More haste, less speed!

But sometimes urgent action is necessary, and it is then vital to work with specialist contractors who can offer flexibility and speed.
This was also the case with the emergency job on Veerweg in Streefkerk. In early July, Oasen Water Authority discovered a leak in a trunk water main, requiring a swift response. Main contractor Van Vulpen was brought in to create a safe, workable excavation.
Repairs required an excavation 4 metres deep. To create an excavation of this kind quickly, safely and reliably, trench support, or a BoX system, was essential. Van Vulpen called on BodemBoX to assess together which earth-retaining structures would be best suited to the situation. At times like this, the challenge is to deliver the usual quality, but at a different pace and with far greater flexibility.
Because the leak was in an existing water main, creating a dry, workable excavation was a major challenge. The existing main first had to be switched over. As it was a trunk main, the largest transmission pipeline connecting the various treatment plants, several switching operations were required.
An earth-retaining structure then had to be designed to suit the situation. To provide support as close as possible to both sides of the water main, it soon became clear that a DamwandBoX system would be a good solution. The BoX system had to be installed in an existing ditch full of water. Van Vulpen therefore proposed using Damwand chamber elements on all sides, which proved to be an excellent choice in practice!
BodemBoX received the urgent request on Friday, with delivery requested for the Monday after that weekend. This meant relying on your employees and partners to prepare and organise the project in the time available. The first lorries were unloaded in Streefkerk on Monday. On Tuesday, Van Vulpen assembled and installed the DamwandBoX units under BodemBoX's guidance, and by Wednesday the excavation was dry and ready for the repairs.
This was the first time Oasen had to repair a leak in a trunk main, and the work went well. Van Vulpen and BodemBoX can look back on a successful collaboration and an outstanding performance under intense pressure. With the right collaboration and quality, haste can indeed make good speed!
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- SubjectWater infrastructure