News

Advanced tunnel data services: a scalable solution for greater efficiency and safety

Text Chris ElbersImage Croonwolter&dros

De Noordtunnel is één van de zes Rijkstunnels in West-Nederland Zuid waarvoor Croonwolter&dros binnen het prestatiecontract TOPII verantwoordelijk is voor het meerjarig onderhoud.
De Noordtunnel is één van de zes Rijkstunnels in West-Nederland Zuid waarvoor Croonwolter&dros binnen het prestatiecontract TOPII verantwoordelijk is voor het meerjarig onderhoud.

Noordtunnel equipped with the IA building block Object Data Services

Under the TopII performance-based contract, Croonwolter&dros is responsible for the long-term maintenance of six Rijkswaterstaat tunnels in the south of the western Netherlands. One of these is the Noordtunnel, located between Alblasserdam and Hendrik-Ido-Ambacht. Last May, this structure became the first tunnel in the Netherlands to be equipped with Rijkswaterstaat’s IA building block Object Data Services (ODS). This standardised solution provides secure access to operational control data. Linking this information to Croonwolter&dros’s advanced tunnel data services makes the management and maintenance of the structure more efficient and predictable.

Asset manager Brendan Kleer (left) and consultant Jeroen Ruzicka.

Unlike many bridges and locks, existing tunnels in the Netherlands do not yet have an ODS data connection. The Noordtunnel’s connection marks a definitive change. The other tunnel structures covered by the TopII contract will also follow in the coming years. “Rijkswaterstaat’s Central Information Provision department has drawn up a roadmap to equip the tunnels, including the Noordtunnel, with ODS,” says Brendan Kleer, asset manager in the Technology & Development department of Croonwolter&dros’s Infra division. “We are building on this step with our data-driven asset management, a strategy focused on predicting as accurately as possible what maintenance and repairs will be needed. By working with the right partners, we have now implemented the ODS data connection at the Noordtunnel. In future, we can use data collection, analysis and sensors to identify potential problems at an early stage, preventing system faults and outages. This will improve efficiency and safety, while ensuring road users are not adversely affected by any defects.”

At-a-glance insight into the performance of an asset category.

A great plan

The implementation of ODS and its connection to Croonwolter&dros’s tunnel data services are being carried out in close collaboration between the two parties. “Rijkswaterstaat challenged us during the tender phase to consider how we could make faults and maintenance more predictable,” continues Jeroen Ruzicka, a consultant also working in the department mentioned above. “We then developed a plan centred on data-driven asset management. Rijkswaterstaat rated the approach highly, and it is now being rolled out. We are moving from manual data analysis and dashboards to making data available online in real time and analysing it automatically. The next step in enriching the information is to use new data sources, such as sensors. This will make our analyses even more reliable.”

The ODS data connection enables potential problems to be identified at an early stage through data collection, analysis and sensors.

Smarter systems

Ensuring the systems used are optimally secure is paramount when collecting and transferring data. Secure access to the systems safeguards this process. Unauthorised users cannot access the object data. For now, this data relates exclusively to the Noordtunnel. Croonwolter&dros is tasked with extending this smart approach to the other tunnels managed by the TBI company under the TopII contract. “The Noordtunnel is the starting point for making maintenance increasingly data-driven and making even better use of the opportunities to obtain control data,” says Brendan. “The aim is to use a standardised approach and algorithms to produce even more precise analyses. This development will take place in stages, but we have the expertise to meet the challenges.”   

A business enquiry for Croonwolter&dros? Get in touch

Who worked on it

Noordtunnel in Alblasserdam

  1. IA building block Object Data ServicesRijkswaterstaat

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectNoordtunnel
  • ThemeUnderground construction
  • SubjectNews
  • CompanyRijkswaterstaat
  • CompanyCroonwolter&dros
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.