Engineering consultancy with its own field teams
Text Roel van GilsImage Geonius

Geonius is responsible for setting out, monitoring, environmental consultancy and surveys on and around the A9 widening and the section being built below ground level between Badhoevedorp and Holendrecht. With engineers, consultants and field technicians, Geonius can work efficiently and flexibly. Involvement at an early stage of a project means a great deal can be anticipated, and if unexpected situations do arise, the team can respond quickly.
Initial contact between construction consortium VeenIX, which is carrying out the work on the A9 on behalf of Rijkswaterstaat, and Geonius was made as early as 2019. “We provided environmental advice based on an existing environmental soil survey,” says Niels Geuijen, Project Manager, Environment at Geonius. “That led to us being commissioned to carry out more detailed surveys during the next design phase. We are still doing this whenever issues arise during design and construction for which we have no information. So, on the one hand, we act as consultants, while at the same time carrying out all the soil surveys and supervising soil remediation, mainly for contamination related to motorways. We also do this for other material streams arising from the works.”

Geonius has a team of just under 20 people working on the project in the setting-out discipline. “We handle everything that needs to be surveyed and set out within the project boundary,” says Hassan El Gardaoui, Geonius Project Manager for Setting Out. “This ranges from collecting data and establishing a primary survey control network to setting out concrete and asphalt works and collecting data on cables and pipelines. We also monitor the settlement behaviour of temporary and permanent structures, sheet-pile walls, sand embankments and other objects. Although Geonius is currently involved in the A9 project with two disciplines, our scope is much broader, covering fields such as Landscape, Archaeology and Ecology. With this broad expertise behind us, as well as our own field teams, we can respond quickly and flexibly to almost any challenge.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeDigitalisation from design to construction
- SubjectRoad construction