Temporary medium- and low-voltage infrastructure for the N206

With more than 40 years’ experience in site set-up, Theo Hartman of Bouwtech BPI knows the ropes inside out. Even so, the temporary infrastructure for the sunken section of the N206 ir. G. Tjalmaweg was “a special one” for him too.
The N206 Tjalmaweg is part of the RijnlandRoute. “We were able to take part in the tender for the first section of this major project, together with the international contractor consortium Comol5,” says Hartman. “After the contract was awarded, we were given the opportunity to deliver all the temporary infrastructure. As a fitting reward for our work, Boskalis then invited us to submit a price for the site set-up for the final section of the RijnlandRoute, the N206 Tjalmaweg.”
Aluminium instead of copper
Bouwtech BPI specialises in installing temporary infrastructure for water, electricity, sewerage and data. “We are often brought in during the tender stage to plan and budget the site set-up as efficiently as possible,” Hartman continues. “We also work for all the major infrastructure contractors in the Netherlands and are involved in projects of all kinds. Our ability to handle both medium and low voltage is a specialism that is now rarely found under one roof in the temporary site facilities sector. We manage everything from A to Z: we draw up the design, prepare the budget and ensure timely delivery, within budget, of course. For medium- and low-voltage systems, we use aluminium only. Aluminium is lighter and much easier to work with than copper. It is also 30% cheaper and less susceptible to theft. It does take up a little more space, but we take that into account in our designs.”

Simultaneous demand
Bouwtech BPI’s main challenge was that the network operator’s infrastructure was available at only one point. Hartman explains: “Bridging the distance needed to supply the 2 km sunken section with a certain connection capacity requires considerable knowledge and expertise. We have had that in-house for many decades.” In the north, Bouwtech BPI installed a 400 kVA /630 Amp connection, guaranteed all the way to the end point, partly to meet demand from the wellpoint dewatering system along the full length (200 kVA), the two mixing plants, each rated at 100 kVA, and MIG welding activities rated at 100 kVA, with a certain level of simultaneous demand. At the southern end of the sunken trench, two separate 165 kVA/ 250 Amp connections were also installed for the site compounds. The medium-voltage set-up comprises a special installation with one set-up transformer from the network operator, followed by two set-down transformers to the left and right to limit voltage drop and cable thickness.”
In just three weeks, Bouwtech BPI installed all the temporary infrastructure on the north side, including 4,600 metres of single-core medium-voltage cable and more than 3 kilometres of low-voltage cable. “We also installed the temporary water system,” Hartman adds. “We had the water utility install four connection points to maintain a constant pressure and capacity of 15 m3 and to enable us to lay a 63 mm HDPE water pipe from each point, which is still reasonably easy to handle. We can make the most of our knowledge and expertise and feel at home on complex, challenging projects like these. Our collaboration with Boskalis on the N206 is running smoothly, and we have already started dismantling some sections.”
Have a business enquiry for Boskalis Nederland? Get in touch
Who worked on N206 ir. G. Tjalmaweg
- main contractorBoskalis NederlandMentioned in Innovative sealing system offers a high degree of flexibility
- water-resistant gel layerBE InjectMentioned in Innovative sealing system offers a high degree of flexibility
- process controlEnviro Quality ControlMentioned in Innovative sealing system offers a high degree of flexibility
- specialist foundation contractorFranki GrondtechniekenMentioned in The Netherlands’ largest ground injection project
- specialist foundation contractor
Voorbij FunderingstechniekMentioned in A solid foundation for the N206 - construction
Voets Gewapende GrondconstructiesMentioned in N206 cutting: pushing the boundaries of reinforced soil - Reinforced earth structureHUESKER NederlandMentioned in N206 cutting: pushing the boundaries of reinforced soil
- temporary infrastructureBouwtech BPIIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectN206 ir. G. Tjalmaweg
- SubjectRoad construction
- CompanyBouwtech BPI
- CompanyBoskalis Nederland