As part of the renovation and upgrade of the existing wastewater pressure pipeline (AWP), all electrical components are being renewed and a high degree of process automation introduced. As a valued PAUW partner, Hoppenbrouwers Techniek has been involved in Waterschap Brabantse Delta’s flagship project from the outset. We speak to Industrial Automation Project Manager Miguel De Koninck.
Hoppenbrouwers Techniek has been active in the drinking water and wastewater sector for fifteen years and is now a well-established name in the market. In this capacity, Hoppenbrouwers is a regular partner of GMB Waterkwaliteit & Installaties in delivering projects in the sector. Before the AWP 2.0 project came to market, the two companies had already joined forces and agreed to work together on the project if the opportunity arose. “The arrangement was for us to be a full partner in the tender team,” De Koninck recalls. “Throughout the entire tendering period, a team from our company, like the other PAUW partners, was based at GMB to achieve optimal synergy in coordination, design and planning.”

Roosendaal pumping station: new medium-voltage switchboard.
Changeover phases
As part of the project, Hoppenbrouwers is responsible for the electrical systems, namely the medium- and low-voltage systems, process automation, and heating, cooling and ventilation in the buildings. De Koninck says: “The biggest challenge for us is the changeover phases. During each phase, the maximum permitted full shutdown is 8 hours. We also have to guarantee delivery (transport) throughout the entire changeover period. Naturally, we have put various control measures in place. One example is an improved standby arrangement, guaranteeing n+1 at all times. We also manage risks by holding regular risk sessions and aim to avoid surprises by using integrated LEAN planning with all the parties involved, including Waterschap Brabantse Delta.”

Roosendaal pumping station: existing pump chamber.
Avoiding surprises
De Koninck sees AWP 2.0 as an excellent reference project for Hoppenbrouwers. “It is attracting considerable attention from outside the project. The fact that it is a flagship project for the water authority also makes it unique for us. Waterschap Brabantse Delta wants a fully managed service, and that is precisely where our strength lies. We have the knowledge and expertise in-house and advise the water authority on making the right choices for the various solutions, validated against the requirements. We guide the water authority through the process, explaining which choices we make and why. This avoids surprises and builds commitment, which is greatly appreciated. So far, the project is on schedule and meeting everyone’s expectations. Cooperation between the PAUW partners and with the water authority is excellent. It is measured and evaluated periodically, with meetings at every level almost every week.”
The PAUW partners have now been working on the project for a year since the tender, and the detailed design (DO) phase is complete. The engineering phase is in full swing, and “We have been working on site for a few weeks now. This is when things really start to get exciting, but we are confident it will all go well,” De Koninck concludes.
Een zakelijke vraag aan Hoppenbrouwers Techniek? Get in touch
Who worked on AWP 2.0
- construction of the second pipeline
GW LeidingtechniekMentioned in Update on the renovation of the Wastewater Rising Main - process automationCroon Wolter en DrosMentioned in Update on the renovation of the Wastewater Rising Main
- temporary pumping installationsVan der Kamp PompenMentioned in Temporary pumping installations safeguard AWP continuity
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAWP 2.0
- SubjectBouwMat
- CompanyHoppenbrouwers Techniek
- CompanyGMB