Expert installation of precast elements
Text Roel van Gils Beeld Aannemings- en Verhuurbedrijf Slob Noordeloos

Since 2021, Aannemings- en Verhuurbedrijf Slob Noordeloos has been installing a wide variety of precast elements on and around the A16 Rotterdam on behalf of construction consortium De Groene Boog. The work ranges from noise barriers and edge elements to abutments and the heat protection in the tunnel structure. All of it is carried out entirely with its own qualified staff and equipment. The company is also providing a number of crucial services for the viaduct over Hoofdweg (KW58).
“We could now describe our approach as learning through doing and being transparent with the client,” says Jonathan Brouwer of Aannemings- en Verhuurbedrijf Slob Noordeloos. “Involving us early on and drawing on our expertise can help clients make the right choices, for example when selecting fixing systems or bedding precast elements using different types of mortar. We also have plenty of experience in logistics. We have been able to apply many of our specialisms on the A16 Rotterdam, and we are still involved, as we will also be working on the construction of KW58 in the coming period.”

Noise barriers from start to finish
Slob Noordeloos began installing the noise barriers along the A16 Rotterdam in late 2021. “We first constructed concrete plug foundations with anchor patterns in various sizes on the tubular piles. All the different anchor patterns were cut from a single mould,” Jonathan explains. “After the concrete plugs had been poured, the steel posts were positioned on them and aligned in the X, Y and Z directions. On the structures, these were then bedded using a special Tikso mortar. The posts on the tubular piles were grouted using a grouting mortar and our forced-action mixer pump. This prevents leaks into the road or rail network below. De Groene Boog then backfilled around the posts up to verge level, allowing us to continue with the final installation of the angle sections. Depending on the location, these were fitted with sound-absorbing Durison elements, glass panels in various sizes, or a combination of glass panels and a concrete kerb.” In total, Slob Noordeloos poured around 1,256 concrete plugs, installed 2,851 A-frames and posts, and fitted 3,214 wood-fibre concrete panels and 2,578 glass panels for the 9,122 linear metres of noise barriers along the A16 Rotterdam.

Diamond pattern on the vacuum pad
After installing the noise barriers, Slob Noordeloos began fitting all the edge elements on the structures and the slope panels beneath them in 2022. “The edge elements were hung from two angle sections that we anchored into the deck,” says Jonathan. “We used our own telehandlers and lifting attachments. De Groene Boog then poured the parapets against them. To install the slope panels, we used our vacuum system, which we had adapted specifically for this project. We had the diamond pattern of the slope panels cut into the rubber profile of our vacuum pad, so we could pick up and install the panels at the correct angle. That is one of our strengths: responding to changing requirements or needs and finding the most efficient way to work. In total, we installed 650 edge elements and 950 slope panels.”

Extensive range of attachments
Speaking of special equipment, Slob Noordeloos also developed a special frame to install the 110 lining walls. “We installed the first batch of lining walls beneath the structure over the A13 in 2021,” Jonathan recalls. “The walls are set at an angle, leaning back by a few degrees. We drove them beneath the structure using a special forklift frame and lowered them from the front of the frame using ratchet hoists, so we could install them directly at the correct angle. The lining walls were then secured through the joints with Allen bolts. It was a demanding job, as the walls weigh between 1.5 and 8.5 tonnes. But as I said, we have a whole range of tilting and positioning frames for manoeuvring and installing panels and elements at every conceivable angle, including in areas with restricted headroom. And if we don’t have the right equipment, we make sure we get it.”

KW58
Construction of the A16 Rotterdam has now entered its final phase, with the new viaduct over Hoofdweg, KW58, as the final piece of the project. “We are making an important contribution here too,” says Jonathan. “To maintain the pace of construction, most of the structure is being built from precast elements. We are installing all of them except for the beams. The work is split into four installation phases, during which we will place a total of 23 columns, 7 U-shaped troughs and 28 precast abutment elements, in a range of sizes and weighing up to 53 tonnes. Working with crane hire company Sarens, we ensure expert installation. We also apply the bedding mortar and grout using our forced-action mixer pump, with different mortar mixes. The key advantage of this pump is that it automatically mixes the mortar to the right consistency and composition, ensuring consistent quality. We will remain involved in the A16 Rotterdam project in phases for some time yet, and other work may come our way in the meantime.”
“Making safe choices is an important part of our work,” says Jonathan. “Experienced people are essential. Documenting safety measures is necessary, but a practical understanding of safe working is a must. That is why we are continually working to get our equipment certified and find working methods that minimise risks. We are happy to take care of the entire package for the client, allowing us to maintain control over stock, logistics and efficient delivery. We do this not only on the A16 Rotterdam, but also on many other infrastructure projects, including the A24 Blankenburgverbinding for BAAK and the widening of the A9 for Veenix.”
A business enquiry for Slob noordeloos b.v? Get in touch
Who worked on A16 Rotterdam
- consortiumDe Groene BoogMentioned in Project A16 Rotterdam to become the first energy-neutral motorway, including a 2.2 km-long tunnel
- lifting and transport frame
SarensMentioned in Reinforced underwater concrete floor for Rottemerentunnel - supplier of reinforcing steelBCSMentioned in Reinforced underwater concrete floor for Rottemerentunnel
- construction consortium
Van OordMentioned in De Groene Boog aims for maximum reduction in CO2 emissions - construction consortiumDura VermeerMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
- construction consortiumJohn LaingMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
- construction consortiumDe Groene Boog construction consortiumMentioned in GPS-guided precision excavation in the wet cofferdam
- excavation workAannemingsbedrijf Verboon Maasland BVMentioned in GPS-guided precision excavation in the wet cofferdam
- foundation contractor consortium
Voorbij FunderingstechniekMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’ - foundation contractor consortiumFranki GrondtechniekenMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
- UO calculationsM.U.C.Mentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
- UO calculationsHektecMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
- reinforcementDiepstraten WapeningstaalMentioned in Specialist reinforcement solutions for 33 structures
- ready-mixed concreteDyckerhoff BasalMentioned in Specially formulated mixes significantly reduce carbon footprint
- waterproofingBrabotechMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
- construction consortiumDe Groene Boog construction consortiumMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
- prefabricatedCiviele technieken deBoerMentioned in A leading name in heavy lifting and specialist transport
- Bonneveld Gewapende Grondconstructies
BonneveldMentioned in One of the largest EPS structures ever built
Keep following this
Get an email when a new story is published. No account needed.
- ProjectA16 Rotterdam
- ThemeMaterials and techniques for infrastructure
- SubjectRoad construction
- CompanySlob noordeloos b.v
- CompanySarens