VR/AR and BIM are making our industry future-proof!

Economic growth continues, and the need to innovate is greater than ever. The growing pressure on infrastructure and rising demand for smarter, more cost-effective solutions are the challenges of the future. This calls for new skills. So the question is: are you joining the hype, or are you truly future-proof?
Jeffrey van Tol, BIM coordinator at TBI company Mobilis, has a clear answer: “Change in the construction sector is accelerating. 3D modelling, parametric design, cloud-based software solutions, drones, 3D printing, VR/AR and mobile mapping: it’s all here.” Civil engineering contractor Mobilis focuses on innovation within the organisation and on projects in the fields of infrastructure, water management and industry.

Using VR also creates a much more immersive experience for the client. (Image: Vincent Basler)
Saving time and money
“When used effectively, these modern techniques help the construction sector save a great deal of time and money. We create a virtual representation of the existing environment, the end result and the steps in between. This gives both clients and the communities around construction projects a clear picture and an immersive experience. The measurements we take provide the basis for design, visualisations, planning, volume calculations and more. Virtual construction enables faster decision-making and can lead to better decisions. Problems are also identified sooner, allowing us to anticipate them. And using VR also creates a much more immersive experience for the client. In the same way, AR instructions help construction workers stay on track and maintain the quality of their work. The stored data can be used in a shared data environment: BIM (Building Information Modelling). The insights gained make the work more efficient and improve the end product,” says Jeffrey.
BIM: a major role in complex projects
“BIM is playing an increasingly vital role in specific projects. The BIM process is not the same for every project, but can be tailored to what is needed or requested by the client,” Jeffrey continues. “We create our own BIM environment, where information on the various project disciplines is stored, shared, used and managed throughout the construction process. This gives us valuable insight, enabling us to offer advice at an early stage and inform key decisions. The various disciplines involved in an integrated construction project are much easier to manage because we know when they need to coordinate with each other. Clients and stakeholders review the BIM model for validation: are they getting what they expect?”

The Rijnlandroute coordination model was used for review, visualisation of interfaces and validation with the client and stakeholders.
Digital Twin
“Mobilis goes one step further,” Jeffrey continues. “Together with Croonwolter&dros, we validate the operation of specific systems by linking the system architecture to the virtual model. This so-called Digital Twin is used for prediction, testing and potentially management. We can simulate incidents and use the insights gained to improve the design. This saves a great deal of time, enables better planning, reduces costs and makes testing and handover run more smoothly.”
Rijnlandroute
“During the tender phase of this project, visualisations were created at various junctions along the route, allowing the client to look around in 360 degrees. The integrated coordination model was used extensively during the design phase and then served as the basis for the Digital Twin. The operation of the tunnel system was demonstrated in various scenarios. We also created a virtual driving experience of the different road phases during construction, allowing us to validate road users’ driving behaviour.” Jeffrey concludes: “Phased, integrated construction has to be done properly, and having a single central source of information is essential. Mobilis has proved to be very future-proof in this respect.”
Have a business enquiry for Mobilis? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeDigitalisation from design to construction
- SubjectSpecials
- CompanyMobilis
- CompanyCroonwolter&dros


















