Bridge construction

450-metre-long viaduct crossing over Terbregseplein completed

450-metre-long viaduct crossing over Terbregseplein completed

Rijkswaterstaat is commissioning the construction of A16 Rotterdam, a new motorway north of Rotterdam linking the A13 and A16. The new motorway includes a 450-metre-long viaduct over the Terbregseplein interchange near Rotterdam. In February 2023, after 15 months, the final section of the viaduct (one carriageway) was moved into its permanent position. Over the weekend of 19 and 20 August, the crossing was completed by lifting 10 precast concrete beams, each weighing 100,000 kg, into place. The beams were installed over the Rotterdam to Gouda railway line and form the final section of the viaduct’s southbound carriageway. This required a closure of the railway line.

Two heavy mobile cranes lifted the beams one by one from a lorry. The lorry drove along the first section of the viaduct to the railway line. Each beam is 30 metres long and 1.3 metres wide. The heavy beams were successfully lifted straight off the lorry and positioned precisely over the railway’s overhead wires. An enormous feat of precision.

Different construction method

Most of the viaduct over Terbregseplein was slowly pushed across the interchange over a period of 15 months, while traffic continued to flow on the motorway below. At the end of February, the final section of the viaduct (towards Breda) was pushed across Terbregseplein using a special launching method. This involves launching a complete bridge deck in sections from one side to the other. The deck sections are built on site and then pushed across the interchange in sections. This method requires far fewer closures, limiting disruption to traffic.  

De video laadt pas als je op afspelen klikt.

Construction continues

The viaduct is not yet complete now that the beams have been installed. We still need to connect the beams in this section of the viaduct to the section that was pushed into place. The viaduct also needs finishing, including the joints, asphalt, road markings and safety barriers. Since February, we have also begun the launching operation for the adjacent carriageway towards Delft / The Hague (A13). The second carriageway is expected to reach the railway line in summer 2024. After the summer, beams will also be installed over the railway for this carriageway, and finishing work can begin.

New motorway: A16 Rotterdam

Rijkswaterstaat is working on A16 Rotterdam, a new motorway between the A13 and A16. The 11-kilometre link is the world’s first energy-neutral motorway with a tunnel. A16 Rotterdam is intended to improve accessibility and liveability in Rotterdam and Lansingerland. A16 Rotterdam is due to open to traffic at the end of 2025.

Question about this story? Ask your question

Who worked on A16 Rotterdam

  1. civil engineering componentsMobilisMentioned in A special launching method on the new A16 Rotterdam
  2. all installationsCroonwolter&drosMentioned in A special launching method on the new A16 Rotterdam
  3. clientRijkswaterstaatMentioned in An innovative launching method for the new A16 Rotterdam
  4. consortiumDe Groene BoogMentioned in Project A16 Rotterdam to become the first energy-neutral motorway, including a 2.2 km-long tunnel
  5. lifting and transport frameSarensMentioned in Reinforced underwater concrete floor for Rottemerentunnel
  6. supplier of reinforcing steelBCSMentioned in Reinforced underwater concrete floor for Rottemerentunnel
  7. diving teamsDISAMentioned in Working underwater is 100% teamwork
  8. construction consortiumBesixMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  9. construction consortiumVan OordMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  10. construction consortiumDura VermeerMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  11. construction consortiumTBIMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  12. construction consortiumRebelMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  13. construction consortiumJohn LaingMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  14. temporary bridgesRetro BridgeMentioned in ‘Safely to the other side’ on the A16 Rotterdam project
  15. reinforced earth structuresVoets Gewapende GrondconstructiesMentioned in Sure footing with geogrids
  16. geogridsHUESKER SyntheticMentioned in Sure footing with geogrids
  17. construction consortiumDe Groene Boog construction consortiumMentioned in GPS-guided precision excavation in the wet cofferdam
  18. excavation workAannemingsbedrijf Verboon Maasland BVMentioned in GPS-guided precision excavation in the wet cofferdam
  19. foundation contractor consortiumVoorbij FunderingstechniekMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  20. foundation contractor consortiumFranki GrondtechniekenMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  21. UO calculationsM.U.C.Mentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  22. UO calculationsHektecMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  23. subcontractorKandtMentioned in ‘A brilliant home fixture’
  24. subcontractorFreyssinetMentioned in Building a viaduct over a live motorway?
  25. reinforcementDiepstraten WapeningstaalMentioned in Specialist reinforcement solutions for 33 structures
  26. culvertsDISA InternationalMentioned in Structured diving operations on the A16 Rotterdam project
  27. ready-mixed concreteDyckerhoff BasalMentioned in Specially formulated mixes significantly reduce carbon footprint
  28. waterproofingBrabotechMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
  29. construction consortiumDe Groene Boog construction consortiumMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
  30. concrete pumpRvR Betonpomp VerhuurMentioned in Piles for traffic gantries drilled ‘remotely’
  31. prefabricatedCiviele technieken deBoerMentioned in A leading name in heavy lifting and specialist transport
  32. formwork specialistDokaMentioned in One-stop shop for shoring and formwork systems
  33. sheet pile profilesArcelorMittalMentioned in Circular sheet piles on the A16 Rotterdam
  34. printing pressDiesekoMentioned in Circular sheet piles on the A16 Rotterdam
  35. Bonneveld Gewapende GrondconstructiesBonneveldMentioned in One of the largest EPS structures ever built
  36. demolition hammersSaes InternationalMentioned in Demolition with military precision

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectA16 Rotterdam
  • ThemeExtending the life of roads and civil engineering structures
  • SubjectBridge construction
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.