A succession of engineering structures

Alongside the Van Brienenoordbrug and the Beneluxtunnel, the region is getting a third link between north and south: the A24 Blankenburgverbinding.
Alongside the Van Brienenoordbrug and the Beneluxtunnel, the Rotterdam region is getting a third crucial link between north and south: the A24 Blankenburgverbinding. The new A24 will be a four-kilometre route comprising a succession of engineering structures. We spoke to both construction directors at the BAAK construction consortium about this impressive new link. BAAK is a consortium of Ballast Nedam, DEME Group and Macquarie.
A bird’s-eye view of the new A24 from north to south: “The new route begins with a sunken interchange at the A20, followed by a sunken section and then a land tunnel (Hollandtunnel), preserving the surrounding open, green landscape,” says Bart Meijer, construction director at BAAK. “Next, we cross a road and a railway line using two viaducts, then the flood defence, followed by the technical highlight: the 945-metre-long Maasdeltatunnel, which connects to an above-ground interchange with the A15. In short, it is a truly special project and an exceptionally fascinating one for us as infrastructure contractors.”

Two contrasting faces
The Blankenburgverbinding will improve traffic flow, ease pressure on existing infrastructure and thereby make the transport network more reliable. This new link will improve access to the Rotterdam region, helping to support the growth of the Port of Rotterdam and Greenport Westland. “Given the scale and complexity of the project, BAAK has divided the route into two sections from a construction perspective,” Meijer explains. “We consider the Maasdeltatunnel a project in its own right, while the construction of all the other structures and connections, including the widening of the A20 and A15, makes up the second ‘sub-project’. What makes the link unique is that it effectively has two faces: around the A20, the new route is mostly sunken and blends into the landscape. On the industrial side, to the south, the picture is entirely different, with large flyovers and structures above ground level.”
Smart solutions
Rijkswaterstaat has delivered the Blankenburgverbinding project under a DBFM contract. BAAK is therefore responsible not only for the design and construction, but also for maintenance over a period of 20 years. “Rijkswaterstaat challenged the market to come up with a smart design that would cause as little disruption to the surrounding area as possible,” says Robbert de Groot, construction director at BAAK. “We have done a good job of meeting that challenge. For example, we built a temporary logistics route, constructed the underpass beneath the Hoekse Lijn right at the start of the project, and are transporting most of the raw materials by water to a newly built quay wall. By dividing the Maasdeltatunnel into just two sections instead of the six in Rijkswaterstaat’s original design, we are delivering major benefits for the Port of Rotterdam. This will substantially reduce disruption to shipping. Another unusual and challenging aspect is that we are building both elements of the immersed tunnel on our own site. On both sides of the river, we are building a dry dock floor above the tunnel entrance. The 200-metre-long immersed tunnel elements will be constructed on these floors.”

The Blankenburgverbinding is certainly a project with plenty of variety, De Groot concludes. “It brings together virtually every discipline you encounter in our fascinating field. That makes it an exceptionally exciting and challenging project, truly one of a kind.” The A24 Blankenburgverbinding is scheduled to open to traffic in 2024.
Een zakelijke vraag aan Ballast Nedam Road Specialties? Get in touch
Who worked on Blankenburgverbinding
- construction consortiumBAAKMentioned in Unique and remarkable: 800-metre-long floating reed bed in the Krabbeplas near Vlaardingen
- crane matsKo-MatsMentioned in German engineering in dragline mats for the Blankenburg Connection project
- designTunnel Engineering Consultants (TEC)Mentioned in Environmental and community interests at the heart of a unique technical concept
- ondersteunings- en horizontale bekistingsconstructiesMADEMA Steigerwerken BVMentioned in Temporary support structures for in-situ decks
- supplier of the scaffolding systemMatemco Hulpconstructies BVMentioned in Temporary support structures for in-situ decks
- geïntegreerde video-, audio- en communicatiesystemenHacousto ProtecMentioned in The link to the traffic control centre
- Breaking down foundation pile headsBlijleven KoppensnellersMentioned in Dust-free pile cropping on the Blankenburg Connection
- waterproofingPolyproofMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- waterproofing injectionsSpecial Industrial Repair (SIR)Mentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- supplier of waterproof coatingsAdcosMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- edge elementsTakke BreukelenMentioned in Architectural edge elements in composite and stainless steel
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBlankenburgverbinding
- SubjectBridge construction
- CompanyBallast Nedam Road Specialties