The new southern ring road in Groningen is complete. The 12-kilometre road is important for traffic travelling to and from the city, as well as for traffic passing through Groningen.
Road safety is ensured by the more than 40 kilometres of slipformed barriers installed by BKB Infra. Their flowing lines not only create a calmer view for road users, but also raise the project’s aesthetic quality to a higher level.

BKB Infra has extensive experience in slipforming barriers.

BKB Infra is regarded as the leading specialist in constructing slipformed barriers. “We have been involved in Aanpak Ring Zuid, as the project is officially called, since 2017,” says Laurens Bogerd, Commercial Manager at BKB Infra. “At the time, Combinatie Herepoort was still weighing up a precast barrier against a slipformed one, but the project’s complex phasing and aesthetic requirements led to a preference for a slipformed barrier. What we do is a kind of large-scale 3D printing. Using our slipform paver, we form concrete barrier in a flowing line from concrete mix in a single pass. We are not tied to a fixed length and can start wherever we like. This is a major advantage, particularly with a complex phasing programme such as the one here in Groningen.”

In the open sections, contraction joints were installed every 3.5 metres, with an expansion joint every 80 metres.

Complex phasing

Aanpak Ring Zuid is characterised by complex phasing across four clusters. “Work within those four clusters was also carried out in phases. For us, that meant a very fragmented project, with us called in to slipform a section of barrier at a time. Sometimes it was just 1,000 metres, while on other occasions it was several kilometres,” Laurens recalls. “We carried out the first work in 2020, and completed the final kilometres during the summer holiday in 2024. The great thing about this technique is that you can’t see the phasing in the finished result. It’s a different story with precast barriers. You can’t skip a phase, everything has to be installed consecutively, whereas we can easily work a barrier in between two existing ends. And that is exactly what happened here on a large scale. Particularly in 2024, when the consortium connected the four separate clusters: Vrijheidsplein, Julianaplein, the sunken section and Europaplein.”

Road safety on Groningen’s new southern ring road is ensured by the more than 40 kilometres of slipformed barriers installed by BKB Infra.

Special finish

The architect has clearly left their mark on the design of Groningen’s new southern ring road, Laurens says. “The structures are beautifully designed and richly decorated. The project is also characterised by organic forms and flowing lines, with a high standard of finish. The shape of a barrier is prescribed by law, but with a slipformed barrier we can emphasise those intended organic lines.   

Barriers are normally finished with a fine broom finish, but here everything was sanded and rubbed smooth. The saw cuts for the contraction and expansion joints were also washed clean, and we applied a special curing compound that leaves a less blotchy appearance.” In the open sections, contraction joints were installed every 3.5 metres, with an expansion joint every 80 metres. In the sunken section, BKB Infra incorporated a transverse joint in the slipformed barrier every 25 metres, allowing the sections to expand and contract and preventing the barrier from being crushed.

Aanpak Ring Zuid is characterised by complex phasing across four clusters.

GPS unit

BKB Infra has extensive experience in slipforming barriers. Since its first project in the combi tunnel in Nijverdal in 2012, BKB Infra’s slipformed barrier concept has grown enormously in popularity. “We know better than anyone how to turn requirements and constraints into a ready-to-use solution,” Laurens stresses. “We can also meet specific fire safety requirements. We adapt the mix used for the slipformed barrier to give a structure’s fire resistance an extra boost.” BKB Infra’s Wirtgen SP25i slipform paver is equipped with a GPS unit. “This means we can use a 3D design to determine the barrier’s design level directly, then cast it in a flowing line on the road. This makes it very easy to compensate for unevenness in the sub-base.”

Barriers are normally finished with a fine broom finish, but here everything was sanded and rubbed smooth.

On flat surfaces too

A slipform paver is supplied by the manufacturer with a standard mould. BKB Infra has modified and further developed its mould in-house. Laurens says: “We now have a range of around sixty unique profiles, including six variants for barrier construction, so we can offer a suitable solution for every situation. That makes us unique and versatile in terms of application. In between jobs, we move on to other projects elsewhere in the country. We also use our machine to cast flat surfaces, such as cycle paths ranging from 2 to 4.5 metres wide. As well as moving between the four clusters at Aanpak Ring Zuid, we regularly worked on other projects in Groningen in the meantime, such as a cycle path in Beerta. We have a strong presence in the province.” 

During the summer holiday, BKB Infra slipformed the final 6 kilometres of barrier for Combinatie Herepoort, bringing the unique project to a close. “A concrete achievement our team can be proud of!”     

A business enquiry for BKB Infra? Get in touch

Who worked on Aanpak Ring Zuid

  1. dewateringHenk van Tongeren Water & TechniekMentioned in Keeping the site dry at Aanpak Ring Zuid
  2. independent oversightAbomaMentioned in Exceptional safety culture at Aanpak Ring Zuid
  3. clientalliantie van Rijkswaterstaat, de gemeente en de provincie GroningenMentioned in Exceptional safety culture at Aanpak Ring Zuid
  4. Renovation portalsBirkhoff StaalwerkenMentioned in Refurbished gantries and bespoke structures
  5. slipformed barriersBKB InfraIn this story
  6. contractorKnol AkkrumMentioned in Tailor-made foundation solution with a special 452-pile pile mattress
  7. scaffolding contractorGjaltema GroepMentioned in Well informed, even underground
  8. engineering consultancyMUGMentioned in “Proud that we made no mistakes on a mega-project like this”
  9. construction consortiumHerepoortMentioned in 11,000 m3 of underwater concrete for Groningen ring road

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAanpak Ring Zuid
  • SubjectRoad construction
  • CompanyBKB Infra
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.