‘Specials’ for water engineering

Samson Appendages has been a renowned supplier of all kinds of ‘specials’ for water engineering for many years. These range from stoplogs, spindle-operated and safety gates to high-end slide gates and spring-loaded non-return valves. On the Markermeerdijken, Samson Appendages is supplying seven sealing barriers for emergencies and maintenance work on the culverts running through the strengthened dikes.
To regulate water levels in the polder, new culverts are being built at seven locations along the Markermeerdijken. “In an emergency or during maintenance on these culvert structures, the culvert must be able to be sealed completely,” explains Geert Timmer of Samson Appendages. “On behalf of the Alliantie, we are designing and manufacturing the aluminium sealing barriers for this purpose. The barriers range in size from 1.70 by 1 metre to almost 4 metres wide and 2 metres high. They are made from hollow 100 by 200 mm profile beams with a wall thickness of 2.5 mm. The latter depends mainly on the water pressure. We can go up to a wall thickness of 5 mm.”

The profile beams are joined together and enclosed in a stainless steel frame to achieve the required dimensions. Timmer: “A lifting device is fitted at the top so the barriers can be installed and removed. If required, we can also fit the barriers with an opening, but that was not needed here. Our sealing barriers have a wide range of applications. They are often installed along rivers during high water, as they were this summer along the Maas and in the IJsselmeer, to protect port areas during storm surges and high water. In the latter case, even double barriers are installed. It is truly a highly modular and extensive system, allowing us to provide a great deal of customisation with infill sections and connections to other materials.”
Question about this story? Ask your question
Who worked on Markermeerdijken
- led consortiumBoskalis NederlandMentioned in Broad foundation expertise for the Markermeerdijken project
- All-round foundation specialistGebr. van ’t HekMentioned in Broad foundation expertise for the Markermeerdijken project
- welding and fabricationLinden StaalbouwMentioned in Broad foundation expertise for the Markermeerdijken project
- engineering consultancyHektecMentioned in Broad foundation expertise for the Markermeerdijken project
- clientHoogheemraadschap Hollands NoorderkwartierMentioned in A complex technical challenge calls for a unique partnership
- Integrated monitoring team (IMT)AMMDMentioned in Managing the risk of damage at the Markermeerdijken
- earthmoving machinery with operatorHuiberts BVMentioned in Cumela contractor at the heart of the dike reinforcement project
- contractorDe Vries & van de WielMentioned in Hopper suction dredger TEXEL unloads more than 3.5 million m3 of sand
- settlement markers and other temporary worksWelding and assembly work (LMW)Mentioned in Special settlement gauges and fencing
- sealing panelsSamson AppendagesIn this story
- reinforcement supplierSpanberg WapeningMentioned in Integrated design and installation of reinforcing steel
- integrated designStaalis EngineeringMentioned in Integrated design and installation of reinforcing steel
Keep following this
Get an email when a new story is published. No account needed.
- ProjectMarkermeerdijken
- ThemeFlood protection and climate-resilient water management
- SubjectWater infrastructure
- CompanySamson Appendages