Versatile piling contractor invests in the future

With a wide range of piling rigs and almost 100 years (!) of experience, H. van Dieren Hei- en Waterwerken is a well-established name in the world of foundation engineering. To ensure continuity, the family business continues to invest in people and equipment. Its first fully electric piling rig, the first of its kind in the Netherlands, will soon enter service.
H. van Dieren is an exceptionally versatile family business. “We have a broad fleet of machines across several size ranges, enabling us to offer the right solution for every project,” says Alex van Dieren, director of H. van Dieren. “Our equipment ranges from machines for installing large-diameter piles and long piles to smaller machines that can work very effectively in confined spaces. Over the years, we have built up a loyal customer base that keeps coming back to us for a wide variety of projects. Having our own low-loaders for transport also makes us highly flexible and self-sufficient.”
A familiar sight
H. van Dieren’s machines have been a familiar sight for almost nine years at Casterhoven, a huge new residential district in Kesteren. “We are working in phases on the foundations for the district, and are currently on phase 18, commissioned by Bouwbedrijf Van Grootheest,” explains Van Dieren. “The piling work we carry out here is very varied. It calls for a range of machines, mostly in the mid-size category, in the 4- and 5-tonne range. We install piles ranging from 10 to 13 metres in length, and phase 19 is already on the schedule. Large-scale projects like these are right up our street. We have also worked on the foundations for new residential districts in several phases in Utrecht, Lent and Nijmegen. In total, we have installed more than 6,000 piles here.”
Van Dieren believes that businesses must consider the environment if they are to survive. “We keep a close eye on sustainable developments and, as a family business, are also closely involved in developing machinery. When we invest in sustainable equipment, the technology needs to be reliable and the capacity sufficient for a full working day. We have now found a machine that meets those requirements. We will soon be putting the first fully electric piling rig into service, a first for the Netherlands. It will allow us to lay a solid foundation for every project with zero emissions.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.
- ThemeUnderground construction
- SubjectSpecials