Water infrastructure

Successful coordination is vital to the Ooijen-Wanssum Area Development

Successful coordination is vital to the Ooijen-Wanssum Area Development

Following major floods along the Meuse in Limburg in 1993 and 1995, which caused enormous economic damage, temporary measures were put in place. Now, however, the Mooder Maas consortium, comprising Dura Vermeer and Ploegam, has started work on the Ooijen-Wanssum Area Development project. The large-scale project includes the construction of new dykes and a high-water channel, the restoration of the Oude Maasarm and the construction of a new bypass, including structures.

Engineering consultancy SGS Roos+Bijl has been appointed to coordinate all cable and pipeline works within the project. David de Jong, project coordinator at SGS Roos+Bijl, explains: “Major infrastructure projects like this are complex by nature. There are many different stakeholders in the area: network operators, as well as the water authority, Rijkswaterstaat, the province and the municipalities where we are working. We play a key role in connecting all the parties. Our approach means that everyone takes a constructive attitude and works together. We can deliver solutions within a short timeframe that satisfy all stakeholders. That is a great credit to everyone involved.”

Extensive diversion
“The village of Wanssum is divided by a tributary of the Meuse. The bridge connecting the two parts of the village is being renewed, which called for extensive diversions. By bringing all the parties together at an early stage, we were able to arrange for cables and pipelines across all disciplines to be diverted through a single large trench. This represents huge savings in terms of social costs.”

Met een gammaspectrometer en een grondradar wordt onder andere de dikte van de asfaltconstructie en het funderingspakket in kaart gebracht.

Cables and pipelines across all disciplines diverted through a single large trench.

Numerous additional constraints
Time is a limiting factor. The closed dike season means that less work can be carried out between October and April because of high water levels. Ecological and archaeological factors in the surrounding area must also be taken into account. Add to this the extensive permitting process, and the result is a complex operating environment in which diversions must be completed on time to avoid delaying the project. 

Integrated and flexible
“We took an integrated approach to considering how we could take sustainability into account and limit social costs. By asking for and offering a little flexibility here and there, we can deliver a great project. With this final solution, which will see no less than 18 kilometres of dike constructed or reinforced in the area, the area will be protected from flooding for the next 250 years.”      

A business enquiry for Roos Groep? Get in touch

Wie aan Gebiedsontwikkeling Ooijen-Wanssum werkte

  1. engineering consultancyRoosIn this story
  2. geo-data specialistFugroMentioned in Fugro’s unique, sustainable dike design provides a solution for Limburg
  3. landscape architectH+N+SMentioned in Fugro’s unique, sustainable dike design provides a solution for Limburg
  4. contractors' joint ventureMooder MaasMentioned in Fugro’s unique, sustainable dike design provides a solution for Limburg
  5. contractorsDura VermeerMentioned in Ooijen-Wanssum dike improvements sustainable and effective
  6. contractorsPloegamMentioned in Ooijen-Wanssum dike improvements sustainable and effective
  7. Landscape designH+N+S LandschapsarchitectenMentioned in Ooijen-Wanssum dike improvements sustainable and effective

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectOoijen-Wanssum area development
  • ThemeFlood protection and climate-resilient water management
  • SubjectWater infrastructure
  • CompanyRoos Groep
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.