Delivery of the navigation lock’s main drive

Demako is a one-stop shop for mechanical drives for bridges, locks and other structures. It has everything needed to deliver a project from A to Z: its own engineering department, welding and machine shop, and in-house installation team. Managing director Thomas Beckx says: “We have a wealth of knowledge, thanks in part to the variety of exceptional projects we have worked on, such as the third chamber at the Beatrix Locks, the Kieldrechtsluis in Antwerp and the new Verbindingsbrug in Zeebrugge. In our view, the Afsluitdijk belongs in this list of exceptional projects.”

For the Afsluitdijk upgrade, the Belgian company had two assignments: delivering the main drive for the navigation lock at Kornwerderzand, including the lower roller carriages and rails, and building the lock’s emergency drive. “The navigation lock itself is a large steel gate weighing 950 tonnes, 56 metres wide and 15 metres high,” Beckx explains. “The gate is opened and closed by a cable system. It rests on two lower roller carriages at the bottom of the navigation channel. These act like rail bogies, running along rails. Given the weight and the required design life, we opted for specially selected, extra-hard and tough steel for the rails, which are fully supported by cast-in steel sections.” Demako’s experience in building many different types of civil engineering structures allows it to apply different methods, systems and principles from other projects to the Afsluitdijk project. “In other words, we can introduce new systems with a proven track record on other projects, such as the rail-wheel design.”

Installation of the lower beams for the rails in the concrete floor.

A world of difference

Sustainability and safety are important considerations in both the design process and construction. “We are focusing, among other things, on recycling consumables. To keep the lock chamber as maintenance-friendly as possible over the long term, we take this into account from the design stage. Choosing, for example, a maintenance-free plain bearing or ball bearing can make a world of difference to operating costs, as well as to energy consumption and therefore environmental impact. Safety is also considered from the design stage. On site, we carry out inspections, toolbox talks and Last Minute Risk Analyses (LMRAs).”

Lively discussions

According to Beckx, Demako’s strength lies in its cross-disciplinary approach. “We got to work with the design team at Levvel and HSM. The expertise of Levvel’s design team led to discussions that consistently produced a ‘best for project’ solution. Everyone involved worked very constructively to tackle the challenges. For Demako, it was certainly a successful collaboration, with lively discussions.”     

Have a business enquiry for DEMAKO NV? Get in touch

Who worked on Keersluis Den Oever

  1. construction consortiumLevvelMentioned in Guide structures must prevent collisions with ships
  2. main driveDemakoIn this story
  3. design teamHSMIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKeersluis Den Oever
  • SubjectWater infrastructure
  • CompanyDEMAKO NV
  • CompanyHSM
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.