Bespoke anchor chairs and foundation components
Text Roel van Gils Beeld Ton van Leeuwen Snijwerken

A network of specialist companies is working on the Neder-Betuwe dyke reinforcement project, ensuring that every detail is right. Ton van Leeuwen Snijwerken is making an important contribution to the anchoring structures. It is an assignment the team can rightly be proud of.
The assignment came about through close collaboration with High 5 Solutions, a specialist in installing anchors. “Thanks to the strong relationship we have built up over the years, the decision was an easy one: we would take on this challenge together too,” says Erwin Werrie of Ton van Leeuwen Snijwerken. “For this project, we supply the anchor chairs on demand, and we also supply various supporting foundation components directly to the dyke alliance.”
Execution class 3
An anchor chair may look like a simple component at first glance, but appearances can be deceptive. The connection piece transfers the load from the sheet pile into the anchor. “The structure consists of a base plate in various sizes and thicknesses, with an angled hole cut into it,” Erwin explains. “We then weld a thick-walled tube onto the plate, welding it all the way round. We also supply a special concave-convex ring system separately.” The entire production process is carried out to execution class 3, which imposes stringent requirements on quality, documentation and inspection.
Full traceability
Quality assurance is an important part of the assignment. “An independent party carries out the quality inspections,” says Erwin. “During the preparation stage, we contributed ideas on how to structure the documentation and processes. Together, we developed a system in which all information is carefully recorded. On a project of this scale, full traceability is essential: everything, from the materials purchased to the finished product, must be verifiable and traceable.”

Production on demand
Ton van Leeuwen Snijwerken has already purchased all the plate and tube material for this project. “Production of the anchor chairs is phased and carried out on demand. As soon as a new sheet pile section is released, we start producing the associated components. This gives the construction team flexibility and the client certainty.”
End plates and flag plates
In addition to the anchor chairs, Ton van Leeuwen Snijwerken also supplies various auxiliary materials directly to the dyke alliance, including end plates for walers and special flag plates between the sheet piles and the waler beams. “We supplied these components ‘factory finished’, with bevels already cut, so no further processing was needed on site,” Erwin explains.
The smartest solution
As an experienced supplier to dyke reinforcement projects, Ton van Leeuwen Snijwerken understands its clients’ needs. “We often contribute ideas as early as the design stage, because we know better than anyone how this kind of foundation work fits together, from sheet piles and walers to auxiliary materials and anchoring accessories,” says Erwin. “Although digitalisation and automation are playing an increasingly important role in our processes, we place great value on personal contact. It is appreciated and means that we not only supply what is requested, but can also contribute ideas on the smartest solution.”
Een zakelijke vraag aan Ton van Leeuwen Snijwerken? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeUnderground construction
- SubjectFoundations
- CompanyTon van Leeuwen Snijwerken