Road construction

Circular sheet piles on the A16 Rotterdam

Text Roel van Gils Image ArcelorMittal

Bouwkuipen Rottemerentunnel. (Beeld: Drone Addicts)
Bouwkuipen Rottemerentunnel. (Beeld: Drone Addicts)

Around 20,000 tonnes of ArcelorMittal sheet piles, in a range of sizes from light to heavy, were used on the A16 Rotterdam. Half have since been extracted and added to ArcelorMittal’s stock. They are ready for reuse in future projects. All the sheet piles were made from scrap for maximum sustainability and circularity. But there is more that makes this project special…

Sheet piles used for a temporary structure. (Image: Sjaak Boot Photography)

Construction consortium De Groene Boog called on the global market leader in steel sheet piles early in the project. “We supplied the necessary materials for the pile-driving test before the project began,” says Roel Bijlard of ArcelorMittal. “This allowed the consortium to determine the minimum distance at which they could continue vibrating near the built-up area. Vibrating is faster than pressing, but it causes more noise nuisance. Later, during construction, a noise screen was also used around the rig to reduce noise further.”

Noise screen to further reduce noise for the surrounding area.

Special press-in machine

To save time when pressing in the sheet piles, De Groene Boog approached Dieseko, Roel explains. “A new press-in machine was built specifically for this project. It can press in four single piles at once, and handles the wider 800-series sheet piles too. This Dieseko PVE 4240Z-800 can of course also be used on other projects.” ArcelorMittal supplied just under 20,000 tonnes of sheet piles for the A16 Rotterdam, half of them under a buy-back agreement. “It was indeed a temporary application. Those piles came back over the past year, so we now have 10,000 tonnes of used sheet piles in stock again for new projects, ranging from AZ 18-700 to AZ 46-700N. That is obviously ideal from a circularity and sustainability perspective.” 

New press-in machine in action.

Made from scrap

That means 10,000 tonnes of sheet piles have a permanent role in the project. “Of the 10,000 tonnes of returned piles, 2,500 tonnes had actually been supplied from stock as used piles,” Roel notes. “For this project, we therefore had to produce 17,500 tonnes of new piles from scrap in our electric arc furnace in Luxembourg. This is currently the most environmentally friendly way to produce sheet piles, with CO2 emissions per tonne 4 to 5 times lower than production from iron ore in a blast furnace. A large proportion of the piles were transported by inland waterway vessel to our site in Moerdijk. We built up a stock there because deliveries had to be made extremely quickly. For two months, we sent twelve lorries to the project every day, supplying five rigs across the construction site, mainly for the tunnel, sunken road and access roads. So managing the logistics was quite a challenge too.” 

The lorries travelling between Moerdijk and Rotterdam all ran on HVO 100 biofuel, which also delivered maximum CO2 emissions savings. For ArcelorMittal, the project is now complete. “We are now looking for a new use for the 10,000 tonnes of sheet piles from the project, so that the next project can also be carried out with maximum sustainability and circularity.”     

Een zakelijke vraag aan ArcelorMittal Projects Europe B.V.? Get in touch

Who worked on A16 Rotterdam

  1. civil engineering componentsMobilisMentioned in A special launching method on the new A16 Rotterdam
  2. all installationsCroonwolter&drosMentioned in A special launching method on the new A16 Rotterdam
  3. clientRijkswaterstaatMentioned in An innovative launching method for the new A16 Rotterdam
  4. consortiumDe Groene BoogMentioned in Project A16 Rotterdam to become the first energy-neutral motorway, including a 2.2 km-long tunnel
  5. lifting and transport frameSarensMentioned in Reinforced underwater concrete floor for Rottemerentunnel
  6. supplier of reinforcing steelBCSMentioned in Reinforced underwater concrete floor for Rottemerentunnel
  7. diving teamsDISAMentioned in Working underwater is 100% teamwork
  8. construction consortiumBesixMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  9. construction consortiumVan OordMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  10. construction consortiumDura VermeerMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  11. construction consortiumTBIMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  12. construction consortiumRebelMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  13. construction consortiumJohn LaingMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  14. temporary bridgesRetro BridgeMentioned in ‘Safely to the other side’ on the A16 Rotterdam project
  15. reinforced earth structuresVoets Gewapende GrondconstructiesMentioned in Sure footing with geogrids
  16. geogridsHUESKER SyntheticMentioned in Sure footing with geogrids
  17. construction consortiumDe Groene Boog construction consortiumMentioned in GPS-guided precision excavation in the wet cofferdam
  18. excavation workAannemingsbedrijf Verboon Maasland BVMentioned in GPS-guided precision excavation in the wet cofferdam
  19. foundation contractor consortiumVoorbij FunderingstechniekMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  20. foundation contractor consortiumFranki GrondtechniekenMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  21. UO calculationsM.U.C.Mentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  22. UO calculationsHektecMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  23. subcontractorKandtMentioned in ‘A brilliant home fixture’
  24. subcontractorFreyssinetMentioned in Building a viaduct over a live motorway?
  25. reinforcementDiepstraten WapeningstaalMentioned in Specialist reinforcement solutions for 33 structures
  26. culvertsDISA InternationalMentioned in Structured diving operations on the A16 Rotterdam project
  27. ready-mixed concreteDyckerhoff BasalMentioned in Specially formulated mixes significantly reduce carbon footprint
  28. waterproofingBrabotechMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
  29. construction consortiumDe Groene Boog construction consortiumMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
  30. concrete pumpRvR Betonpomp VerhuurMentioned in Piles for traffic gantries drilled ‘remotely’
  31. prefabricatedCiviele technieken deBoerMentioned in A leading name in heavy lifting and specialist transport
  32. formwork specialistDokaMentioned in One-stop shop for shoring and formwork systems
  33. sheet pile profilesArcelorMittalIn this story
  34. printing pressDiesekoIn this story
  35. Bonneveld Gewapende GrondconstructiesBonneveldMentioned in One of the largest EPS structures ever built
  36. demolition hammersSaes InternationalMentioned in Demolition with military precision

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectA16 Rotterdam
  • ThemeUnderground construction
  • SubjectRoad construction
  • CompanyArcelorMittal Projects Europe B.V.
  • CompanyDieseko Group
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.