
Replacement of the Baarlo–Blerick rising main
Commissioned by Waterschap Limburg, GW Leidingtechniek is replacing the 6-kilometre sewer rising main between the pumping station in Baarlo and an overflow chamber in Blerick.

Innovative ‘pipe sheet pile wall’ for KIJK dike reinforcement project

Biodegradable lubricants offer lower total cost of ownership for civil engineering structures over the long term

Commercial divers help improve water safety

From crisis to constant vigilance

High-quality aggregates for bank and bed protection

From individual pipes to complete solutions

Specialist dredging in confined urban areas

Robust sealing with bentonite mats at the Westkolk of Born Lock

Integrated project safeguards Amsterdam’s flood protection

Widening the busy Kiel Canal (D)

Strong on the water, ready for tomorrow

A digital revolution in groundwater abstraction

Building the future of the water construction sector

Van Aalsburg sees growing role for nature-based water engineering

TBS-SVA Groep helps tackle water treatment challenges

WarmtelinQ drills longest heat transmission pipeline beneath Nieuwe Maas

What you see is only the tip of the ‘iceberg’

Vanderkamp expands with Solutions, Rental and Water Treatment

The power of systems integration in the renovation of the Krammer Locks complex

Nature and safety go hand in hand in the Netherlands

High-tech beneath the Scheldt

The Netherlands’ most sustainable cast-iron drinking water pipeline installed in Zevenhuizen

Accelerating with vision: strengthening the Havendijk in Den Helder
Elke twee weken het beste van Grond/Weg/Waterbouw Nederland in je inbox.
- Projects, products, solutions and partners
- The most interesting industry developments
- Free and without further obligation
Sign up for free
In your inbox every fortnight.








