Water infrastructure

Underwater work in the construction pit

In totaal is zo’n 9.000 m3 onderwaterbeton gestort. (Beeld: Aquatech-Diving))
In totaal is zo’n 9.000 m3 onderwaterbeton gestort. (Beeld: Aquatech-Diving))

To build the underground Singelgrachtgarage-Marnix, a large construction pit was created and divided into four compartments. It was a job tailor-made for the Frisian company Aquatech-Diving. Over a period of 18 months, an average of four to five diving teams were at work. According to Steven Spanhaak, managing director of Aquatech-Diving, the project was particularly challenging because of the logistics.

9,000 m3 of underwater concrete

The diving teams inspect the construction pit walls at three levels. (Image: CarlyWollaert)

The Coentunnel, Jaarbeursplein, various aqueducts in Friesland and quay works in Amsterdam: Aquatech-Diving’s people are well accustomed to underwater projects. The diving company specialises in underwater civil engineering and operates throughout the Netherlands and beyond, including on wind farm construction, salvage operations, inspections and underwater work on infrastructure projects. Every project has its own particular features and challenges. The Singelgrachtgarage-Marnix is no exception. “We poured around 9,000 m3 of underwater concrete here in total,” says Spanhaak. “We come in at an early stage of the work to create a dry construction pit. Then, in the final phase, once the garage roof has been installed, we will cut off 1 kilometre of sheet piles.”

Aquatech-Diving installs anchors in the underwater concrete, as well as drainage to monitor floor pressure. (Image: Aquatech-Diving)

The diving teams get to work

Aquatech-Diving is working with contractors Mobilis, Voorbij and Boskalis to build the construction pit. Their work is closely coordinated. Once the sheet piles have been driven and Boskalis has excavated the pit, the strut frames are installed to support the walls. Aquatech-Diving oversees the assembly and connection of these frames. The diving teams also inspect the pit walls at three levels, checking that the sheet pile interlocks are correctly engaged and looking for any issues. They use pumps to remove any soil left behind, for example in the corners. “The main task, however, is pouring the underwater concrete for an 80-centimetre steel fibre-reinforced concrete floor,” says Spanhaak. “We also install anchors in the underwater concrete, along with drainage to monitor floor pressure, and place reinforcement cages in the floor for additional reinforcement. And, just as importantly, we clean the sheet piles with high-pressure water to improve the bond with the concrete floor.”

The main task is pouring underwater concrete for an 80-centimetre steel fibre-reinforced concrete floor. (Image: Aquatech-Diving))

Inspection and checks

The construction pit is divided into four compartments so that work can follow on from one another and continue without interruption. “Once compartment one has been excavated, it is inspected. If everything checks out, the next contractor can start work. We work like a production line. Aquatech-Diving plays an important role in checking and inspecting, among other things, the structural and concrete work.”

Everything from the water

The logistics are what make the Singelgrachtgarage-Marnix project particularly unusual. Spanhaak says: “It is a large construction project, but there is little space around it. Normally, you have a construction pit with plenty of room all around. Here, though, everything had to be done from the water, with materials brought in and taken away that way. It is only accessible from one point. Close coordination of the work is essential. It went well thanks to the excellent collaboration. Together, we did everything we could to get the job done.”  

A business enquiry for Aquatech Diving B.V.? Get in touch

Who worked on Singelgrachtgarage-Marnix

  1. the foundationVoorbij FunderingstechniekMentioned in Project-specific A-frame dredger deployed in construction of car park beneath the Singelgracht in Amsterdam
  2. senior site managerMobilisMentioned in A remarkable feat of underground construction in central Amsterdam
  3. underwater constructionAquatech-DivingIn this story
  4. contractorBoskalisIn this story
  5. contractorVoorbijIn this story
  6. shippingCity BargingMentioned in Complex excavation for the construction pit
  7. installing the reinforcementDiepstraten WapeningstaalMentioned in Thorough 3D preparation pays off on site
  8. building servicesDe Groot InstallatiegroepMentioned in Marnix car park receives ESPA Gold Award

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectSingelgrachtgarage-Marnix
  • ThemeUnderground construction
  • SubjectWater infrastructure
  • CompanyAquatech Diving B.V.
  • CompanyBoskalis Nederland
  • CompanyVoorbij Funderingstechniek
  • CompanyMobilis
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.