On a high-profile project such as the renovation and renewal of the wastewater pressure pipeline (AWP 2.0) in West Brabant, it is important that the scope is never lost sight of. Within the PAUW consortium, Royal HaskoningDHV acts as BIM coordinator for all parties, among other roles, and takes an overview of the bigger picture. To prevent surprises, the consultancy and engineering firm uses a Virtual Commissioning model, a digital simulation for testing the control systems at the pumping stations. This is unique in the Netherlands.

Digitalisation

According to Maartje Wise, Project Director at Royal HaskoningDHV, GMB Waterkwaliteit & Installaties has relied on the consultancy and engineering firm’s expertise for many years. “We have worked together across the business on various projects for many years, ranging from flood defence upgrades to pumping stations, and so on. That collaboration seems to be intensifying all the time. For the AWP 2.0 project, we worked on the tender together with the other PAUW partners. The fact that only two other bidders were involved gives an idea of the project’s complexity. The risks are high, so we have made a major commitment to digitalisation and clash detection on this project. Digital transformation is also firmly embedded in our strategy, and we are making major advances across the business.”

Royal HaskoningDHV is coordinating all the 3D design work for AWP 2.0.

Pieces of the puzzle

For AWP 2.0, Royal HaskoningDHV is responsible for the hydraulic design, civil and structural design, mechanical engineering coordination, interface coordination for the pump control plans, and BIM coordination for all PAUW partners. “The collaboration between all the partners runs like a well-oiled machine,” says Maartje. “Communication is open and transparent, and everything really is up for discussion. That is also helpful for addressing potential risks. At Royal HaskoningDHV, we now use BIM on virtually all our infrastructure projects. We have extensive 3D modelling expertise and are coordinating all the 3D design work for AWP 2.0, so that all the pieces fit together neatly in one integrated model. This also makes it possible to carry out clash detection, bringing any issues to light at an early stage. What is genuinely innovative is that we are creating a Virtual Commissioning design for the AWP, a virtual model that can fully simulate the process between the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT).”

Virtual Commissioning

Christiaan Nieuwenhuizen, Hydraulic Engineer at Royal HaskoningDHV, explains the Virtual Commissioning (VC) model. “It is essentially a digital test environment (digital twin) of the pump installations supplied by Pentair Nijhuis and the long pressure pipelines, which allows us to test the pump controls designed by Hoppenbrouwers Techniek. We can then see virtually how the pumps and the transport system respond to different situations. It is often impossible to test every scenario in reality because there is not enough water. The VC model allows us to examine all possible variations or deviations that could occur. This is to prevent surprises when the system is put into operation.” Maartje adds: “The VC model is a perfect fit with our digital transformation. On a project as complex as this, being able to eliminate or reduce risks adds enormous value.” 

Een zakelijke vraag aan Pentair Fairbanks Nijhuis? Get in touch

Who worked on AWP 2.0

  1. construction of the second pipelineGW LeidingtechniekMentioned in Update on the renovation of the Wastewater Rising Main
  2. consultancyKragtenMentioned in Update on the renovation of the Wastewater Rising Main
  3. process automationCroon Wolter en DrosMentioned in Update on the renovation of the Wastewater Rising Main
  4. main contractorGMBMentioned in AWP 2.0: Always in operation
  5. the pumpsPentairMentioned in AWP 2.0: Always in operation
  6. E&PAHoppenbrouwersMentioned in AWP 2.0: Always in operation
  7. clientWaterschap Brabantse DeltaMentioned in AWP 2.0: Always in operation
  8. temporary pumping installationsVan der KampMentioned in AWP 2.0: Always in operation
  9. designRHDHVMentioned in AWP 2.0: Always in operation
  10. BIM coordinatorRoyal HaskoningDHVMentioned in A bird’s-eye view prevents surprises
  11. Pump controlHoppenbrouwers TechniekIn this story
  12. temporary pumping installationsVan der Kamp PompenMentioned in Temporary pumping installations safeguard AWP continuity

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAWP 2.0
  • ThemeDigitalisation from design to construction
  • SubjectBouwMat
  • CompanyHoppenbrouwers Techniek
  • CompanyPentair Fairbanks Nijhuis
  • CompanyGMB
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.