Water infrastructure

Smarter hydraulics give Krammersluizen extra capacity

Text Roel van Gils Images Bosch Rexroth

Bosch Rexroth hydraulic power unit (HPU).
Bosch Rexroth hydraulic power unit (HPU).

What began as a relatively contained engineering assignment has grown into a major modernisation of the hydraulic installations as part of the Krammersluizen renovation. As the hydraulics partner in the ZEEKR consortium, Bosch Rexroth is responsible for the project’s hydraulic systems, from the rolling gates of the commercial shipping locks and the mitre gates of the leisure craft locks to the wall sluices and the new flushing and fish passage facility.

The challenge lies not only in the scale of the work, but above all in the diversity of the structures and installations. “The original assignment focused on renewing the hydraulic system in the rolling gates and overhauling the cylinders,” says project manager Jan Smits. “As the project progressed, it became clear that completely replacing the hydraulic power units (HPUs) in several locations was the best solution. This not only improves reliability, but also brings the installations into line with current safety requirements and machinery regulations.”

Twenty seconds faster

One of the most notable improvements is in the hydraulic drive system for the rolling gates of the commercial shipping locks. During the design phase, Bosch Rexroth investigated how the gates could be moved faster. “By adding an extra hydraulic circuit and combining functions more intelligently, we can activate the cylinders sooner,” explains Ronald Manders, head of application engineering at Bosch Rexroth. “That saves us about twenty seconds per movement.” This may seem a small gain, but it has a significant impact on overall energy consumption. The shorter operating time means that auxiliary systems, such as the bubble screen, need to run for less time. The result is a more energy-efficient overall design.

Bosch Rexroth employees working on the HPU.

Safety brings a second major benefit

The entire hydraulic installation for the five rolling gates is being renewed, says Hans Kastelijn, head of design and project engineering at Bosch Rexroth. “New stainless steel pipework, completely new HPUs built to Rijkswaterstaat’s guidelines and overhauled cylinders will deliver a future-proof system capable of withstanding the harsh conditions at the lock gates.” Alongside improving speed, Bosch Rexroth has also taken a close look at the safety of the rolling gates’ hydraulic system. “At the client’s request, we have added several safety functions to the hydraulic circuit,” says Marcel van den Hurk, application engineer at Bosch Rexroth. “The system has been modified so that movements can be stopped immediately in an emergency and the gate remains in a safe position when necessary. We have also prevented unwanted movement caused by wave action or water pressure.”

The Bosch Rexroth project team working on the Krammersluizen project.

From renovation to complete replacement

Bosch Rexroth’s scope of work also grew considerably at the leisure craft locks. Initially, only components were to be replaced, but on-site inspections showed that replacing the hydraulic units in their entirety would provide greater certainty. “With new HPUs, we can test the complete installation in advance and rule out risks such as contamination in existing systems,” says Hans.

The same applies to the ten hydraulic installations for the wall sluices, which regulate the water level in the lock chambers. Here too, complete units and pipework are being replaced to bring the installations fully into line with current standards.

Part of the Bosch Rexroth team at Krammersluizen.. (Image: Jan Smith)

One team, several countries

One of Bosch Rexroth’s particular strengths is the international collaboration within the company. While Dutch engineers are responsible for project coordination, engineering and on-site commissioning, colleagues in Belgium and Austria make a major contribution to production, detailing and factory acceptance testing. “This collaboration allows us to scale up capacity flexibly and share knowledge among specialists. All parties also work in a single BIM environment and collaborate closely with consortium partners and Rijkswaterstaat from the same project site. It is easy to drop in on one another, discuss ideas straight away and improve the design together,” says Jan, describing the situation in the site office. “That means short lines of communication, a high level of trust and, ultimately, better solutions.”

With the first conversion of a rolling gate scheduled for this summer and work on the leisure craft locks starting in September, implementation is now fast approaching, the men note. “A project that began with a new approach to how the rolling gate hydraulics operate has grown into a large-scale hydraulic modernisation that will prepare the entire Krammersluizen complex for the future.”

A business enquiry for Bosch Rexroth? Get in touch

Who worked on Krammersluizencomplex

  1. main contractorBESIXMentioned in The power of systems integration in the renovation of the Krammer Locks complex
  2. constructionZEEKRMentioned in The power of systems integration in the renovation of the Krammer Locks complex
  3. system integrationINNOCYMentioned in The power of systems integration in the renovation of the Krammer Locks complex
  4. system integrationCPM ConsultancyMentioned in The power of systems integration in the renovation of the Krammer Locks complex
  5. renovationZEEKR combinationMentioned in Krammer Locks under scrutiny
  6. hydraulics partnerBosch RexrothIn this story
  7. replacement, renovation and modificationIemantsMentioned in Modified 400-tonne lock gates improve the lockage process
  8. renovationSmuldersMentioned in Renovating the Netherlands’ largest concrete structure
  9. mechanical installationsDemakoMentioned in Champions League standard in mechanical engineering
  10. subcontractorDISA InternationalMentioned in The foundations for a new pumping station are being laid underwater
  11. specialistBon & MeesMentioned in The art of replacing lock gates
  12. concrete repairBE InjectMentioned in Concrete repairs under high voltage
  13. independent baseline inspectionA-QuinMentioned in Independent baseline inspection prevents surprises
  14. directorAmstelland IngenieursMentioned in From design to maintenance: an integrated approach to the Krammer Locks
  15. machinery safety consultantKaderMentioned in CE marking for one of the Netherlands’ most complex lock projects
  16. lead hydraulic engineering engineerHessel Voortman Engineering ConsultancyMentioned in A masterclass in hydraulic engineering
  17. engineering consultancyBT EngineeringMentioned in From pencil drawings to a digital blueprint
  18. engineering consultancyMBM EngineersMentioned in From pencil drawings to a digital blueprint
  19. engineering consultancyMaters & De KoningMentioned in From pencil drawings to a digital blueprint

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKrammersluizencomplex
  • ThemeExtending the life of roads and civil engineering structures
  • SubjectWater infrastructure
  • CompanyBosch Rexroth
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.