Water infrastructure

How early communication with local residents prevents complaints during the Dijkversterking Stad Tiel project

Text Suzanne van Gaale Beeld RPS advies- en ingenieursbureau

Tijdens de Dag van de Bouw 2023 stelde FPH Ploegmakers en Waterschap Rivierenland het werkterrein aan de Hertog Arnoldstraat open voor publiek.
Tijdens de Dag van de Bouw 2023 stelde FPH Ploegmakers en Waterschap Rivierenland het werkterrein aan de Hertog Arnoldstraat open voor publiek.

Open afternoons, information meetings, newsletters and a BouwApp. Every effort is being made to keep everyone who lives and/or works in Tiel informed about the work. Jeroen Duifhuizen is responsible for stakeholder management on the Dijkversterking Stad Tiel project on behalf of consultancy and engineering firm RPS. He explains more about his role and what it involves.

At a showcase afternoon, people could experience the effects of installing sheet piles.

As stakeholder manager, Jeroen is the first point of contact for local residents. In this role, he is responsible for all communications with the surrounding community. “I’m part of the core team, which consists of FPH Ploegmakers, the water authority and the municipality. Together, we keep everyone informed about the work. It’s especially important to involve local residents early on in a project like this, where we’re working in the middle of Tiel, some roads are closed for several weeks, and there is dust, noise and so on. As well as handling communications, my job is to make sure that the requirements and wishes of the local community, and the agreements made with residents, are actually met.” In addition to stakeholder management, RPS, part of Tetratech, is also responsible for managing permits from start to finish. This includes identifying the permits required and ensuring compliance with laws and regulations, as well as checking that all procedures have been followed correctly. 

At the 2023 Dag van de Bouw, visitors could explore the construction site.

Listening carefully goes a long way

As the first point of contact, Jeroen deals with all kinds of questions and complaints. “The good thing is that we work as a small core team, so we know each other well. If a resident calls me about a pump running and making a strange noise, one call to FPH Ploegmakers is all it takes to sort it out.” Jeroen’s job is also to hear people out when they have a complaint or are angry, for example because they have a punctured bicycle tyre due to the work. “If people can tell us what’s happened and feel that they’re being listened to, the problem is already largely resolved. So far, things are going well. Some people have been affected by our work for a year. But because we communicated early and kept them involved in the project, they’re happy with the end result. As a team, we’ll have every reason to be proud when it’s finished.”

Various meetings with residents have been held throughout the project.

From showcase afternoon to immersive trail and BouwApp

A range of channels are used to communicate with the local community, including newsletters, various types of meetings and the BouwApp. A showcase afternoon was held for local residents on the dyke at Bellevue. The focus was on experiencing the vibration and pressing of sheet piles, and on the measures taken to limit damage to homes and buildings. Last year, residents were even able to walk a special immersive trail along the city of Tiel and use a viewer and their own phones to see the changes before and after the dyke reinforcement. And on the 2023 Dag van de Bouw, FPH Ploegmakers and Waterschap Rivierenland opened the work site on Hertog Arnoldstraat to the public. All the work and the latest news can also be followed via the dedicated BouwApp. Users can also complete a satisfaction survey in the app. “We visit the people whose gardens we have to work in personally, for a final conversation about how they felt the collaboration went and what could perhaps be improved.” The survey and conversation results are not yet available, but given the small number of complaints received so far, Jeroen feels confident saying that people are satisfied with how the work has gone. “For example, high water meant that Havendijk was closed for much longer than planned. We expected a lot of complaints about this, but in the end we only received two phone calls. This also shows how much clear, early communication can achieve.”     

A special container serving as a viewing point where visitors can watch the work.

Een zakelijke vraag aan RPS Advies en Ingenieursbureau? Get in touch

Who worked on Dijkversterking Stad Tiel

  1. subcontractorKandt Aannemings- en FunderingsbedrijfMentioned in Kandt Aannemings- en Funderingsbedrijf’s knowledge, expertise and equipment on the Dijkversterking Stad Tiel project
  2. clientWaterschap RivierenlandMentioned in Kandt Aannemings- en Funderingsbedrijf’s knowledge, expertise and equipment on the Dijkversterking Stad Tiel project
  3. authentic stonesVogelensanghMentioned in How a ‘small’ project can be a big undertaking: Tiel dike reinforcement
  4. engineering consultancyABTMentioned in Tiel flood defence upgrade calls for innovative construction design by engineering firm ABT
  5. stakeholder managementRPS advies- en ingenieursbureauIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectStad Tiel dyke reinforcement
  • ThemeFlood protection and climate-resilient water management
  • SubjectWater infrastructure
  • CompanyRPS Advies en Ingenieursbureau
  • CompanyFPH Ploegmakers
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.