Specials

Dig faster and with greater confidence using the latest 3D GPS control system

Dig faster and with greater confidence using the latest 3D GPS control system

“A relatively large number of agricultural contractors and SME construction firms that come to us for a control system still work with stakes and are finding that they can no longer meet clients’ quality and speed requirements. 3D GPS control is literally specified in some contracts,” says Marcel Ten Westenend, who has spent decades advising companies and guiding them through the purchase of machines and machine control systems. “They have also become aware that the efficiency gains offer so many benefits to them and their machine operators that they can hardly do without it any more.”

It is a fact: 3D GPS machine control has become a prerequisite for winning attractive earthmoving contracts. “A relatively large number of agricultural contractors and SME construction firms that come to us for a control system still work with stakes and are finding that they can no longer meet clients’ quality and speed requirements. 3D GPS control is literally specified in some contracts,” says Marcel Ten Westenend, who has spent decades advising companies and guiding them through the purchase of machines and machine control systems. “They have also become aware that the efficiency gains offer so many benefits to them and their machine operators that they can hardly do without it any more.”

The main benefits?

1.         Minimise earthmoving
2.         Fewer errors
3.         DTM available in the cab
4.         More comfortable and faster working
5.         Minimise CO2 emissions
6.         Less downtime and a smoother workflow
7.         Recording capabilities
 
On top of that, there is real-time communication between the office, all the machines and the site, as well as the option to upgrade the X-53x with an auto-excavator. Read all about it in the accompanying article. 

Een zakelijke vraag aan Topcon Positioning Netherlands? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeDigitalisation from design to construction
  • SubjectSpecials
  • CompanyTopcon Positioning Netherlands
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.