500,000 tonnes of natural stone used in the Julianakanaal
Text Suzanne van Gaale Images ROXX International

A small family business with a big presence in the supply of civil engineering materials such as rock armour (water engineering stone), crushed stone (aggregates) and masonry stone. That, in a nutshell, is the strength of Roxx International BV. For the widening of the Julianakanaal, it supplied no fewer than 500,000 tonnes of various types of natural stone from Belgium, Germany, Norway and France.
“As an independent trading company, we are the link between producers, the authorities and customers,” says Roy Maassen, managing director and owner of Roxx International BV. “We supply stone for water and road engineering, with water engineering projects being our speciality. The stone is used for bank, coastal and bed protection. Our small size means we can respond quickly, are always on hand and can deliver at short notice when customers need us to. We are therefore receiving urgent requests with increasing regularity. We recently delivered stone within 12 hours for the temporary and permanent defences at Bosscherveld in Maastricht, after a dam breach caused problems for around a dozen houseboats and the surrounding area. Assignments like this depend on mutual trust.”

Capacity and quality
99% of the material supplied by Roxx International goes directly from quarries in Belgium, Germany, France and Norway to the relevant client’s site. The stone for the Julianakanaal was no exception. Roxx International supplied a total of 500,000 tonnes of material. “Capacity and quality were the two most important factors for Van den Herik when requesting a quote from us. Between April and October 2024, we supplied most of the required quantity from the various quarries. The materials included several types of stone, ranging from granite and limestone to flint and specially selected coarse rounded gravel. Throughout the delivery period, we worked closely with Van den Herik to ensure the materials were best suited to the work.”
From granite and limestone to flint and gravel
The stone was delivered by inland vessels to three purpose-built storage areas along the Julianakanaal. From there, it is transported to its final destination. For the construction of the temporary dam at Berg aan de Maas alone, a total of 15,000 tonnes of 4-32mm flint and 10,000 tonnes of 5-40kg rock armour were delivered. Van den Herik laid bentonite mats on the canal bed and partly on the slope. These must be protected by a layer of 22-63mm rounded gravel, supplied from Germany and France. Where no bentonite mats have been laid, a layer of 45-125mm limestone is installed first. This limestone layer is then covered with a layer of rock armour weighing 5-40kg on the bed and 10-60kg on the slope.
Mutual trust
The relationship with Van den Herik is also built on mutual trust. “We have enjoyed working together for a very long time. I can rightly say that we are proud to contribute, both literally and figuratively, to the safety of Dutch waters with our water engineering stone.”
Een zakelijke vraag aan Roxx International BV? Get in touch
Who worked on Julianakanaal
- Trimble dealer
SITECHMentioned in Efficient excavation on the Julianakanaal thanks to Trimble machine control - setting outPS SurveyMentioned in Efficient excavation on the Julianakanaal thanks to Trimble machine control
- main contractorVan den Herik-SliedrechtMentioned in PS Survey deploys a range of surveying techniques on the Julianakanaal
- groundworksJac RijkMentioned in Julianakanaal: A mega-project involving 180 machines, 200 workers and nearly 1.5 million tonnes of earth
- earthworks partnerFL BVMentioned in Complexity of Julianakanaal calls for flexibility and quick decision-making
- earthmoving companiesErmersMentioned in Complexity of Julianakanaal calls for flexibility and quick decision-making
- earthmoving companiesBC van der VisMentioned in Complexity of Julianakanaal calls for flexibility and quick decision-making
- project control
Count & CooperMentioned in Project controls demonstrate their value on the Julianakanaal project - clientRijkswaterstaatMentioned in Project controls demonstrate their value on the Julianakanaal project
- water management
VanderkampMentioned in The challenge for Van der Kamp: how do you keep the Julianakanaal dry? - earthworksErmers GrondverzetMentioned in Working as one team in the northern section of the Julianakanaal
- earthworks
Van Schaik GrondverzetMentioned in Van Schaik deploys heavy equipment for earthworks on the Julianakanaal
Keep following this
Get an email when a new story is published. No account needed.
- ProjectJulianakanaal
- SubjectSpecials
- CompanyRoxx International BV