Soil stabilisation in the HWBP

For dykes and water infrastructure, soil stabilisation is an attractive solution when ground improvement, semi-bound or structural foundations are required. These three applications for water infrastructure and dykes can be made more sustainable through the use of soil stabilisation.
Soil stabilisation binds existing materials in situ and upgrades them to the required structural strength. This can vary from project to project and is tailored to suit. The material can be reused thanks to Terrastab’s range of binders, additives and adapted machinery for these applications. The structure can be built under the influence of the tides and has a minimal environmental impact.
100% REUSE
With its own laboratory, Terrastab makes it possible to reuse almost all soil materials through the use of innovative additives. Terrastab develops alternative binders and other innovations in collaboration with TU Delft. With unique additives, we can reuse almost all (soil) materials as a basis for ground improvement or structural stabilisation.
CO2 REDUCTION
Using fewer primary construction materials, reducing transport movements and building quickly all help cut CO2 emissions. Using material from the site or from other projects, we create new foundations and pavements without using primary construction materials. By treating the material in situ and working quickly, we can save a considerable amount of CO2 emissions.
FAST CONSTRUCTION
Because our technique requires no material to be removed and little to be brought in, our structure can often be used quickly. Excavating, removing, bringing in and processing material often takes a long time on civil engineering projects. Terrastab’s technique causes less disruption to the surrounding area.
The same was true for the dyke reinforcement project in Yerseke. The sea dyke on the Oosterschelde near Yerseke had to be improved to meet safety requirements. Almost the entire length of the dyke consisted of (marine) clay with such poor bearing capacity that it could no longer serve as foundation material for the stone revetment. This saline clay also let too much water through, which could lead to dangerous situations. The traditional approach would have been to excavate around 28,000 m³ of saline clay and replace it with an 80 cm layer of granular blast furnace slag. As the excavated clay first had to be stockpiled before it could be removed, this would have taken too long. The large number of transport movements and the time required for processing would also have caused problems for the surrounding area.
Terrastab provided a solution by using the material on site and stabilising it to create a load-bearing foundation. This saved time, CO2, material and money on the project.
Een zakelijke vraag aan Terrastab Nederland B.V.? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeFlood protection and climate-resilient water management
- SubjectWater infrastructure
- CompanyTerrastab Nederland B.V.