‘Safely to the other side’ on the A16 Rotterdam project

To enable safe crossings and create dedicated construction roads that do not add to the traffic on the underlying and surrounding road network, construction consortium De Groene Boog called on Retrobridge. The Retro Bridge Group is one of Europe’s leading suppliers of modular bridge systems. Its Dutch branch in Den Bosch was set up and is managed by Han Kastermans. He takes us through the various solutions that make it possible to cross in each of the three sections of the A16 Rotterdam project.

Three types of bridge used
“We started at the slip road to the A20 and finished at the A13,” says Kastermans. “In total, there are 13 temporary bridges across the 3 sections. Three types of bridge were used: the Retro Heavy Bridge, the Retro Light Bridge and the Retro Beam Bridge.” The Retro Heavy Bridge was the first type of bridge developed by Retro Bridge. Kastermans explains: “This bridge can be used for spans of up to 48 metres, but anything over 27 metres is ‘oversized’. That is why the Retro Light Bridge was developed. It spans up to 31.5 metres and can carry the same maximum load as its bigger sibling. Using higher-strength steel means the Light version can have a slimmer profile.”

Kastermans describes the Retro Beam Bridge as a “refined shoring panel”. “The bridge is made by welding a number of HE beams together, on the inside and outside. A prefabricated safety barrier is fitted on one side. The bridge is supplied for spans of 10.5 metres, 13.5 metres, 16 metres and 19 metres, and cannot be extended by connecting sections lengthwise. However, it can be configured for road widths in multiples of 1.8 metres.” The Retro Heavy Bridge, meanwhile, has a maximum road width of 250 cm. “The three types of bridge were chosen according to the requirements at each location. Broadly speaking, we distinguish between two types of users: contractors on the one hand, and public road users on the other.”



14,000 tonnes of bridge components
The thirteen bridges are temporary solutions, built in 2019 and 2020, and due to be removed in 2022 and 2023. “The rental periods range from 33 to 149 weeks,” Kastermans calculates. “Retrobridge Nederland BV hires these components from Retrobridge Holding. From Den Bosch, we assemble the bridges ordered and transport them to their locations. We pass on part of the rental income we receive to Retro Bridge Holding. The Holding has a total of 14,000 tonnes of bridge components, with an occupancy rate of 90%. That is why, I think, you will find us on almost every major infrastructure project.”
Een zakelijke vraag aan Retro Bridge Nederland? Get in touch
Who worked on A16 Rotterdam
- consortiumDe Groene BoogMentioned in Project A16 Rotterdam to become the first energy-neutral motorway, including a 2.2 km-long tunnel
- lifting and transport frame
SarensMentioned in Reinforced underwater concrete floor for Rottemerentunnel - supplier of reinforcing steelBCSMentioned in Reinforced underwater concrete floor for Rottemerentunnel
- construction consortium
Van OordMentioned in De Groene Boog aims for maximum reduction in CO2 emissions - construction consortiumDura VermeerMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
- construction consortiumJohn LaingMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
- construction consortiumDe Groene Boog construction consortiumMentioned in GPS-guided precision excavation in the wet cofferdam
- excavation workAannemingsbedrijf Verboon Maasland BVMentioned in GPS-guided precision excavation in the wet cofferdam
- foundation contractor consortium
Voorbij FunderingstechniekMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’ - foundation contractor consortiumFranki GrondtechniekenMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
- UO calculationsM.U.C.Mentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
- UO calculationsHektecMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
- reinforcementDiepstraten WapeningstaalMentioned in Specialist reinforcement solutions for 33 structures
- ready-mixed concreteDyckerhoff BasalMentioned in Specially formulated mixes significantly reduce carbon footprint
- waterproofingBrabotechMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
- construction consortiumDe Groene Boog construction consortiumMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
- prefabricatedCiviele technieken deBoerMentioned in A leading name in heavy lifting and specialist transport
- Bonneveld Gewapende Grondconstructies
BonneveldMentioned in One of the largest EPS structures ever built
Keep following this
Get an email when a new story is published. No account needed.
- ProjectA16 Rotterdam
- SubjectRoad construction
- CompanyRetro Bridge Nederland