Dijkversterking Arcen

Grouted anchors provide stability on the banks of the Meuse

Text Suzanne van Gaale Beeld Dijkzone Alliantie Arcen

Hakkers heeft 21 groutinjectieankers onder een hoek van 40 graden aangebracht.
Hakkers heeft 21 groutinjectieankers onder een hoek van 40 graden aangebracht.

Specialist foundation work for a safe flood defence

Using HVSi foundation piles and grouted injection anchors, Hakkers Funderingstechniek laid the foundations for a safe flood defence in Arcen. For the first phase of the project, the foundation specialist installed the foundations for the flood defence at the La Tour Meuse apartment complex. Installing the grouted injection anchors (self-drilling grouted anchors) beneath the slope of the Meuse required specialist expertise and a carefully prepared geotechnical design.

“The detailed design was already in place, having been prepared by Dijkzone Alliantie Arcen,” says Arnoud Hoeve, tender manager at Hakkers Funderingstechniek. “The question was: ‘Could the design actually be built as envisaged?’ So we focused mainly on reviewing the construction method, while also contributing to various details. A good example is the connection between the grouted injection anchors, the tubular piles and the concrete floor. It is precisely in details like these that you can make significant gains during construction.”

A challenge beneath the slope of the Meuse

Phase 1 focused on the flood defence at the La Tour Meuse apartment complex. A 75-metre-long concrete L-wall was installed here, supported by 51 bored HVSi tubular piles, each 6.5 metres long. During high water, the water exerts a considerable horizontal load on this structure. To safely withstand these forces, Hakkers installed 21 grouted injection anchors, each 400 millimetres in diameter, at an angle of 40 degrees. The grouted injection anchors were supplied by GeotechMetals, a supplier of anchoring and foundation systems and part of the Hakkers Groep. Arnoud says: “These anchors posed the project’s greatest technical challenge. The grout body is located beneath the sloping bank of the Meuse. Standard design methods for grouted anchors assume level ground, but here we had to take account of a sharply sloping surface.”

Calculations showed that the stability of the soil mass was ensured with the anchors at an angle of 40 degrees.

Geotechnical analysis provides certainty

An additional geotechnical analysis was carried out in PLAXIS to determine whether the limited soil cover above the grouted anchors was sufficient. This assessed the effect of the sloping bank of the Meuse on the stability of the grout body. The calculations showed that the stability of the soil mass was ensured with the anchors at an angle of 40 degrees. Marinus de Heus, commercial technical adviser, says: “This was an unusual situation for us. It is not often that you see a grouted anchor installed almost parallel to the slope of a Meuse riverbank. That made it especially important to develop the geotechnical design with care.”

Next phases in Arcen Midden and Zuid

The successful completion of the first phase has led to a follow-up contract within the same project. This autumn, Hakkers Funderingstechniek will install the foundations, comprising 209 grouted injection anchor piles, for the self-closing flood defence and glass flood defence in Arcen Midden. The company will also install the foundations for the new Watermolen pumping station in Arcen Zuid. Marinus says the project illustrates how important foundation engineering is to an integrated dike reinforcement scheme. “This project is special for us because of its location and the prominent structure. Once the work is complete, you can no longer see what we have done, but we provide the stability on which the entire structure can ultimately rely.”

Question about this story? Ask your question

Wie aan Dijkversterking Arcen werkte

  1. geotechnisch specialistFugroMentioned in The added value of geotechnical investigations in the Arcen dike reinforcement project
  2. gras- en kruidenmengselsDSV ZadenMentioned in Strong dikes start with strong grass
  3. combinantPloegamMentioned in Strong dikes start with strong grass
  4. regular contractorGW LeidingtechniekMentioned in Future-proof pressure main route in a new dike structure
  5. foundation specialistHakkers FunderingstechniekIn this story
  6. drie verticale pompenPentairMentioned in Compactly designed pumps for low and high water levels at Arcen

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDijkversterking Arcen
  • ThemeFlood protection and climate-resilient water management
  • SubjectDijkversterking Arcen
  • CompanyHakkers Funderingstechniek