Water infrastructure

Rapid assessment of large numbers of non-flood defence objects on flood defences

Risicoklasse per boom of gebouw voor een dijkstrekking bij Krimpen aan de Lek.
Risicoklasse per boom of gebouw voor een dijkstrekking bij Krimpen aan de Lek.

The Water Act requires all primary flood defences in the Netherlands to be assessed for safety every 12 years. Since 2017, this has been done using the Legal Assessment Framework (WBI 2017). This includes assessing the impact of non-flood defence objects (NWO’s) on the safety of the flood defence. An NWO is an object located in, on or near a flood defence that could adversely affect its stability and safety. Examples include trees, buildings and pipelines.

Hoogheemraadschap van Schieland en de Krimperwaard (HHSK) has almost 18,000 trees and more than 3,000 buildings in, on and near its 70 km of primary flood defences. The impact of all these objects on flood safety must be assessed. However, the standard assessment method under WBI 2017 is less suited to large numbers of objects. To assess HHSK’s NWOs, Iv-Infra and TAUW jointly developed a method suitable for large numbers of objects. The method falls under the ‘Custom Assessment’ in WBI 2017.  

Requirements for the method

To assess large numbers of objects, it is desirable to limit the number of individual calculations and the data required. The method must also be suitable for automation, so that as little manual work as possible is needed. A second requirement, in the context of the duty of care, was to consider not only the impact of the objects on the probability of failure within the ‘standard’ failure mechanisms, but also to assess the objects themselves. This makes it easier to shape maintenance and policy, for example by felling particular trees that pose a hazard.

Failure path for macro-instability, inner slope (STBI), with a tree in the hinterland.

Classifying objects by risk

The first step in the method is to assign every object a risk class from I (negligible risk) to V (high risk). An object’s risk class is determined by examining the failure path, in other words, the sequence of events that must occur before flooding results. This is done for each failure mechanism (macro-instability, piping, etc.) and each zone of the cross-section (crest of the flood defence, inner slope, etc.) in which the object is located. The probability of each event is estimated using expert judgement. The more events that must occur in sequence, and the lower the probability of each event, the lower the risk class. The risk classification also takes account of the ‘standard’ assessment of the dike section, whether already completed or not.

Only information about an object’s location on the flood defence is needed to classify objects by risk. The risk class is then combined with the category assigned to the dike section in the WBI assessment to produce an initial assessment result. If both the probability of failure of the dike section and the object’s risk class are low, the object can be ‘approved’; otherwise, the assessment continues. This means that in the next assessment round, the result for the objects can easily be updated by entering the findings of the new assessment of the dike body. The risk classes generally remain unchanged.

Calculating the probability of failure using an impact factor 

Objects not approved on the basis of their risk class are grouped into clusters according to the failure mechanism, the flood defence zone and the dike’s characteristics. The critical object is identified for each cluster, and a calculation is then carried out for it. Considering only the critical object in each cluster keeps the total number of calculations down. A total of 74 clusters were identified for this project.

For each cluster, the existing calculation for the dike body is adjusted to account for the object’s impact, for example by modelling an erosion pit (caused by an uprooted tree) in the stability calculation. Comparing the probabilities of failure from these calculations gives an ‘impact factor’, indicating how much the probability of failure increases when the NWO’s impact is included. This factor is then applied to the probability of failure for all dike sections containing objects in that cluster. If the probability of failure for the dike section with the NWO’s impact included falls into the same category as it does without the NWO, all objects in that cluster on the specific dike section are approved. If the category changes, the objects are rejected, although the assessment can be refined by considering the remaining objects individually.

Critical STBI slip surface with and without the impact of a tree (due to an erosion pit).

Automation

To assess large numbers of objects quickly, much of the method has been automated. For example, Iv-Infra’s 3D scanning vehicle drove along the dike, creating a point cloud of the area around the flood defence. Custom-developed scripts can identify objects from this point cloud and derive parameters such as tree height and trunk diameter. 

GIS scripts were then used to generate a cross-section for each object, showing which flood defence zone it is in and which assessment section (for each failure mechanism) it falls within. The category assigned to the dike body and the key data for the failure mechanism were linked to the object based on its assessment section. This also makes it possible to automatically determine a risk class for each object and, once the objects have been grouped into clusters, an impact factor.

Results

Based on the risk classification, more than 9,000 of the almost 18,000 trees and around 1,700 of the 3,000 buildings could be approved immediately. No assessment could yet be made of around 6,000 trees and 1,200 buildings among the remaining objects, because the WBI assessment of the dike body had not yet been carried out. The other objects were assessed further using clustering and calculation of the impact factor. Ultimately, this meant that all buildings and most trees could be approved. 

A total of 238 trees were ‘rejected’ for one or more failure mechanisms. The main reason is that they stand on the outer slope or crest of the flood defence, where the defence consists largely of sand. If these trees are uprooted, they can create a breach in the flood defence covering, allowing the dike body to erode rapidly during a design storm. Because the occurrence of this storm is correlated with trees being uprooted, the likelihood of timely repair is low, unlike for most other objects.     

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeFlood protection and climate-resilient water management
  • SubjectWater infrastructure
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.