Marsé Montage and Wiko Staalbouw are continuing to grow from a new shared location in Alkmaar. Job Hester and Robèr Zoontjes talk about steel structures for infrastructure, flexibility on site, specialist welding, major infrastructure projects, and expanding the company’s expertise and capacity.

Guests: Job Hester and Robèr Zoontjes
Host: Roel van Gils

Robèr Zoontjes.
Job Hester.

Have a business enquiry for Marsé Montage? Get in touch

Full transcript

All chapters (23)
  1. Marsé Montage continues to develop
  2. Meet Robèr Zoontjes and Job Hester
  3. A new chapter for Marsé Montage
  4. More space at the new site
  5. Steel structures and anchorages
  6. Moving the machinery
  7. The takeover of Wiko Staalbouw
  8. The difference between Marsé Montage and Wiko Staalbouw
  9. More capacity and shorter lead times
  10. Flexibility for clients
  11. Work at the Brittenpassage
  12. On-site welding and working during closures
  13. Work on the A27
  14. Safety and certification
  15. Execution Class 3 and expanding technical expertise
  16. Bridge projects in Medemblik
  17. The machinery in the new workshop
  18. Steel, stainless steel and aluminium
  19. Major projects from the past
  20. Working nationwide
  21. Marsé Montage and Wiko Staalbouw as steelwork partners
  22. Growing with the team
  23. Vacancies and closing

Marsé Montage continues to develop

Roel van Gils Welcome to another episode of GWW-BOUWMAT, the podcast. Today we’re joined by a company that has undergone impressive development in recent years. It has moved to larger premises, taken over a fellow steelwork company, grown its team and taken on an increasingly prominent role in complex infrastructure projects. In short, it’s going from strength to strength. I’m talking, of course, about Marsé Montage. Job and Robèr are here with me. Gentlemen, welcome.

Job Hester Thank you.

Meet Robèr Zoontjes and Job Hester

Roel van Gils Tell us a little about yourselves.

Robèr Zoontjes I’ve been with Marsé Montage for 36 years.

Roel van Gils Wow.

Robèr Zoontjes So quite a while.

Roel van Gils So you’ve got plenty of experience. Always enjoyed it?

Robèr Zoontjes You don’t stay that long otherwise.

Roel van Gils Yes, I can see that. Great. Thank you.

Job Hester My name is Job Hester. I’ve owned Marsé Montage for six years, and Wiko Staalbouw for a year. I’m Robèr’s colleague, and I get to benefit every day from all the experience he’s gained.

Roel van Gils You work closely together.

Job Hester Yes, we work together quite a lot.

A new chapter for Marsé Montage

Roel van Gils Okay, great. Gentlemen, welcome once again. 2026 looks set to be a special year for Marsé Montage. Or perhaps it already is? Looking back over the past period, does it feel like the start of a new chapter for you, Job?

Job Hester Yes, definitely. It actually started last year. As I just mentioned, in 2025 we took over Wiko Staalbouw and brought it into Marsé Montage. So, together. They remain separate entities, but we work together a lot. The guys work across both companies, in production as well as installation. Everyone has their own strengths, and by drawing on those strengths we can serve our customers even better. On top of that, we moved to a single location. So we’ve gone from two separate sites to one.

Roel van Gils And I assume you’re only talking about Marsé Montage.

Job Hester Both Marsé Montage and Wiko Staalbouw. Marsé Montage was based in Castricum, on an industrial estate a bit off the beaten track, so access was quite difficult for large lorries. Customers could get there easily enough, but they had to drive right through Castricum.

Roel van Gils They must be pleased in Castricum now.

Job Hester We regularly had lorries 22 metres long, loaded with large pipes, just missing the lampposts. Most of the time, anyway. The hauliers are very glad we’ve moved too. They can now reverse in as normal and load and unload. It always worked out somehow. I think Castricum breathed a sigh of relief when we left in December.

Read the full transcriptCollapse transcript20 more chapters

More space at the new site

Roel van Gils You’ve also got more space at the new site?

Job Hester Yes, the workshop is about twice as big. We have around 1,100 square metres of workshop space, plus a large office where we can all sit together. We even have room to spare. We’ve also made a bit of provision for the future, so we can still grow.

