Offshore diving experience proves invaluable on Selective Extraction project
Text Roel van GilsImage Boskalis INDS

Keeping diving work to a minimum
The construction of the Selective Extraction project at Zeesluis IJmuiden would not be possible without divers. Diving is not dangerous, but it is a method that carries risks. This is one reason why Boskalis Nederland’s diving division (INDS) is supporting main contractor Van Hattum Blankevoort in optimising the design. Underwater drones are also being used for inspections, keeping the need for divers to a minimum.
Since 1 January 2023, former Boskalis Offshore Subsea Services has been fully integrated into Boskalis Nederland. “Our offshore expertise has also proved highly valuable in the civil engineering market,” says Max Schellenbach, Manager Inshore & Nearshore Diving Services B.V. (INDS) at Boskalis Nederland. “Naturally, we remain just as active offshore, working on projects such as wind farms and other renewables-related schemes, but we also have a strong focus on inland infrastructure. We are used to working with contractor consortia and were also ideally qualified for the Selective Extraction project.”

Challenging diving work
Boskalis INDS was closely involved at the preliminary stage, helping to keep diving work to a minimum. “We are assisting Van Hattum Blankevoort with all the civil engineering work below the waterline on the Selective Extraction project,” explains Max. “For example, we are involved in building the north and south abutments in 33 metres of water. We also oversaw construction of the cofferdams and installation of both piers, north and south. Our tasks included installing the jacks and burning or cutting off tubular piles and combi-walls, before positioning the piers to centimetre-level accuracy. It is quite a challenging job at great depth and with very tight tolerances. It calls for a sound dive plan, a well-oiled operation and the right equipment. This is where our global experience in the offshore industry comes in handy.”
Unusual structures
Boskalis Nederland’s diving division is also involved in installing the hydraulic skirts on the north and south sides, as well as the three retaining screens. “We are also installing the four fish passages on the abutments and piers,” says Max. “The passages on the piers are a particularly unusual structure, as each is suspended from the pier by two H-beams. The same applies to the hydraulic skirts on the abutments, because the combi-wall curves. As a result, each bay has different dimensions. At the abutments, we also supervised the underwater concrete pour and installed the GEWI anchors.”
NINA
Boskalis Nederland’s diving division is familiar with the area around the sea lock. “We carried out diving work earlier during construction of the sea lock, including the placement of 30,000 m3 of underwater concrete,” says Max. He adds that the company is investing heavily in safe working practices above and below water. This includes the use of robotics and sonar systems, as well as its own NINA safety programme, which stands for ‘No Injuries No Accidents’. “Boskalis has been working on this since 2008 and is a frontrunner in creating a safe working environment. We are also certified at step 4 of the Safety Culture Ladder.”
Een zakelijke vraag aan Boskalis Nederland? Get in touch
Who worked on Selectieve Onttrekking
- construction companyVan Hattum en BlankevoortMentioned in An innovative project for water quality and safety
- main contractorVan Hattum BlankevoortIn this story
- temporary steel structures
Marsé MontageMentioned in Versatile specialist in steel temporary works presses ahead on the Selective Withdrawal - lifting cushion and bearing
TrelleborgMentioned in Trelleborg devises ingenious solution for Selective Extraction IJmuiden Sea Lock walls
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSelectieve Onttrekking
- SubjectWater infrastructure
- CompanyVan Hattum Blankevoort
- CompanyBoskalis Nederland


















