For major infrastructure projects, the most important decisions are often made during the preparation phase. For the 20.2-kilometre Neder-Betuwe dike reinforcement project, TAB Anker was brought on board as a supplier well before construction began, by High 5 Solutions, a specialist in installing ‘self-drilling’ anchors. TAB Anker manufactures a range of anchoring materials used in various foundation solutions.

TAB Anker specialises in anchor systems, but, as business manager Arnic Smits emphasises, does not see itself as a supplier that simply delivers a product. “Our roots are in hydraulic engineering and foundation engineering, and we combine that background with in-depth technical expertise. This means we often contribute from the design stage onwards, advising on structures, buildability and optimisation,” he says.

60 kilometres of anchors

As mentioned, TAB Anker is working closely with High 5 Solutions on the Neder-Betuwe dike reinforcement project. “Working closely with High 5 Solutions, we looked at how to create a ‘best-for-project’ solution for all parties, both in terms of design and construction,” says Arnic. The scale is impressive. “Around 1,950 ‘self-drilling’ anchors are being installed in total, adding up to almost 60 kilometres of anchor length in the ground. The anchors range from 24 to 36 metres in length and are supplied in seven different types, with diameters from 70 to over 100 millimetres. After production, the materials are stored at our facilities, and whenever a new project phase begins, High 5 Solutions calls off the materials it needs for each dike section.”

TAB Anker manufactures a range of anchoring materials used in various foundation solutions.

Rolled threads

A ‘self-drilling’ anchor consists of seamless steel tubes with rolled threads along their full length, Arnic explains. “During drilling, cement grout is injected into the ground where the grout body is to be formed, where it mixes with the sand present. The sections are joined using special couplers, after which the anchor is connected to the sheet pile wall structure. We also manufacture the nuts required to transfer the load.”

Impact in an unpredictable market

According to Arnic, TAB Anker’s greatest achievement today is no longer just its technical expertise. “Geopolitical tensions, changing market conditions and the introduction of CBAM regulations have made the steel market particularly unpredictable in recent months. To ensure our customers do not have to bear these risks, we are closely monitoring the situation, engaging with our customers and suppliers early, and holding strategic stock.”

TAB Anker holds strategic stock.

All sourced from Europe

TAB Anker also plays an active role in sustainability. “All the raw materials we purchase are produced in Europe,” Smits assures us. “Thanks to a favourable Environmental Product Declaration (EPD) and the use of large quantities of recycled steel, the anchors also achieve a strong score under the MKI system: a 72 per cent reduction compared with the standard NMD value.”

ICSI® pile for foundation repairs

TAB Anker is always looking for innovative and sustainable technical solutions. This is how the idea came about for the recently launched, innovative and sustainable ICSI® pile system for foundation repairs, which is now patented. “The improved coupling mechanism is not only lighter, which is better for the environment, but also gives the pile system a higher capacity. A win-win,” says Arnic, noting that TAB Anker recently began production in its own fully automated workshop. “The first projects have now been completed to everyone’s satisfaction.”

Whether it is complex anchor systems or innovative foundation solutions, at TAB Anker the focus is not on the product, but on the (technical) solution and customer contact. This approach makes it possible to limit risks and make the most of opportunities, even on the largest projects, such as this one at Neder-Betuwe.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeUnderground construction
  • SubjectWater infrastructure
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.