Roel van Gils How are you finding it, Robèr?

Robèr Zoontjes The new site? It’s a little further to travel in the morning, but it’s fine. We all looked at the site together to see if everyone was happy to move there, of course. And yes, we’re very happy there now, and everything seems to be going better and more smoothly.

Steel structures and anchorages

Roel van Gils Yes, okay, great. Could you sum up in a few lines who you are and what you do? Job, Robèr, either of you can answer.

Robèr Zoontjes Temporary structures, but also a lot of anchoring work for companies that drill anchors. Anchor chairs, you name it. Pretty much anything in steel, cover plates, whatever you can think of. We can even make a balcony railing.

Moving the machinery

Roel van Gils Yes, yes. And all the machinery moved to the new site too. I imagine that was quite a job.

Job Hester Yes, it certainly was. The move took up most of December, and we’re still getting the new premises set up. So not everything is in its place yet, and we can’t find everything without looking. But it’s a phase you have to get through. It’s partly because we’ve been so busy, and still are. We haven’t had time to get everything properly organised.

Roel van Gils Did you work from two locations for a while, or not?

Robèr Zoontjes Not really.

Job Hester Well, Wiko and Marsé did operate from two locations. Wiko Staalbouw was based in Koedijk and Marsé, as I said earlier, in Castricum. The two separate operations have now come together. But we made sure the downtime for both companies was kept to a minimum. That was in early December, with Marsé moving a week before Wiko. Then we moved everything over, including the large machines, all at once. We wanted to do it as efficiently as possible.

The takeover of Wiko Staalbouw

Roel van Gils What was the thinking behind taking over Wiko Staalbouw?

Job Hester It can be worthwhile to look at companies that are no longer so well placed for the future, perhaps because of the owner’s circumstances at the time. For example, they may want to retire and already be winding down the business. Yet they have talented people working there, with plenty of potential, and a loyal customer base. That was the potential we saw in the company.

Roel van Gils Yes. Sorry, Robèr, did you want to add anything? What’s the difference between Wiko and Marsé?

The difference between Marsé Montage and Wiko Staalbouw

Job Hester Marsé is very much a steelwork partner for the infrastructure sector, for civil engineering projects, in other words. We work as steelwork partners for our regular contractors. They need steel, and we take care of it. We get it to site, install it and fabricate it in our workshop. Robèr’s 36 years of experience also bring a lot of valuable ideas, which are often a great help to customers. We come up with all sorts of solutions too. We’re very good at responding quickly, so we’re highly flexible. We can easily bring in extra people. If we need to work through the night to meet a production deadline that was set a week earlier, that’s no problem for us. I think that’s where we add value. Wiko Staalbouw is much the same, but serves different customers. It works much more on regional construction projects for contractors, in housing and industrial buildings. Smaller industrial buildings, not the big ones. Wiko specialises in bespoke stairs, landings and railings. They make some really neat little staircases, as well as larger ones. In stainless steel, steel and aluminium.

More capacity and shorter lead times

Roel van Gils Yes, and now that you’re at one location, you can also support each other with the work you do.

Job Hester Yes, definitely. Wiko, for example, also does quite a lot of smaller steelwork for contractors working on home extensions and things like that. We can turn that around quickly, which should mean shorter lead times. I don’t think customers have quite noticed that yet, because the move put us about five weeks behind. But we are now producing some things very quickly, and that will ultimately translate into very fast lead times. We’ll become even more flexible.

Flexibility for clients

Roel van Gils Yes, okay. And when you talk to clients, do you often hear that...

Job Hester They point to the flexibility we offer, and how easily we can bring in extra people because we now have quite a large core team. We also have a lot of contact with self-employed contractors and other people who work with us regularly. We know the quality of their work, so we can bring them in when needed. We’ve always been very flexible, and that’s one of the reasons customers chose us.

Roel van Gils Yes, yes, yes. But all sorts of things happen in construction, of course. The schedule shifts, a design changes, you name it. You can respond quickly to that.

Robèr Zoontjes We delivered it yesterday, more or less.

Roel van Gils Oh, good. Okay. So they call at the last minute too.

Robèr Zoontjes Yes. Oh, we need four more welders tomorrow.

