Bridge construction

Preparing complex construction pits for construction

Natte ontgraving van de bouwkuipen van de Maasdeltatunnel met behulp van draadkranen met specialistische machinisten en DGPS.
Natte ontgraving van de bouwkuipen van de Maasdeltatunnel met behulp van draadkranen met specialistische machinisten en DGPS.

A large part of the Blankenburgverbinding is being built below ground level. Contractor consortium BAAK has made grateful use of Verboon Maasland’s expertise to excavate the complex construction pits using GPS, to depths of as much as 29 metres (!) below NAP. Unprecedented in the Netherlands. 

“We are a well-known name in the market, with extensive experience in excavating water-filled construction pits,” says managing director Ruud van Wijk. Thanks to this expertise, Verboon Maasland is often called in for more complex jobs. “For example, we worked on the Rijnlandroute, excavating the car park at Lammermarkt in Leiden, and we are currently working on the Rotterdam A16 project. The latter is somewhat comparable to the Blankenburgverbinding in terms of the size of the construction pits, but its depth pales in comparison with what is required here.”

Placing gravel on the bottom of the excavation for the gravel bed for the OWB (underwater concrete).

Several scenarios developed

Drawing on its extensive knowledge and experience of excavating construction pits under water, Verboon Maasland initially developed several scenarios. “We presented these to BAAK so that they could make an informed choice that best fitted in with all the other works,” Van Wijk explains. “The access roads to and from the Maasdeltatunnel were particularly unique, which brought its own challenges. We had to excavate the construction pits in stages, allowing the civil engineering team to install the large bracing frames in between. The next stage was to carry out the second excavation level with great care and GPS guidance, manoeuvring between the huge bracing frames to avoid damage. As we approached the required depth, we encountered the hundreds of anchor piles, which we had to excavate around. The final layers between these anchors were therefore largely removed using DOP pumps, so that we could level the bottom of the pit and prepare it for placing a gravel layer, followed by pouring the underwater concrete.” 

Letterbox pit

According to Van Wijk, Verboon Maasland’s greatest strengths are its specialist equipment, all GPS-guided, and its skilled staff. “We also have a highly creative and resourceful technical department. In collaboration with BAAK, we developed special pieces of equipment for the letterbox pit, where the access road will eventually connect to the immersed tunnel. One example is an extension for the wire-rope crane grab, allowing us to work between the many support points and braces. We also developed a special ‘placing and suction pipe’ for laying gravel on the bottom of the pit. Placing gravel within the tolerances at a depth of 8 to 10 metres is already quite a challenge, let alone at almost 30 metres. The ‘placing and suction pipe’ enabled us to place the gravel in a highly controlled way, achieving the correct layer thickness and finished level. Using this specialised equipment enabled us to work carefully and with precision.”

Verboon Maasland has now completed most of its work on the Blankenburgverbinding. “Until the summer holidays, we will carry out the final excavations in the connecting construction pits and the associated earthworks. All in all, we will then have been working on the project for more than 2.5 years. It has been an extremely constructive project, thanks also to the excellent, solutions-focused collaboration with the BAAK team,” Van Wijk concludes.    

Question about this story? Ask your question

Who worked on Blankenburgverbinding

  1. construction consortiumBAAKMentioned in Unique and remarkable: 800-metre-long floating reed bed in the Krabbeplas near Vlaardingen
  2. crane matsKo-MatsMentioned in German engineering in dragline mats for the Blankenburg Connection project
  3. road construction companyBallastMentioned in Proud partner brings its (in-house) strengths together
  4. foundation specialistDe Vries TitanMentioned in Strong partnership delivers huge piling operation
  5. tijdelijke ondersteuningsconstructieCiviele technieken deBoerMentioned in Jacking, sliding and pressing
  6. precast beamsHaitsma BetonMentioned in Precast concrete for the new A24
  7. prestressing systemsDYWIDAG-Systems InternationalMentioned in Smart thinking in prestressing design
  8. designTunnel Engineering Consultants (TEC)Mentioned in Environmental and community interests at the heart of a unique technical concept
  9. ondersteunings- en horizontale bekistingsconstructiesMADEMA Steigerwerken BVMentioned in Temporary support structures for in-situ decks
  10. temporary supportCT deBoerMentioned in Temporary support structures for in-situ decks
  11. leverancier van het steigersysteemMatemco Hulpconstructies BVMentioned in Temporary support structures for in-situ decks
  12. staalgewapende elastomeer opleggingenKonstrukomMentioned in Reinforced elastomeric bearings
  13. dewatering worksHenk van Tongeren Water & TechniekMentioned in Dewatering operation
  14. civil underwater structuresDISA InternationalMentioned in A hive of activity underwater
  15. geïntegreerde video-, audio- en communicatiesystemenHacousto ProtecMentioned in The link to the traffic control centre
  16. supplierJdB groepMentioned in Reusing and upgrading soil products
  17. consultancy firmStrypesMentioned in Making a difference
  18. sealing specialistViltonMentioned in Sealing expert prevents ‘water ingress’
  19. industrial automation specialistICT GroupMentioned in Control software for tunnel systems
  20. Breaking down foundation pile headsBlijleven KoppensnellersMentioned in Dust-free pile cropping on the Blankenburg Connection
  21. excavationVerboon MaaslandIn this story
  22. waterproofingPolyproofMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  23. waterproofing injectionsSpecial Industrial Repair (SIR)Mentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  24. leverancier van waterdichte coatingsAdcosMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  25. wall formworkPERIMentioned in Save time and money with an advanced formwork system
  26. temporary bridgesRetro BridgeMentioned in Six temporary bridges improve access to construction site
  27. edge elementsTakke BreukelenMentioned in Architectural edge elements in composite and stainless steel
  28. precast concrete structuresVan Dijk BetonMentioned in Versatile in precast concrete structures
  29. designRijkswaterstaatMentioned in Versatile in precast concrete structures
  30. pylon claddingGlasGroenMentioned in A touch of nostalgia on the Blankenburgverbinding

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBlankenburgverbinding
  • ThemeUnderground construction
  • SubjectBridge construction
  • CompanyVerboon Maasland
Share this article

Advertisement

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.