
Delivering quality just above the waterline
As part of the G-Kracht project, the pipes installed behind the original quay wall are connected at the top by a welded structure.

Making steel more sustainable over the course of the project

Quay Wall Innovation Partnership: cheaper, faster and less disruption

Tilting weirs and overflow chambers from Kesteren

Filter wells installed with a ‘factory on wheels’

Three design-and-build projects working towards one goal

‘Sustainable design need not cost more’

Specialists in sewerage and concrete engineering

From fossil fuel to electric

Greater focus on mechanical engineering in civil structures

Innovation Partnership for Quay Walls: cheaper, faster and with less disruption

Permanent, nature-friendly erosion protection for banks

Installing bank protection at temporary unloading sites

200,000 tonnes of high-quality clay for dykes

Prefabricated walkways and jetty for Selectieve Onttrekking

Versatile specialist in steel temporary works presses ahead on the Selective Withdrawal

High-quality marine structures

Strong in scaffolding and support structures

A massive structure with minimal tolerances

Versatility and expertise in the depths of Zeesluis IJmuiden

The scale of the project calls for enormous quantities of formwork

Sustainable steel

Offshore diving experience proves invaluable on Selective Extraction project

An innovative project for water quality and safety
Elke twee weken het beste van Grond/Weg/Waterbouw Nederland in je inbox.
- Projects, products, solutions and partners
- The most interesting industry developments
- Free and without further obligation
Sign up for free
In your inbox every fortnight.