Roel van Gils But that can be quite challenging, can’t it?

Robèr Zoontjes It can. But we always do our best to make it happen.

Roel van Gils Yes, yes. And is that one reason clients come back? Keep coming back, in fact?

Job Hester I think so, yes. That, and the quality of the people we provide.

Work at the Brittenpassage

Roel van Gils Yes, okay. Bespoke work plays a big part, of course. Can you give us a few examples of projects you’re working on?

Robèr Zoontjes Projects we’re working on now. Among other things, we’re working at the Britten- and Minervapassage for Mobilis, on the Zuidas, as part of Zuidasdok.

Roel van Gils And you’re supplying various steel structures for that.

Robèr Zoontjes Yes, all sorts of things, from welding covers into piles to designing structures and supports for all kinds of concrete elements.

Job Hester We do a range of things there. We supply the anchorage structures so the companies carrying out the anchoring work can do their jobs.

Roel van Gils But you make all of that at your premises?

Job Hester Yes, we make it all at our premises. We also supply a number of support structures. The covers Robèr just mentioned are supplied to a very high quality standard, with full-penetration welds. We work to execution class 3, ROK 1.4 in this case.

Roel van Gils Rijkswaterstaat?

Job Hester That’s right. And we also carry out 100% UT inspection on 380 covers. We’re especially proud when we deliver them without any defects.

On-site welding and working during closures

Roel van Gils Yes, and do you also weld outdoors?

Robèr Zoontjes Definitely. Mostly outdoors.

Roel van Gils Mostly outdoors, sorry. You mean on site. Okay. And that work often takes place during closures, of course.

Robèr Zoontjes And at night and at weekends too.

Roel van Gils Yes, it doesn’t matter when. That must take quite a lot out of your people.

Robèr Zoontjes Definitely.

Roel van Gils But the spirit is there.

Job Hester Yes, and the good thing is that the guys… Look, if you ask someone whether they want to work at the weekend, most will say no. It’s the same with us, initially. But they also understand that working at the weekend means we have work for the rest of the week too. So it’s not that they’re all thrilled about it, but they’re definitely willing to do it.

Work on the A27

Roel van Gils I understand you’re also working on the A27.

Robèr Zoontjes Yes.

Roel van Gils ALSÉÉN. Can you tell us a bit about that? What’s the most interesting part of the work?

Robèr Zoontjes As it happens, we’ve just built the support structure for the cycle bridge at Groeneweg. The temporary cycle bridge is being put back in place this week. That’s one thing we’re working on now.

Roel van Gils What sort of structure are we talking about? How big is it? How many tonnes?

Robèr Zoontjes It’s not particularly heavy in terms of tonnage, but it involves wind bracing or beams, HEB 300 sections. It’s not exceptionally heavy. The main challenge is the structure itself, which has to be welded on site between bored piles. And, again, under time pressure.

Job Hester So the cycle bridge had to be installed in a particular week, during a closure taking place this weekend. The structure had to be finished before then. So it was up to us to make sure it was… And we did.

Roel van Gils Yes, absolutely.

Safety and certification

Roel van Gils Yes, yes. And what about safety?

Job Hester Yes, 100 per cent. We’re VCA-certified, of course, as are all our men and women. We take safety very seriously. We also have SCL certification, the Safety Culture Ladder.

Roel van Gils Oh, right.

Job Hester We’re certified at Step 3. I think we moved up from Step 2 to Step 3 last year.

Roel van Gils Did you do the [unclear] course?

Robèr Zoontjes No, it was fun, but we learned a few things too.

Job Hester We did it in-house. That’s another benefit of having such a large building: we have the space to set things like that up. We had people come in, with mannequins and actors covered in all sorts of wounds. So yes, it was a fun day for the staff.

Execution Class 3 and expanding technical expertise

Roel van Gils And, as you mentioned, execution up to Execution Class 3.

Job Hester Yes, we comply with EN 1090-2, Execution Class 3. And there are often additional requirements, for example from Rijkswaterstaat, such as ROK 1.4 or 2.0, which we’ve just discussed. We have extensive knowledge of these requirements, so we can deliver everything in-house.

Roel van Gils And there was also a vacancy for an IWT, wasn’t there? Or have you filled it now?

