A remarkable feat of underground construction in central Amsterdam

Before long, there will be ample parking at the Singelgracht in Amsterdam. Or, more accurately, ‘under the Singelgracht’, because that is where the new Singelgrachtgarage-Marnix is being built, with no fewer than 800 parking spaces. It is an ambitious project by the municipality of Amsterdam, intended to create more space at street level.
Singelgrachtgarage-Marnix is being built in challenging conditions

The resulting space will benefit green spaces, pedestrians, cyclists and children at play. The project comes with its fair share of challenges: building in the busiest city in the country, in a confined space, beneath an existing canal. The site is the area between Tweede Marnixplantsoen and Marnixbad, and between Tweede Hugo de Grootstraat and Frederik Hendrikplantsoen. We speak to Peter Schoonderbeek, technical manager at the municipality of Amsterdam, and Martin Belder, site manager for Singelgrachtgarage-Marnix, who works for Mobilis.
Making the best of a difficult situation
“We started installing sheet piles and carrying out foundation work at the end of 2020,” says Belder. “We made the best of a difficult situation. To reduce the impact on the roads on and alongside the quay, everything was delivered by electric boat or boats running on HVO fuel. This reduced disruption on all fronts: less noise, no congestion on Nassaukade, and a more sustainable approach too. We then installed bracing frames and excavated the pit under water, down to 10 metres below water level. Next, we installed GEWI anchor piles, a gravel layer and the necessary reinforcement cages.”

Schoonderbeek adds: “Noise, traffic disruption and vibration have been kept to a minimum by pressing in the sheet piles rather than vibrating them into place. GEWI anchor piles were also a very good choice for this project. A GEWI anchor pile is a slender, cast-in-place pile that can transfer both tensile and compressive loads to deeper, load-bearing soil layers. These piles are used to hold the car park floor in place.” Belder says: “The underwater concrete, which is steel-fibre reinforced, is delivered by road. The rest of the materials come by boat. The 100,000 cubic metres of excavated soil are also taken away by boat. Excavation work was carried out from a pontoon.”
Current status
Asked about the current status of the work, Belder replies: “The entire construction pit has now been poured. The main pit consists of four compartments, all of which have been poured with underwater concrete. We are now installing the structural floors in two of these compartments. The floor of the lowest level works together with the underwater concrete floor, which made it possible to use a more slender design.” Schoonderbeek adds: “Bonded anchors have been fixed to the underwater concrete floor, and the floor of the second level is attached to them. This is not a standard approach, and required a lot of calculations. The additional reinforcement in the underwater concrete around the GEWI piles also came out of those calculations. It is a composite floor. The structural floor is anchored to the sheet piles, which also serve as the soil and water retention system during construction. The concrete structure will form the permanent water-retaining structure. The sheet piles will remain in place as soil retention and will be cut off just below the canal bed.” The sheet piles in the canal do not connect to the quays, as the trees had to be preserved.

What other special techniques can we expect?
Belder replies: “The sequencing of the connection between the main car park and the entrance ramp.” Schoonderbeek says: “The sheet piles are slanted. There was no alternative because of the trees that had to be preserved. This angle makes it challenging to attach the structural floor to the sheet piles.” Belder adds: “In certain places, the concrete wall and the sheet piles ‘clash’. The structural challenge here is to make the wall narrower in specific locations. We do this by varying the concrete thickness and adding extra reinforcement.” Schoonderbeek explains further: “Ultimately, the walls need to be fair-faced concrete. That means we have to consider the formwork to achieve neat, straight walls. This in turn presents a challenge when it comes to making the formwork watertight. A great specialist job, though!”
Logistically, working at this site remains a challenge. Belder says: “Materials can only be brought in and taken away by water from one side. This means a lot has to be transported over the construction pit, with the added constraint of limited space because of the trees. An overhead travelling crane is in place to get everything where it needs to be. We fitted it with a high-rise jib for placing all the concrete. This is a unique solution designed specifically for this project. The crane runs on rails laid on the sheet piles around the construction pit.” According to Schoonderbeek, more monitoring than usual is also needed to prevent issues that cannot be predicted in advance. “For example, settlement around the quay walls. Fortunately, buildings with poor foundations were identified in advance, and their owners were able to carry out the necessary foundation improvements with the help of a grant.”
Have a business enquiry for Mobilis? Get in touch
Who worked on Singelgrachtgarage-Marnix
- installing the reinforcementDiepstraten WapeningstaalMentioned in Thorough 3D preparation pays off on site
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSingelgrachtgarage-Marnix
- ThemeUnderground construction
- SubjectNews
- CompanyMobilis