Rock-solid support structures

The Blankenburgverbinding is a succession of engineering feats, including various structures and flyovers.
To build the various concrete decks with minimal disruption, the necessary temporary works and support structures must be designed in full 3D. Thanks to the unique Kwiksteiger Support System, a product by Matemco Hulpconstructies, the amount of support equipment required is significantly reduced.
The Kwiksteiger Support System stands out from other scaffolding concepts on the market thanks to its higher-grade steel. “Our standards can easily carry a load of 75 kN or more, while other concepts often max out at around 40 kN,” says Jos Hendriks of Matemco Hulpconstructies. “This makes the system highly versatile and means considerably fewer standards are needed than with a conventional system. That said, for the large-scale Blankenburgverbinding project we are still supplying almost 2,000 tonnes of support equipment.”
Another unique feature of the Kwiksteiger Support System is that its tilting plates and wide range of adjustment sizes allow it to follow the shape of a structure or building perfectly. Unlike usual practice, Matemco Hulpconstructies is not supplying construction consortium BAAK directly, but Madema Steigerwerken. “On this project, we are acting as a supplier to the scaffolding contractor, and together we are two crucial partners for BAAK.”
Question about this story? Ask your question
Who worked on Blankenburgverbinding
- construction consortiumBAAKMentioned in Unique and remarkable: 800-metre-long floating reed bed in the Krabbeplas near Vlaardingen
- crane matsKo-MatsMentioned in German engineering in dragline mats for the Blankenburg Connection project
- tijdelijke ondersteuningsconstructieCiviele technieken deBoerMentioned in Jacking, sliding and pressing
- designTunnel Engineering Consultants (TEC)Mentioned in Environmental and community interests at the heart of a unique technical concept
- ondersteunings- en horizontale bekistingsconstructiesMADEMA Steigerwerken BVMentioned in Temporary support structures for in-situ decks
- leverancier van het steigersysteemMatemco Hulpconstructies BVMentioned in Temporary support structures for in-situ decks
- geïntegreerde video-, audio- en communicatiesystemenHacousto ProtecMentioned in The link to the traffic control centre
- Breaking down foundation pile headsBlijleven KoppensnellersMentioned in Dust-free pile cropping on the Blankenburg Connection
- waterproofingPolyproofMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- waterproofing injectionsSpecial Industrial Repair (SIR)Mentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- leverancier van waterdichte coatingsAdcosMentioned in A24 Blankenburgverbinding: Urgent job for waterproofing specialist
- edge elementsTakke BreukelenMentioned in Architectural edge elements in composite and stainless steel
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBlankenburgverbinding
- SubjectRoad construction