A single point of contact for all inspection and monitoring work

The area around the Markermeerdijken is characterised by very soft ground. The utmost care is required when strengthening the dykes to keep settlement to a minimum. Nevertheless, the surrounding area and adjacent buildings are being closely monitored by independent inspection and consultancy firm Van Monsjou & Partners.
Since 2015, Van Monsjou & Partners has carried out half-yearly surveys of all buildings (level markers) along the 33-kilometre route on behalf of Alliantie Markermeerdijken. “This involves a total of 450 buildings and 1,800 level markers installed in the past,” says Sander van Monsjou. “We have extensive expertise in monitoring and can carry out vibration measurements and structural condition surveys, as well as level surveys.
This combination means the Alliance has just one point of contact for inspection and monitoring work on the project.”

Unusual behaviour
“By starting to survey the buildings at an early stage, we can build up a picture over a longer period of their normal movement and settlement behaviour,” Van Monsjou continues. “This gives us a clear picture of which buildings are more or less susceptible to settlement, which is important for the construction work. In 2019, we then began carrying out structural condition surveys in accordance with BRL 5024. Our company was instrumental in developing this guideline, which is now being required by an increasing number of clients and has gradually become the norm.”
Since the Alliance began work on site, Van Monsjou & Partners has also been carrying out deformation surveys. “Level markers and/or prisms have been installed in buildings close to the works. Regular measurements monitor their position in three directions (x, y and z),” Van Monsjou explains. “Finally, we also carry out vibration measurements to monitor the impact of the works and traffic on the buildings. The Alliance can view the measurements directly in an online portal. When a trial is carried out to assess the impact on the surrounding area, as happens regularly, the results are immediately visible and the construction method can be adjusted if necessary.”
Van Monsjou & Partners records the impact of the dyke reinforcement works on the surrounding area. “The Alliance takes the utmost care in this respect, so that immediate action can be taken if a limit is exceeded anywhere. It is a dynamic and large-scale project for us too,” Van Monsjou acknowledges. “The Alliance is working on several dyke sections at the same time, and we are often called on at short notice to take a measurement or install a vibration meter. That makes the project very interesting, quite apart from the beautiful surroundings.”
Question about this story? Ask your question
Who worked on Markermeerdijken
- led consortiumBoskalis NederlandMentioned in Broad foundation expertise for the Markermeerdijken project
- All-round foundation specialistGebr. van ’t HekMentioned in Broad foundation expertise for the Markermeerdijken project
- welding and fabricationLinden StaalbouwMentioned in Broad foundation expertise for the Markermeerdijken project
- engineering consultancyHektecMentioned in Broad foundation expertise for the Markermeerdijken project
- clientHoogheemraadschap Hollands NoorderkwartierMentioned in A complex technical challenge calls for a unique partnership
- Integrated monitoring team (IMT)AMMDMentioned in Managing the risk of damage at the Markermeerdijken
- earthmoving machinery with operatorHuiberts BVMentioned in Cumela contractor at the heart of the dike reinforcement project
- contractorDe Vries & van de WielMentioned in Hopper suction dredger TEXEL unloads more than 3.5 million m3 of sand
- settlement markers and other temporary worksWelding and assembly work (LMW)Mentioned in Special settlement gauges and fencing
- reinforcement supplierSpanberg WapeningMentioned in Integrated design and installation of reinforcing steel
- integrated designStaalis EngineeringMentioned in Integrated design and installation of reinforcing steel
Keep following this
Get an email when a new story is published. No account needed.
- ProjectMarkermeerdijken
- ThemeFlood protection and climate-resilient water management
- SubjectWater infrastructure