A continuous park landscape

The existing N206 ir. G. Tjalmaweg runs along the edge of Katwijk and Valkenburg, forming a transition to the open landscape of Vliegkamp Valkenburg and Mient Kooltuinweg. In view of future urban development at Vliegkamp and the need to improve regional accessibility, the N206 is being widened and lowered. The Province of South Holland is committed to giving the N206 a high-quality green appearance, so that the road is carefully integrated into its surroundings and the landscape can be enjoyed by local residents and passers-by. Design is therefore an integral part of this project. BoschSlabbers landschapsarchitecten has been closely involved in the project since the tender stage and is overseeing the delivery of a continuous park landscape during construction.

“As landscape architects, we joined Boskalis during the tender phase, contributing to the core team’s strategic thinking on landscape integration,” says Stijn Koole of BoschSlabbers. “It is quite unique for a project like this that the aesthetic requirements for the N206 Tjalmaweg have been given precedence over the technical specification. That shows just how important the Province of South Holland considers the appearance of the entire project. During the preparation of the Preliminary Design and Detailed Design, there is a very interesting interplay between engineering, construction, phasing and design, with spatial quality forming part of the integrated decision-making process. The result is an aesthetically pleasing end product that also works well. You can already see that in the construction work, and it will be evident when the new route and park zone open.”

VRIP and DRIP
BoschSlabbers and ZJA began by translating the Plan Vorming into a Preliminary Spatial Integration Plan (VRIP). “The aim was to use design documents, such as Preliminary Design drawings and 2D and 3D visualisations, to show how all the different requirements fit together,” Koole explains. “At this stage, we also explored the interfaces between the design disciplines and resolved them as an integrated whole. This ultimately led to the Definitive Spatial Integration Plan (DRIP), in which we developed the vision further and completed the landscape and planting plan to Detailed Design level. The project involves building not just a road, but also a high-quality park zone with mature planting and a wealth of biodiversity.”

High quality
Road users, too, will soon be surrounded by greenery. “In our view, choosing a membrane structure for the sunken section instead of a ‘concrete box’ was a masterstroke,” says Koole. “The membrane structure makes it possible to create a high-quality green wall in a much more sustainable way. It allows planting to grow upwards from the bottom, using the unique timber louvre wall, rather than only downwards from the top. Using a membrane did, however, have other implications, such as relocating the temporary N206 outside the box, but that was also resolved as part of the integrated design. By incorporating technical and phasing challenges into the integration plan, we arrived at an
optimal design of much higher quality.”
Visualising construction methods
Another benefit of the core team’s unique make-up is that BoschSlabbers was also regularly asked to visualise construction methods. “Visualising construction methods is a great help in starting a dialogue, both internally and externally with local residents, and in getting everyone enthusiastic about the project,” Koole says. “For example, we visualised the stages involved in building the sunken section. We also produced a simple hand-drawn sketch showing how landscape and engineering come together in a single design, making it easy to explain.”
“We are now gradually seeing the illustrations and designs we produced for the tender take shape on site. That is genuinely exciting, and not something you can take for granted,” says Koole. “‘Stick to the plan’ is one of the tender-phase mantras, and it still applies. We are, in a sense, the project team’s ‘conscience’, as one of the few members involved from the very beginning who is still active in the core team. This way of working is appreciated, and we hope it will be adopted more often on other projects.”
Have a business enquiry for Boskalis Nederland? Get in touch
Who worked on N206 ir. G. Tjalmaweg
- main contractorBoskalis NederlandMentioned in Innovative sealing system offers a high degree of flexibility
- water-resistant gel layerBE InjectMentioned in Innovative sealing system offers a high degree of flexibility
- process controlEnviro Quality ControlMentioned in Innovative sealing system offers a high degree of flexibility
- landscape architectsBoschSlabbersIn this story
- specialist foundation contractorFranki GrondtechniekenMentioned in The Netherlands’ largest ground injection project
- specialist foundation contractor
Voorbij FunderingstechniekMentioned in A solid foundation for the N206 - construction
Voets Gewapende GrondconstructiesMentioned in N206 cutting: pushing the boundaries of reinforced soil - Reinforced earth structureHUESKER NederlandMentioned in N206 cutting: pushing the boundaries of reinforced soil
- temporary infrastructureBouwtech BPIMentioned in Temporary medium- and low-voltage infrastructure for the N206
Keep following this
Get an email when a new story is published. No account needed.
- ProjectN206 ir. G. Tjalmaweg
- SubjectRoad construction
- CompanyBoschSlabbers
- CompanyBoskalis Nederland