Slightly less heavy-duty, but at least as remarkable, are the fire-resistant wall elements at the Maasdeltatunnel.
Slightly less heavy-duty, but at least as remarkable, are the fire-resistant wall elements at the Maasdeltatunnel.

The Blankenburg Connection is a wide-ranging project for Van Dijk Beton. The specialist in made-to-order precast concrete structures is producing and supplying, among other things, many hundreds of modular noise barriers, a large number of foundations for traffic-support structures and a series of fire-resistant wall elements. And completely unique: special concrete fitting wedges for the immersed tunnel, which must be installed just two days after being measured.

Van Dijk Beton has been producing modular concrete noise barriers to a design by Rijkswaterstaat for many years. “Construction consortium BAAK approached us to supply a large series of noise barriers in a slightly modified form,” says Marc Pijpers, Managing Director of Van Dijk Beton. “The idea was to build on the existing barrier. In this case, around 700 elements were cast with a fine fluted pattern on just one side, rather than both. This type of order suits us very well because we can organise our work efficiently. We also have our own formwork shop, and make and maintain all our moulds in-house. The elements were supplied via Holland Scherm.”

Van Dijk Beton has been producing modular concrete noise barriers to a design by Rijkswaterstaat for many years.

VDC foundation blocks and fire-resistant elements

Unlike the noise barriers, Van Dijk beton is also supplying a large number of concrete structures for the Blankenburg Connection that will soon be hidden from view. “For the project, we are supplying our VDC foundation blocks, also known as foundations for traffic-support structures,” Pijpers continues. “These are the ‘blocks’ on which the gantries for the matrix signs are founded. We supply these VDC foundation blocks nationwide, and have also made a substantial delivery for the Blankenburg Connection. Each element weighs around 25-30 tonnes and was delivered by abnormal-load transport.” Somewhat lighter, but just as unusual, are the fire-resistant wall elements at the Maasdeltatunnel. “These elements will also be hidden from view, but they do have a clear purpose,” says Paul de Vries, Sustainability and Business Development Manager at Van Dijk Beton. “The elements fill the space between the columns (piers) that support the roof and were produced using a special mix design. The specific mix creates slightly more air bubbles, allowing the concrete to expand at higher temperatures. In this case, we did not need to use polypropylene fibres, because the walls will subsequently be fitted with fire-resistant cladding.”

The fire-resistant elements fill the space between the columns (piers) that support the roof and were produced using a special mix design.

Fitting wedges

Immersing both elements for the future Maasdeltatunnel is a milestone in the project. Van Dijk Beton also has an important role to play. “We are producing the wedge structure used to close the closure joint. It acts as a spacer between the abutment and the immersed tunnel element, preventing the element from moving,” explains Maarten Klein Gebbink, Head of the Works Office at Van Dijk Beton. “There are two sets of two wedges. The dimensions of the first set are known, but the fitting wedges can only be measured after the final element has been immersed. We receive the measurements on Monday morning, then adapt the mould and reinforcement cages accordingly before casting the element, so that it can be put into use just two days later, at considerable depth underwater. Naturally, this also places specific demands on the mix.”

Our contribution to the Blankenburg Connection gives a good picture of Van Dijk Beton’s versatility, Pijpers concludes. “On the one hand, we are highly capable of producing concrete products in large batches, but we are equally at our best when there are specific requirements for dimensions, mix composition and punctual delivery. And it gets even better when sustainability can be part of the picture too. We are leading the way in that area as well.”   

A business enquiry for Van Dijk Beton BV? Get in touch

Who worked on Blankenburgverbinding

  1. construction consortiumBAAKMentioned in Unique and remarkable: 800-metre-long floating reed bed in the Krabbeplas near Vlaardingen
  2. crane matsKo-MatsMentioned in German engineering in dragline mats for the Blankenburg Connection project
  3. road construction companyBallastMentioned in Proud partner brings its (in-house) strengths together
  4. foundation specialistDe Vries TitanMentioned in Strong partnership delivers huge piling operation
  5. temporary support structureCiviele technieken deBoerMentioned in Jacking, sliding and pressing
  6. precast beamsHaitsma BetonMentioned in Precast concrete for the new A24
  7. prestressing systemsDYWIDAG-Systems InternationalMentioned in Smart thinking in prestressing design
  8. designTunnel Engineering Consultants (TEC)Mentioned in Environmental and community interests at the heart of a unique technical concept
  9. ondersteunings- en horizontale bekistingsconstructiesMADEMA Steigerwerken BVMentioned in Temporary support structures for in-situ decks
  10. temporary supportCT deBoerMentioned in Temporary support structures for in-situ decks
  11. supplier of the scaffolding systemMatemco Hulpconstructies BVMentioned in Temporary support structures for in-situ decks
  12. Steel-reinforced elastomeric bearingsKonstrukomMentioned in Reinforced elastomeric bearings
  13. dewatering worksHenk van Tongeren Water & TechniekMentioned in Dewatering operation
  14. civil underwater structuresDISA InternationalMentioned in A hive of activity underwater
  15. geïntegreerde video-, audio- en communicatiesystemenHacousto ProtecMentioned in The link to the traffic control centre
  16. supplierJdB groepMentioned in Reusing and upgrading soil products
  17. consultancy firmStrypesMentioned in Making a difference
  18. sealing specialistViltonMentioned in Sealing expert prevents ‘water ingress’
  19. industrial automation specialistICT GroupMentioned in Control software for tunnel systems
  20. Breaking down foundation pile headsBlijleven KoppensnellersMentioned in Dust-free pile cropping on the Blankenburg Connection
  21. excavationVerboon MaaslandMentioned in Preparing complex construction pits for construction
  22. waterproofingPolyproofMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  23. waterproofing injectionsSpecial Industrial Repair (SIR)Mentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  24. supplier of waterproof coatingsAdcosMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  25. wall formworkPERIMentioned in Save time and money with an advanced formwork system
  26. temporary bridgesRetro BridgeMentioned in Six temporary bridges improve access to construction site
  27. edge elementsTakke BreukelenMentioned in Architectural edge elements in composite and stainless steel
  28. precast concrete structuresVan Dijk BetonIn this story
  29. designRijkswaterstaatIn this story
  30. pylon claddingGlasGroenMentioned in A touch of nostalgia on the Blankenburgverbinding

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBlankenburgverbinding
  • ThemeMaterials and techniques for infrastructure
  • SubjectBridge construction
  • CompanyVan Dijk Beton BV
  • CompanyRijkswaterstaat
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.