Job Hester A new colleague is starting with us next week. They’re an IWT too, and someone who really specialises in the work. That will help us expand our expertise even further. We’ve also taken on quite a few younger people recently, who have less experience and still have a lot to learn. This new member of staff will help with that. So it’s another boost to the knowledge of both the company and the team.

Roel van Gils What does that mean for clients?

Job Hester In areas such as engineering, for example. We’ll be able to contribute even more to finding solutions. And I think it should also shorten lead times a little, thanks to greater capacity in areas such as drafting.

Roel van Gils Yes, and making sure all the documentation is in order, of course.

Job Hester Yes, we already have that very well under control. That includes the fabrication manuals and everything else required under Execution Class 3.

Roel van Gils Oh, right, that’s all part of it, of course.

Job Hester Yes, it’s all part of it. Everything is properly documented and under control.

Bridge projects in Medemblik

Roel van Gils I understand you’re also involved in bridge projects in Medemblik. Is that right?

Job Hester That’s right. Two new bridges are being built. One has already been built in Medemblik, and they’re now specifically building the other one. We joined the project with K_Dekker to make the support structure. We came on board quite early, and they asked us to think along with them and come up with a solution. So they essentially left it in our hands. We had quite a few discussions with them and came up with a good solution together. It’s very simple, but highly cost-effective.

Roel van Gils What sort of products are we talking about?

Job Hester It was originally going to be a pile head, something welded onto a pile with various stiffeners and very thick plates. Instead, we came up with a fairly thin plate that we could position to the nearest millimetre, with the help of the survey team. The main advantage was that it would take less time. The bridges had to be completed under time pressure again, especially the first section.

Roel van Gils Time pressure is a recurring issue, isn’t it?

Job Hester Yes, it always is. You might think: why not start a bit earlier? But often it’s not down to us. Still, it works well for us, and I think the client knows that too. The funny thing is that we had to finish the first bridge so quickly so that the bats could fly underneath it again.

Roel van Gils Oh, because of flora and fauna.

Job Hester Yes, exactly.

Roel van Gils Yes, that’s becoming an increasingly important factor in infrastructure projects too. Right, okay.

The machinery in the new workshop

Roel van Gils Well, I think we’ve covered enough projects. So all of this is made at your new workshop. Tell us about it. What machinery do you have there? What can you do?

Job Hester At the moment, we even have some duplicate machinery. We brought two companies together, of course, and brought all the machines with us. Well, all the machines we had room for.

Roel van Gils And there was room for them.

Job Hester Yes, there was. We brought along all the machines that were still certified, or still needed certification but could be certified. We got rid of all the machines that no longer met current safety standards. We can cut materials, including plasma cutting on a 6 by 2 metre plasma table, up to 40 mm thick. That comes up quite often in the Marsé side of the business, when we need to cut something quickly because it has to be fitted over the weekend so that a road can be reopened or closed again quickly. At Wiko Staalbouw, we mainly cut railings in special shapes and things like that. One interesting project for another client involves chimneys on holiday homes. We have to make 42 of them in steel… No, in aluminium. We make them entirely ourselves.

Roel van Gils Okay. And the actual chimney itself?

Job Hester It’s an aesthetic chimney, so there’s no smoke or fire coming out of it. It’s purely decorative, and we make it from aluminium. We cut it ourselves, bend it a little and weld it up. Then it goes to the coating company for a nice finish.

Steel, stainless steel and aluminium

Roel van Gils Yes, yes. So metals in the broadest sense of the word: steel, aluminium and stainless steel.

Job Hester Yes, exactly. All… Well, those three types, anyway. Not the more specialised ones, but those three.

Roel van Gils Yes, yes. And I understand you also have both CNC and conventional press brakes.

Job Hester A heavy press brake. Not extremely heavy, but it can bend material up to 12 mm thick over a length of three metres. It’s used for all the sheet pile cappings and other structures. We also have a CNC-controlled press brake for finer work, for example the chimneys or planters made from weathering steel, and so on.

Major projects from the past

Roel van Gils Yes. We’ve mentioned a number of projects, all fairly recent. In the past, you’ve…

Job Hester Marsé Montage has worked on about half of the Netherlands. Robèr was involved in those projects, though, so perhaps it would be best if he told you about them.

