With several ‘high points’

After an ageing sewer pipeline along the Polderbaan at Schiphol had caused several leaks, Hoogheemraadschap van Rijnland decided to replace the entire route. To ensure drainage could continue during the works, a temporary bypass first had to be installed. VandeGrijp Rental was commissioned to supply seven kilometres of steel pipeline, including several notable features in the form of smart crossings and pipe bridges.

The ageing GRP sewer pipeline had caused several leaks over the past ten years. Sewage entered the surrounding agricultural land, with all the environmental and financial consequences that entailed. Emergency repairs provided temporary relief each time, but a permanent solution was needed. Before the existing pipeline could be replaced, a temporary bypass had to be installed first to ensure drainage could continue. For VandeGrijp Rental, this was a major contract.

The temporary bypass used 600- and 700-millimetre pipelines.

Quick to get up and running

“When we received the contract, the bypass needed to be operational as quickly as possible,” says Thijs van Hemert of VandeGrijp Rental. “The temporary pipeline was essential to eliminate the risks and give our client time to prepare carefully for the permanent replacement.” The original arrangement consisted of two pipelines, each 700 millimetres in diameter. The temporary bypass used 600- and 700-millimetre pipelines. VandeGrijp Rental supplied around seven kilometres of pipeline sections, each six to twelve metres long, including bends, couplings and other components. In total, around eighty lorries made repeated trips to deliver all the materials to the site.

Jumpers

The temporary pipeline runs parallel to the Polderbaan, and its installation presented several challenges. Roads, ditches and access routes had to be crossed without restricting access. “At several locations, we built what we call jumpers: temporary pipeline spans that allow traffic, agricultural vehicles and emergency services to pass unhindered,” says Thomas ten Hagen of VandeGrijp Rental. One of the most striking structures is near Schiphol’s spotters’ area. “There, the pipeline crosses a roundabout, while special, or rather tall, airport fire engines must still be able to pass unhindered. We designed a three-legged span with a clear span of around thirty metres and a clearance height of six metres.”

An example of practical problem-solving: the temporary pipe bridge over the watercourse.

Pipeline sections used as a bridge

Another example of practical problem-solving was the temporary pipe bridge over a watercourse around thirty metres wide. Rather than hiring an expensive temporary bridge structure, VandeGrijp Rental devised an alternative using ‘brilstukken’, large-diameter pipe sections of one metre used as a supporting structure. The temporary bypass could then simply be routed over them. “It was a simple but effective solution, and ultimately much cheaper for the contractor,” says Thomas.

For the bypass, VandeGrip Rental supplied around seven kilometres of pipeline sections, each six to twelve metres long, including bends, couplings and other components.

Challenging schedule

VandeGrijp Rental designed all the spans and provided stability calculations, Thijs stresses. Specialist partners carried out the installation, while VandeGrijp Rental was responsible for the engineering, supply and logistical coordination. “The weather made installation quite challenging,” says Thomas. “Most of the work took place in winter, resulting in heavy rain and waterlogged fields. Temporary access roads had to be laid to enable transport. This required a great deal of planning and coordination. That is another of our strengths: responding quickly and ensuring the materials are in the right place at the right time.”

After an installation period of around twelve weeks, the bypass was fully operational. The temporary pipeline has now been in place for more than a year and a half, and the replacement project is nearing completion. The materials will then return to VandeGrijp Rental for inspection and maintenance before being deployed again.

Een zakelijke vraag aan VandeGrijp Rental? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeMaterials and techniques for infrastructure
  • SubjectUnderground construction
  • CompanyVandeGrijp Rental
Share this article

Advertisement

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.