Preparing complex construction pits for construction

A large part of the Blankenburgverbinding is being built below ground level. Contractor consortium BAAK has made grateful use of Verboon Maasland’s expertise to excavate the complex construction pits using GPS, to depths of as much as 29 metres (!) below NAP. Unprecedented in the Netherlands.
“We are a well-known name in the market, with extensive experience in excavating water-filled construction pits,” says managing director Ruud van Wijk. Thanks to this expertise, Verboon Maasland is often called in for more complex jobs. “For example, we worked on the Rijnlandroute, excavating the car park at Lammermarkt in Leiden, and we are currently working on the Rotterdam A16 project. The latter is somewhat comparable to the Blankenburgverbinding in terms of the size of the construction pits, but its depth pales in comparison with what is required here.”

Several scenarios developed
Drawing on its extensive knowledge and experience of excavating construction pits under water, Verboon Maasland initially developed several scenarios. “We presented these to BAAK so that they could make an informed choice that best fitted in with all the other works,” Van Wijk explains. “The access roads to and from the Maasdeltatunnel were particularly unique, which brought its own challenges. We had to excavate the construction pits in stages, allowing the civil engineering team to install the large bracing frames in between. The next stage was to carry out the second excavation level with great care and GPS guidance, manoeuvring between the huge bracing frames to avoid damage. As we approached the required depth, we encountered the hundreds of anchor piles, which we had to excavate around. The final layers between these anchors were therefore largely removed using DOP pumps, so that we could level the bottom of the pit and prepare it for placing a gravel layer, followed by pouring the underwater concrete.”

Letterbox pit
According to Van Wijk, Verboon Maasland’s greatest strengths are its specialist equipment, all GPS-guided, and its skilled staff. “We also have a highly creative and resourceful technical department. In collaboration with BAAK, we developed special pieces of equipment for the letterbox pit, where the access road will eventually connect to the immersed tunnel. One example is an extension for the wire-rope crane grab, allowing us to work between the many support points and braces. We also developed a special ‘placing and suction pipe’ for laying gravel on the bottom of the pit. Placing gravel within the tolerances at a depth of 8 to 10 metres is already quite a challenge, let alone at almost 30 metres. The ‘placing and suction pipe’ enabled us to place the gravel in a highly controlled way, achieving the correct layer thickness and finished level. Using this specialised equipment enabled us to work carefully and with precision.”
Verboon Maasland has now completed most of its work on the Blankenburgverbinding. “Until the summer holidays, we will carry out the final excavations in the connecting construction pits and the associated earthworks. All in all, we will then have been working on the project for more than 2.5 years. It has been an extremely constructive project, thanks also to the excellent, solutions-focused collaboration with the BAAK team,” Van Wijk concludes.
Question about this story? Ask your question
Who worked on Blankenburgverbinding
- construction consortiumBAAKMentioned in Unique and remarkable: 800-metre-long floating reed bed in the Krabbeplas near Vlaardingen
- crane matsKo-MatsMentioned in German engineering in dragline mats for the Blankenburg Connection project
- tijdelijke ondersteuningsconstructieCiviele technieken deBoerMentioned in Jacking, sliding and pressing
- designTunnel Engineering Consultants (TEC)Mentioned in Environmental and community interests at the heart of a unique technical concept
- ondersteunings- en horizontale bekistingsconstructiesMADEMA Steigerwerken BVMentioned in Temporary support structures for in-situ decks
- leverancier van het steigersysteemMatemco Hulpconstructies BVMentioned in Temporary support structures for in-situ decks
- geïntegreerde video-, audio- en communicatiesystemenHacousto ProtecMentioned in The link to the traffic control centre
- Breaking down foundation pile headsBlijleven KoppensnellersMentioned in Dust-free pile cropping on the Blankenburg Connection
- excavationVerboon MaaslandIn this story
- waterproofingPolyproofMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- waterproofing injectionsSpecial Industrial Repair (SIR)Mentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- leverancier van waterdichte coatingsAdcosMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- edge elementsTakke BreukelenMentioned in Architectural edge elements in composite and stainless steel
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBlankenburgverbinding
- ThemeUnderground construction
- SubjectBridge construction
- CompanyVerboon Maasland