Robèr Zoontjes Yes, I can tell you a bit about that. We worked on the tunnel at Zevenaar for the Betuweroute. That was 1,500 tonnes.

Roel van Gils What structures did you build for that?

Robèr Zoontjes We built support frames along the whole tunnel. After that, we moved on to the HSL. We built two [unclear] for the HSL tunnels. That was 9,000 tonnes, which was then removed again. It was a temporary structure.

Roel van Gils And what happened to it?

Robèr Zoontjes It goes back to the supplier the pipes came from. The beams, I mean.

Roel van Gils So it can be used again.

Robèr Zoontjes You often see it again. I’ve seen that beam before. And you’ve used everything. Then we moved on to Amsterdam Centraal Station, for the Noord/Zuidlijn. We supported the main station building. At one point, something like 1,600 tonnes was moved underneath Centraal, using forklifts and all sorts. Right in the city centre, though. Yes, we had a great time. Ten years working together. It was a great project for all the fitters too. And yes, we also worked on the Rijksmuseum, building the two basements there. We also worked on a car park in Utrecht, the Vredenburg car park. It was built top-down. The construction started at the top, while we worked downwards, five floors at a time. So we’ve done some very varied projects over the years. And there are too many smaller car parks to mention. I can start work in the morning and have no idea where I’ll end up by the afternoon. So it’s a very broad field.

Working nationwide

Roel van Gils And you work nationwide?

Job Hester Yes, definitely. We work nationwide. We’re based in Alkmaar, so Amsterdam and Utrecht are our preferred areas, absolutely. We do a lot in Rotterdam too, so that’s more or less our region. We’re working on the A27 now, which is a bit further away, but still an easy drive for us. Beyond that, we discuss it with the client. Recently, we supplied a lot of steelwork in Vught for the sunken section there. We did the fabrication, for example, but not the installation. In this case, installation is more the piling contractor’s job. I think we supplied 73 beams, 22 metres long, HEB 500, HEA 500 and HEA 450. That was another very interesting project. We actually got that work through our renovation of the locks at Muiden, where we also did a lot of work.

Marsé Montage and Wiko Staalbouw as steelwork partners

Roel van Gils If you deliver quality and do a good job, word of mouth is the best advertising, of course.

Job Hester Yes, exactly.

Roel van Gils Okay. So, in a nutshell, what can people call you for? Marsé Montage and Wiko Staalbouw too, of course.

Job Hester Well, they’re essentially two different businesses. Marsé Montage is the steelwork partner for larger projects. That’s how we want to position ourselves. We can do pretty much anything: welding on site, supplying structures, building structures on site, and also fabricating complete structures in our workshop, or supplying and installing them. So we can cover pretty much anything involving steel. Wiko Staalbouw specialises in stairs, platforms, railings, spiral staircases and all kinds of bespoke structures. We also do smaller structural steelwork for contractors. We have our own truck with a crane that we can use to install things.

Roel van Gils Self-sufficient.

Job Hester Self-sufficient, definitely. Yes. And with the experienced people we have on the team, the customer doesn’t need to worry about us once we’re on the job.

Growing with the team

Roel van Gils Okay, great. I think that gives us a complete picture. Looking ahead to the coming years, where do you see Marsé Montage and Wiko Staalbouw together?

Job Hester Well, I hope we can keep this going, and that our team of men and women continues to grow steadily. We’ll keep doing our best to make sure all our customers are happy. And I hope we can and are able to maintain this growth. Yes, that’s really the goal.

Vacancies and closing

Roel van Gils Are there any vacancies, perhaps, for listeners who might be interested?

Job Hester Yes, we’re looking for someone new… No, just kidding. Yes, we always have vacancies. There’s always room for good people. We’re fully staffed in all positions, though. But we can always make room for good bench fitters, welders, structural steel workers and fitters.

Roel van Gils Okay, great. Thanks for sharing your insights and telling us your story. And thank you for listening.

Job Hester Yes, thank you.

Robèr Zoontjes You’re welcome.

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeMaterials and techniques for infrastructure
  • SubjectSpecials
  • CompanyMarsé Montage
  • CompanyMobilis
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.