Wilo-Padus PRO: efficient solution for the reliable removal of wastewater from construction pits

Wastewater submersible pumps used to remove wastewater from construction pits are exposed to heavy loads from abrasive media. This creates a risk that pump performance will steadily decline while energy consumption rises. In the worst case, the water can no longer be pumped out completely. The consequences are delays or interruptions to construction work. With the Wilo-Padus PRO, Wilo offers an efficient and reliable system solution for removing wastewater from construction pits.
“We have tailored the Padus PRO specifically to the demanding conditions in construction pits,” explains product manager Olivier Armbruster. At the same time, the pump combines the highest levels of reliability and energy efficiency. This is made possible by its powerful IE-3 motor, robust pump design with rubber-coated hydraulics and an impeller made from duplex stainless steel. Active cooling ensures reliable continuous operation, while cooling is passive in suction mode. “We have developed a product whose components work together to create a well-designed system solution.”

Easy installation, maximum operational reliability
As a lightweight plug-and-play solution with a flexible discharge connection that can be positioned vertically or horizontally, the Wilo-Padus PRO is easy to install and can be used almost anywhere. In construction pits, hard solids such as sand and small stones wear down the impellers and hydraulic components of submersible pumps, adversely affecting their continuous-duty capacity. With its robust design, the Wilo-Padus PRO has been specially engineered to meet these demands. The clearance between the impeller and wear plate can be adjusted, restoring pump efficiency when required. Wear parts are quick and easy to access, ensuring straightforward maintenance. The submersible pump meets all the requirements for digitalisation, enabling future maintenance to be planned optimally. An additional module for electronic monitoring and data storage will also be integrated shortly.
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectWater infrastructure
















