BIM: Digital integration in the Port of Rotterdam

Economic growth, digitalisation and increased pressure from clients are placing ever greater demands on civil engineering consultancies in the water engineering sector. To anticipate market developments and stay ahead of the competition, offering an efficient and robust design process is crucial. Communication across projects is vital to provide an optimal overview of aspects such as costs, planning and management. The Port of Rotterdam, Europe's largest and most modern port, is developing a central database for the entire port.
The role of engineering consultancies and its application at an oil terminal in Europoort

Visualisation of the 3D model, with the quay and combi-wall taking centre stage.
Building Information Modeling (BIM) offers a solution. This technology is based on managing and controlling data in a single model throughout all design stages, the construction process and the entire lifecycle of a structure. Being able to access accurate, up-to-date data for a specific time and location at any point ultimately improves project delivery and reduces costs. At the heart of a BIM-based model is a 3D model, created in a design programme such as Revit. All available information is linked to it, making the impact of that information, and of any changes made, immediately visible.
Oil terminal in Europoort
As part of BIM integration in the Port of Rotterdam, Lievense I WSP and De Klerk Werkendam carried out a pilot project for hbr. The project involves the construction of a quay structure and an inland shipping berth, together with associated fender systems, for the transhipment of petrochemical products. Engineering consultancy Lievense | WSP produced the tender, detailed and construction designs. Lievense I WSP also created the 3D model, compiled the required information about the structure, gathered relevant data and linked it to the corresponding model objects. The scale at which the Port of Rotterdam applies standardisation to objects is unique in the Netherlands. The project covers more than four thousand objects, including bollards, foundation piles and anchor rods, to which available information has been linked.
The model is based on the BIM management database of Havenbedrijf Rotterdam, developed by Witteveen+Bos to create a structured system for the standardised transfer of information across the entire port. Lievense | WSP created a 3D model based on an object tree, alongside the required structural calculations. Geometric information from the model was then stored in spreadsheets for each object type. Non-geometric data from the contractor and client was added to the objects, and all information was then assigned to the corresponding objects in Revit. Finally, the 3D model was exported to the required file format to enable integration with the entire BIM database for the Port of Rotterdam and generate visualisations.

The project involves the construction of a quay structure and an inland shipping berth for the transhipment of petrochemical products, together with associated fender systems.
Digital and integrated collaboration
Centralised information storage for the entire port enables dynamic, well-organised collaboration between the parties involved in a project, reducing the risk of errors. Extending this to create a so-called ‘Digital Twin’ (virtual representation) of the port and linking it to external factors could open up many possibilities in the future. These might include identifying weak points in the port using storm simulations or drawing up a central management and maintenance plan.
Achieving this requires continuous, close collaboration between stakeholders and optimal integration of all project phases. Staff with advanced BIM (management) expertise are also needed to meet the demanding model requirements, as well as a powerful server and comprehensive administrative system. However, standardising information transfer and integrating BIM into current working methods represent such a significant step towards a digital economy that these obstacles are unlikely to halt the development already under way.
A business enquiry for WSP? Get in touch
Companies in this story
Keep following this
Get an email when a new story is published. No account needed.
- ThemeDigitalisation from design to construction
- SubjectSpecials
- CompanyWSP
- CompanyDe Klerk Werkendam


















