Bridge construction

Environmental and community interests at the heart of a unique technical concept

De kade langs het bouwdok wordt intensief gebruikt voor de aanvoer van materialen per schip in plaats van via het onderliggende wegennetwerk.
De kade langs het bouwdok wordt intensief gebruikt voor de aanvoer van materialen per schip in plaats van via het onderliggende wegennetwerk.

The design of the Blankenburg Connection is a joint effort by BAAK and Tunnel Engineering Consultants (TEC), a global leader in the design of immersed tunnel structures. The aim is to build the new link between the A20 and the A15 with the least possible impact on the surrounding area and the environment. This has led to a unique technical, economic and climate-resilient tunnel concept that also comfortably meets the requirements of the new Water Act. 

The Blankenburg Connection is a unique project in several respects. From the very first design sketches, BAAK has focused on the interests and objectives of Rijkswaterstaat, the cities of Rotterdam and Vlaardingen, and the Port of Rotterdam. “The technical design for this project is entirely geared towards serving these interests and objectives,” says Maiko Izendooren, Design Director at BAAK and Design Manager on behalf of Tunnel Engineering Consultants (TEC), a permanent joint venture between leading international engineering consultancies Royal HaskoningDHV and Witteveen + Bos. “The technical design is packed with innovative solutions to limit material use, minimise disruption to the Port of Rotterdam and reduce the impact on the surrounding area as much as possible. The design also takes account of all construction-related aspects, thanks to multidisciplinary design teams that include both designers and construction specialists.”

The immersed tunnel sections will be built using traditional methods in a construction dock on top of the roof of the new approach roads.

Innovative solutions

One of the innovative solutions in the technical design is to reduce the number of immersed tunnel sections for the Maasdeltatunnel beneath the Scheur. “Rijkswaterstaat’s original plan called for six sections. We reduced this to just two,” explains Izendooren. “This means that the Port of Rotterdam will only have to be closed twice. The original design would have required the entire riverbank to be excavated. Instead, we are leaving the bank intact and building the immersed tunnel sections using traditional methods in a construction dock on top of the roof of the new approach roads. This also allows us to use the quay alongside the construction dock to bring in materials by ship, rather than using the underlying road network. Another measure to ease the burden on the local road network is the construction of a dedicated construction link along the entire route. To achieve this, a railway viaduct was designed, built and slid into place in just nine months, crossing beneath the Hoekse Lijn. Once complete, this structure will also serve as the underpass for the new motorway.”

“The Hollandtunnel design is fully integrated into its surroundings,” Izendooren continues. “By building the tunnel below ground level, it will barely be visible in the landscape, which is characterised by abundant greenery and small historic towns. Even the building housing the technical installations has been designed in keeping with the surroundings and will resemble a farm shed. The tunnel itself will be built using reinforced underwater concrete, a specialist construction technique that ultimately reduces material use. In this way, we have addressed the interests of the surrounding area and the environment in every possible way.”

Question about this story? Ask your question

Who worked on Blankenburgverbinding

  1. construction consortiumBAAKMentioned in Unique and remarkable: 800-metre-long floating reed bed in the Krabbeplas near Vlaardingen
  2. crane matsKo-MatsMentioned in German engineering in dragline mats for the Blankenburg Connection project
  3. road construction companyBallastMentioned in Proud partner brings its (in-house) strengths together
  4. foundation specialistDe Vries TitanMentioned in Strong partnership delivers huge piling operation
  5. temporary support structureCiviele technieken deBoerMentioned in Jacking, sliding and pressing
  6. precast beamsHaitsma BetonMentioned in Precast concrete for the new A24
  7. prestressing systemsDYWIDAG-Systems InternationalMentioned in Smart thinking in prestressing design
  8. designTunnel Engineering Consultants (TEC)In this story
  9. ondersteunings- en horizontale bekistingsconstructiesMADEMA Steigerwerken BVMentioned in Temporary support structures for in-situ decks
  10. temporary supportCT deBoerMentioned in Temporary support structures for in-situ decks
  11. supplier of the scaffolding systemMatemco Hulpconstructies BVMentioned in Temporary support structures for in-situ decks
  12. Steel-reinforced elastomeric bearingsKonstrukomMentioned in Reinforced elastomeric bearings
  13. dewatering worksHenk van Tongeren Water & TechniekMentioned in Dewatering operation
  14. civil underwater structuresDISA InternationalMentioned in A hive of activity underwater
  15. geïntegreerde video-, audio- en communicatiesystemenHacousto ProtecMentioned in The link to the traffic control centre
  16. supplierJdB groepMentioned in Reusing and upgrading soil products
  17. consultancy firmStrypesMentioned in Making a difference
  18. sealing specialistViltonMentioned in Sealing expert prevents ‘water ingress’
  19. industrial automation specialistICT GroupMentioned in Control software for tunnel systems
  20. Breaking down foundation pile headsBlijleven KoppensnellersMentioned in Dust-free pile cropping on the Blankenburg Connection
  21. excavationVerboon MaaslandMentioned in Preparing complex construction pits for construction
  22. waterproofingPolyproofMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  23. waterproofing injectionsSpecial Industrial Repair (SIR)Mentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  24. supplier of waterproof coatingsAdcosMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
  25. wall formworkPERIMentioned in Save time and money with an advanced formwork system
  26. temporary bridgesRetro BridgeMentioned in Six temporary bridges improve access to construction site
  27. edge elementsTakke BreukelenMentioned in Architectural edge elements in composite and stainless steel
  28. precast concrete structuresVan Dijk BetonMentioned in Versatile in precast concrete structures
  29. designRijkswaterstaatMentioned in Versatile in precast concrete structures
  30. pylon claddingGlasGroenMentioned in A touch of nostalgia on the Blankenburgverbinding

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBlankenburgverbinding
  • ThemeUnderground construction
  • SubjectBridge construction
  • CompanyTunnel Engineering Consultants (TEC)
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.