve en Rijkswaterstaat
Water infrastructure

Let it flow when you can, pump when you must!

Water infrastructure

Afsluitdijk renovation is a showcase for the rest of the world

BouwMat

Afsluitdijk reinforcement gets under way

Met Van Oord, BAM en Rebel
BouwMat

Afsluitdijk reinforcement work gets under way

BouwMat

Afsluitdijk reinforcement gets under way

Met Levvel BV
BouwMat

Versterking Afsluitdijk van start

BouwMat

Afsluitdijk reinforcement gets under way

Specials

Afsluitdijk reinforcement gets under way

Who worked on it

  1. bouwcombinatie LevvelVan OordMentioned in Afsluitdijk reinforcement gets under way
  2. bouwcombinatie LevvelBAMMentioned in Afsluitdijk reinforcement gets under way
  3. bouwcombinatie LevvelRebelMentioned in Afsluitdijk reinforcement gets under way
  4. maintenanceLevvel BVMentioned in Afsluitdijk reinforcement gets under way
  5. zes pompenFlowserveMentioned in Greater discharge capacity through specialist, bespoke pump design
  6. clientRijkswaterstaatMentioned in Greater discharge capacity through specialist, bespoke pump design
  7. centrale besturingCroonwolter&drosMentioned in Afsluitdijk system integration: invisible and indispensable
  8. hydrauliekHycomMentioned in E-engineering: power and data for the renovated Afsluitdijk
  9. supplierSaferoadMentioned in “Alternative systems are permitted, provided they comply with the rules”
  10. sealsTrelleborg RidderkerkMentioned in Trelleborg Ridderkerk designs and manufactures seals for the Afsluitdijk
  11. onderwaterbouwDISA InternationalMentioned in ‘Placing underwater concrete is all about good planning’
  12. elektrische besturingELMAMentioned in Hydraulic systems must perform at 100% at all times
  13. Basalton QuattroblocksHolcim CoastalMentioned in The most stable revetment of its kind
  14. technisch integratorBatenburg Industrial AutomationMentioned in A complex IT puzzle on the Afsluitdijk
  15. bouwconsortium LevvelInvesisMentioned in ‘You can’t see from the outside how much work is being done on the Afsluitdijk’
  16. contractors' joint ventureIJsselmeerwerken VOFMentioned in ‘You can’t see from the outside how much work is being done on the Afsluitdijk’
  17. clientProvince of FrieslandMentioned in ‘You can’t see from the outside how much work is being done on the Afsluitdijk’
  18. brandmeld- en ontruimingsinstallatiesUnica Fire SafetyMentioned in Optimal fire safety for the Afsluitdijk
  19. bouwconsortium LevvelAberdeenMentioned in Afsluitdijk reinforcement complete: pumping station and new sluices officially opened

Advertisement

More projects

All projects
Renovation

Krammersluizencomplex

BESIX, ZEEKR, INNOCY and more
Renovation · Súdwest-Fryslân

Krúsrak brug

HWO (Hupkes Wijma & Koninklijke Oosterhof Holman), Bouwcombinatie HWO, Rijkswaterstaat and more
Renovation

Haringvlietbrug

Soltegro, Mobilis, Croonwolter&dros en meer

Follow on Grond/Weg/Waterbouw Nederland

Follow