N206 cutting: pushing the boundaries of reinforced soil

Most of the new N206 ir. G. Tjalmaweg is being built below ground level. Boskalis is relying on an innovative and, above all, sustainable reinforced soil construction method developed by HUESKER Nederland. The result is a more efficient programme, sustainable use of locally available excavated materials and minimal reliance on permanent concrete and steel.
Instead of a conventional concrete ‘box’, the new N206 is being built within a special membrane structure. “Structures like this are generally built with a natural slope at a specified gradient,” explains Joris van den Berg, managing director of HUESKER Nederland. Space constraints and construction phasing made that impossible here. The alternative would be a permanent retaining wall in concrete or steel, but this was not considered desirable in view of the project’s sustainability ambitions. “We were therefore asked during the tender process to explore the potential for a reinforced soil retaining wall. Given the dimensions, this was a significant challenge, and the concept had never been used in this way before.”
PVA yarns
Ultimately, HUESKER and Boskalis succeeded in developing a tender concept based on a reinforced soil structure. “This was a key factor in winning the tender. It was a great reward for the creative and ambitious approach taken by the design team,” says Van den Berg proudly. “But that was not the end of it. After the contract was awarded, the challenge became even greater, as we were asked to design these reinforced soil structures. For a year and a half, we worked together on a range of optimisations, based on the anticipated deformation calculations, consideration of sustainability aspects and expected service life. We also defined the materials to be brought in, with an emphasis on high-quality reuse. This included opting for local materials, such as material recovered from the demolished N206. This is possible here because we are using a geogrid made from PVA yarns, a material that withstands higher pH values.”

Gravity wall
Along the entire sunken section of the N206, the reinforced soil structure acts as a kind of gravity wall. “Think of it as a block that holds back the membrane and groundwater, while also having to withstand all the traffic loads from the road,” explains Van den Berg. “Combined with the relatively weak subsoil and the extremely slender dimensions, in terms of width-to-height ratio, this makes constructing the reinforced soil structure here a real feat. The work is being carried out by Voets Gewapende Grondconstructies, one of our regular partners. The reinforced soil structure is largely concealed behind an aesthetic facing wall with timber slats. Where there is no facing wall, the reinforced soil structure is covered with a special UV-protective sheet.”
The N206 Tjalmaweg brings together a host of innovative solutions. “A reinforced soil structure like this has never been used anywhere in the world before,” says Van den Berg. “It is a major, intensive project for us, and has now been under way for more than four years. The results speak for themselves. By using hardly any virgin materials and focusing instead on reuse, we are delivering a permanent, sustainable structure with a service life of at least 100 years. It is certainly a project that sets an example and leaves us keen to do more.”
Een zakelijke vraag aan Voets Gewapende Grondconstructies B.V.? Get in touch
Who worked on N206 ir. G. Tjalmaweg
- main contractorBoskalis NederlandMentioned in Innovative sealing system offers a high degree of flexibility
- water-resistant gel layerBE InjectMentioned in Innovative sealing system offers a high degree of flexibility
- process controlEnviro Quality ControlMentioned in Innovative sealing system offers a high degree of flexibility
- specialist foundation contractorFranki GrondtechniekenMentioned in The Netherlands’ largest ground injection project
- specialist foundation contractor
Voorbij FunderingstechniekMentioned in A solid foundation for the N206 - Reinforced earth structureHUESKER NederlandIn this story
- temporary infrastructureBouwtech BPIMentioned in Temporary medium- and low-voltage infrastructure for the N206
Keep following this
Get an email when a new story is published. No account needed.
- ProjectN206 ir. G. Tjalmaweg
- SubjectRoad construction
- CompanyVoets Gewapende Grondconstructies B.V.
- CompanyHUESKER Nederland
- CompanyBoskalis Nederland