Road construction

‘Safely to the other side’ on the A16 Rotterdam project

Location TK22B, Retro Light Bridge.
Location TK22B, Retro Light Bridge.

To enable safe crossings and create dedicated construction roads that do not add to the traffic on the underlying and surrounding road network, construction consortium De Groene Boog called on Retrobridge. The Retro Bridge Group is one of Europe’s leading suppliers of modular bridge systems. Its Dutch branch in Den Bosch was set up and is managed by Han Kastermans. He takes us through the various solutions that make it possible to cross in each of the three sections of the A16 Rotterdam project.

TK40B South location, Rotte, Retro Heavy Bridge.

Three types of bridge used

“We started at the slip road to the A20 and finished at the A13,” says Kastermans. “In total, there are 13 temporary bridges across the 3 sections. Three types of bridge were used: the Retro Heavy Bridge, the Retro Light Bridge and the Retro Beam Bridge.” The Retro Heavy Bridge was the first type of bridge developed by Retro Bridge. Kastermans explains: “This bridge can be used for spans of up to 48 metres, but anything over 27 metres is ‘oversized’. That is why the Retro Light Bridge was developed. It spans up to 31.5 metres and can carry the same maximum load as its bigger sibling. Using higher-strength steel means the Light version can have a slimmer profile.”

TK40B North location, Rotte, Retro Heavy Bridge.

Kastermans describes the Retro Beam Bridge as a “refined shoring panel”. “The bridge is made by welding a number of HE beams together, on the inside and outside. A prefabricated safety barrier is fitted on one side. The bridge is supplied for spans of 10.5 metres, 13.5 metres, 16 metres and 19 metres, and cannot be extended by connecting sections lengthwise. However, it can be configured for road widths in multiples of 1.8 metres.” The Retro Heavy Bridge, meanwhile, has a maximum road width of 250 cm. “The three types of bridge were chosen according to the requirements at each location. Broadly speaking, we distinguish between two types of users: contractors on the one hand, and public road users on the other.”

TK50B location, Retro Light Bridge.
TK40B South location, Rotte, Retro Light Bridge, and TK25, Retro Light Bridge.
TK40V location, Retro Light Bridge.

14,000 tonnes of bridge components

The thirteen bridges are temporary solutions, built in 2019 and 2020, and due to be removed in 2022 and 2023. “The rental periods range from 33 to 149 weeks,” Kastermans calculates. “Retrobridge Nederland BV hires these components from Retrobridge Holding. From Den Bosch, we assemble the bridges ordered and transport them to their locations. We pass on part of the rental income we receive to Retro Bridge Holding. The Holding has a total of 14,000 tonnes of bridge components, with an occupancy rate of 90%. That is why, I think, you will find us on almost every major infrastructure project.”     

Een zakelijke vraag aan Retro Bridge Nederland? Get in touch

Who worked on A16 Rotterdam

  1. civil engineering componentsMobilisMentioned in A special launching method on the new A16 Rotterdam
  2. all installationsCroonwolter&drosMentioned in A special launching method on the new A16 Rotterdam
  3. clientRijkswaterstaatMentioned in An innovative launching method for the new A16 Rotterdam
  4. consortiumDe Groene BoogMentioned in Project A16 Rotterdam to become the first energy-neutral motorway, including a 2.2 km-long tunnel
  5. lifting and transport frameSarensMentioned in Reinforced underwater concrete floor for Rottemerentunnel
  6. supplier of reinforcing steelBCSMentioned in Reinforced underwater concrete floor for Rottemerentunnel
  7. diving teamsDISAMentioned in Working underwater is 100% teamwork
  8. construction consortiumBesixMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  9. construction consortiumVan OordMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  10. construction consortiumDura VermeerMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  11. construction consortiumTBIMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  12. construction consortiumRebelMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  13. construction consortiumJohn LaingMentioned in De Groene Boog aims for maximum reduction in CO2 emissions
  14. temporary bridgesRetro BridgeIn this story
  15. reinforced earth structuresVoets Gewapende GrondconstructiesMentioned in Sure footing with geogrids
  16. geogridsHUESKER SyntheticMentioned in Sure footing with geogrids
  17. construction consortiumDe Groene Boog construction consortiumMentioned in GPS-guided precision excavation in the wet cofferdam
  18. excavation workAannemingsbedrijf Verboon Maasland BVMentioned in GPS-guided precision excavation in the wet cofferdam
  19. foundation contractor consortiumVoorbij FunderingstechniekMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  20. foundation contractor consortiumFranki GrondtechniekenMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  21. UO calculationsM.U.C.Mentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  22. UO calculationsHektecMentioned in The foundation joint venture is De Groene Boog’s ‘invisible friend’
  23. subcontractorKandtMentioned in ‘A brilliant home fixture’
  24. subcontractorFreyssinetMentioned in Building a viaduct over a live motorway?
  25. reinforcementDiepstraten WapeningstaalMentioned in Specialist reinforcement solutions for 33 structures
  26. culvertsDISA InternationalMentioned in Structured diving operations on the A16 Rotterdam project
  27. ready-mixed concreteDyckerhoff BasalMentioned in Specially formulated mixes significantly reduce carbon footprint
  28. waterproofingBrabotechMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
  29. construction consortiumDe Groene Boog construction consortiumMentioned in Watertight construction with flexible joint seals and a liquid-tight layer
  30. concrete pumpRvR Betonpomp VerhuurMentioned in Piles for traffic gantries drilled ‘remotely’
  31. prefabricatedCiviele technieken deBoerMentioned in A leading name in heavy lifting and specialist transport
  32. formwork specialistDokaMentioned in One-stop shop for shoring and formwork systems
  33. sheet pile profilesArcelorMittalMentioned in Circular sheet piles on the A16 Rotterdam
  34. printing pressDiesekoMentioned in Circular sheet piles on the A16 Rotterdam
  35. Bonneveld Gewapende GrondconstructiesBonneveldMentioned in One of the largest EPS structures ever built
  36. demolition hammersSaes InternationalMentioned in Demolition with military precision

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectA16 Rotterdam
  • SubjectRoad construction
  • CompanyRetro Bridge Nederland
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.