The BIM model of the completed project
The BIM model of the completed project

All modes of transport converge at high intensity in the Port of Rotterdam: road, rail and water. The last two are particularly at odds near the movable Calandbrug at Rozenburg. To avoid this bottleneck, a smart diversion has been devised, so rail traffic no longer crosses the shipping route.

Construction of the 4-kilometre Theemswegtracé is a complex project in a challenging environment with many stakeholders. This was reason to prepare the diversion in a 4D model.

The current situation

“The Theemswegtracé is a solution to the capacity bottleneck for rail traffic expected as a result of growth in rail freight, as well as increased shipping traffic to and from Brittanniëhaven,” says Dieter Behaeghel, project director of construction consortium SaVe, responsible for delivering the substructure. “The new route runs along an elevated railway viaduct, includes two arch bridges and reconnects to the existing railway near the A15. This means growing rail traffic will no longer get in the way of shipping, improving the flow of traffic.”

4D BIM

During the tender phase, before the contract was awarded, Infranea supported client Havenbedrijf Rotterdam with the Building Information Management (BIM) component of the procurement. “The idea was to link the programme to the 3D model, given the many stakeholders in the area, so that a number of logistical operations could be simulated during the preparatory phase,” explains Jaap de Boer, Operations Director at Infranea. “In consultation with Havenbedrijf Rotterdam, after the contract was awarded we were able to free up time to continue providing BIM consultancy services to consortium SaVe. At the outset, we drew up a BIM Execution Plan setting out the BIM strategy and processes for successfully preparing and completing the project. Linking the programme to the 3D model proved crucial. 4D BIM also helped us communicate with the local area and inform stakeholders, managing expectations around construction activities and safety, which is no small matter in a complex industrial environment such as the Botlek. The model is also linked to other systems, such as Relatics, making it easy to hand over the required digital handover dossier to Havenbedrijf Rotterdam on completion.”

The Theemswegtracé diversion was prepared in a 4D model. (Image: PortPictures/Danny Cornelissen)

The 4D model also gives SaVe itself much greater insight, according to Behaeghel. “It plays an important part in the philosophy we promote as a consortium. SaVe stands for ‘stick to the plan’, ‘always safe’, ‘working together’ and ‘excellent work preparation’. By developing a project in 4D BIM, you are effectively building it virtually in advance. This gives us the insight we need to get every aspect of the work right first time, significantly reducing the cost of rework. It is even possible to digitally test construction crane slewing radii in advance and check crane positions in relation to the location of cables and pipes. Thanks in part to 4D BIM, we are still on course to meet the planned completion date, which is no mean feat given the circumstances with coronavirus.”

Question about this story? Ask your question

Who worked on Theemswegtracé

  1. construction consortiumSaVeIn this story
  2. clientHavenbedrijf RotterdamIn this story
  3. grid operatorStedinMentioned in The Netherlands’ most complex underground infrastructure area
  4. contract administratorSGS Roos+BijlMentioned in The Netherlands’ most complex underground infrastructure area
  5. TBI companyMobilisMentioned in Substructure for Theemsweg route complete

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectTheemswegtracé
  • SubjectRoad construction
  • CompanySaVe
  • CompanyHavenbedrijf Rotterdam
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.