1. Grond/Weg/Waterbouw Nederland
  2. Topics
  3. Underground construction
  4. All stories
Theme

Underground construction

All stories on this topic, newest first.

Back to the topic

Building circular load-bearing capacity

With twenty years’ experience, equipment developed in-house and a wealth of data collected by its own laboratory, circularity and sustainability are in Terrastab’s DNA.

Road construction

Infiltrating clean water matters more than you think!

Water infrastructure

Custom grout units with integrated water tank

BouwMat

Sharper infrastructure performance starts with database-backed insight

Digitalisation & software

Underground Infrastructure Square at Infra Relatiedagen 2024

News

Underground Infrastructure Square at Infra Relatiedagen 2024

BouwMat

Underwater concrete poured for RiF010 Rotterdam construction pit

Concrete

This system gives you full control over foundation work

Foundations / Site investigation

Specialist contractor and foundation company deploys diverse disciplines on large-scale, complex A9/VeenIX project

Foundations / Site investigation

Gebr. De Koning installs 9 kilometres of sheet piling with zero emissions

Water infrastructure

H5S’s sonic-drilled anchors help keep dykes safe in the Netherlands

Water infrastructure

ArcelorMittal optimises sheet pile use on the Tiel-Waardenburg dike reinforcement project

Water infrastructure

Foundation repair specialist

Foundations / Site investigation

A dedicated training school for the piling sector

Foundations / Site investigation

Flexible piling with zero emissions

Foundations / Site investigation

Foundation specialist keeps innovating

Foundations / Site investigation

Safe and sustainable operation of piling rigs

Foundations / Site investigation

A complex reinforcement puzzle for The Ensemble cofferdam

News

Wet excavation of a cofferdam to 10.1 metres below NAP

Water infrastructure

Advanced tunnel data services: a scalable solution for greater efficiency and safety

News

First fully electric piling rig delivered

BouwMat

Case study: missing material certificates for a sheet pile wall

Underground infrastructure

Hybrid piling at the Port of Antwerp with an electrified powerhouse

Foundations / Site investigation

Innovative technology with data logging

BouwMat
Newsletter

Elke twee weken het beste van Grond/Weg/Waterbouw Nederland in je inbox.

  • Projects, products, solutions and partners
  • The most interesting industry developments
  • Free and without further obligation

Sign up for free

In your inbox every fortnight.

Welcome.The next newsletter is coming your way.

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.