Klosterneuburg and Korneuburg are two municipalities in Lower Austria, situated directly opposite each other on the banks of the Danube. A microtunnel beneath the riverbed has connected the utility networks of the two municipalities. EVN has invested around €10 million in tunnelling beneath the Danube and installing pipelines for drinking water, ambient heat, internet, electricity and gas. This is intended to improve security of supply in the region and further promote the expansion of sustainable energy supplies.

The pre-welded pipes were pulled into the culvert on a rail system. (Image: EVN)

To connect the gas, water and district heating networks of the two municipalities, EVN commissioned the construction of a 460-metre-long microtunnel beneath the Danube, with a diameter of 2 metres. Built using pipe jacking, the tunnel houses the Korneuburg-Klosterneuburg high-pressure steel natural gas branch and two AGRULINE drinking water pipelines made from high-performance PE 100-RC, size da 560 mm SDR 11, for an operating pressure of up to 16 bar. AGRU Kunststofftechnik GmbH supplied more than 1,000 metres of PE 100-RC pipes and fittings in total. As a precaution, two district heating pipelines and a reserve high-pressure steel gas pipeline were also installed in the Danube tunnel, along with 16 plastic cable protection ducts for electricity and optical fibres. AGRU Kunststofftechnik GmbH supplied a total of 2,880 metres of PE 100-RC pipe and fittings, diameter 160 mm SDR 21, for the cable protection ducts.

The trolley, made of steel and wood, enabled the pipelines to be pulled into the tunnel. (Image: AGRU)

Trenchless pipeline construction for infrastructure

The 460-metre-long Danube crossing starts on the Klosterneuburg side, at the northern edge of the Rollfährensiedlung, and ends at Tuttendörfl on the Korneuburg side. It was bored using the pipe-jacking method, with a 40-tonne boring head, and lined with concrete pipes. The tunnel does not follow a straight line, but curves along a radius of 1,600 metres. This ‘banana shape’ results in varying cover depths beneath the Danube bed, from around 5 metres in the bankside areas to a maximum of 11 metres in the middle of the river. The trenchless construction method enabled a safe crossing beneath the Danube and the efficient installation of the concrete pipe with an internal diameter of 2 metres. The pipelines for drinking water, ambient heat and internet were welded, positioned on a sled structure and pulled through the tunnel using a rail system. AGRU supplied extra-long, 18-metre PE 100-RC pipe lengths, diameter 560 mm, significantly reducing the amount of welding required. Mechanically manufactured electrofusion couplers were used at the joints. 

EVN has invested around €10 million in tunnelling beneath the Danube and installing pipelines for drinking water, ambient heat, internet, electricity and gas. (Image: EVN)

The tunnel was then sealed at both ends, filled with water and the pipelines checked for any defects. “After the inspection was completed successfully, the tunnel was filled with a concrete suspension and permanently sealed, without the need for maintenance,” explains EVN company spokesperson Stefan Zach. 

District heating and drinking water networks

On the Korneuburg side, pipelines were laid from the EVN power station site and a well field to a point just short of the Danube bank, with the necessary tunnelling work carried out beneath the railway line and the A22. Korneuburg’s thermal power station was supplemented in 2015 by an EVN biomass heating plant. It converts woodchips from the region into sustainably produced, environmentally friendly heat. This was also one reason for building the supply tunnel. EVN spokesperson Stefan Zach says: “The biomass plants on both sides of the Danube can step in for each other’s operations at any time in the event of a breakdown or maintenance. Since we also have major wells and springs on both sides of the Danube, the tunnel makes it possible to connect the drinking water reserves. This can be crucial if there is a problem with the well field. Especially in difficult times like these, the importance of regional security of supply becomes clear.” 

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectWater infrastructure
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.