Water infrastructure

Two divisions, one powerful team at Krammer Locks

Text Roel van Gils Image Bakker-Metaal

De twee stalen aansluitplaten zijn vervaardigd uit S355-staal, zijn elk veertien meter lang en zestig centimeter breed en zijn voorzien van meer dan vijfhonderd gaten.
De twee stalen aansluitplaten zijn vervaardigd uit S355-staal, zijn elk veertien meter lang en zestig centimeter breed en zijn voorzien van meer dan vijfhonderd gaten.

Bakker-Metaal is involved in the renovation of the Krammer Locks complex through two of its divisions. While bespoke structures are being manufactured in the workshop, the right skilled workers can be deployed straight away on site for installation and support work. Together, they form one powerful team, supporting the ZEEKR joint venture with a range of practical services.

A previous successful project in Amstelveen brought Bakker-Metaal into contact with the ZEEKR joint venture. “After an introductory meeting, it became clear that we fully met the requirements for supplying both the planned steel structures and further technical support,” says Peter Bakker, director of Bakker-Metaal. For the project, the structural steelwork company is producing a range of components, including connection plates, railings around steel hatches and a lifting frame for an underwater drone.

S355 steel

According to Peter, the two steel connection plates, made from S355 steel, required the utmost precision. “Each plate is fourteen metres long and sixty centimetres wide, and has more than five hundred holes. They are fixed to the concrete walls of the lock chambers and connect to the sheet-pile screens, creating a dry working area in the lock chamber.”

For the project, the structural steelwork company is producing a range of components, including connection plates, railings around steel hatches and a lifting frame for an underwater drone.

Support on demand

Bakker-Metaal also provides the necessary support on demand at the project site. “For example, our employees have cut existing water tanks removed from the lock into sections to make them suitable for transport,” says Peter. “Through our own employment agency, we can quickly provide extra capacity when the work requires it, from two people on a permanent basis to as many as thirty at peak times. That is the flexibility we offer.”

Bakker-Metaal is known for its direct lines of communication. “We respond quickly and effectively. Those qualities add real value for our client on a complex project such as the renovation of Krammer Locks,” Peter concludes.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeExtending the life of roads and civil engineering structures
  • SubjectWater infrastructure
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.