Specials

Strong foundations in almost any location

Strong foundations in almost any location

Given today’s requirements for sustainability, safety and the environment, as well as ongoing developments in the load-bearing capacity required of foundation piles, machinery needs to be ready to meet these demands too. Foundation piles are getting heavier and often need to be installed deeper. When the work area in which the machinery has to operate is also restricted, the requirements become highly specific.

“We provide suitable solutions for complex foundation challenges,” says Ton Groeneweg, director of Tubex. “Demand for large-diameter screw injection piles on sites where horizontal or vertical constraints are a key factor has prompted us to upgrade our fleet.”

Innovate, renovate and invest
“We have invested in a machine with extensive kinematics and the ability to drill piles with a diameter of 610 mm and a drill tip measuring 845 mm. The TTD50, with a drilling torque of 50 Tm, can drill larger-diameter piles to considerable depths. The machine was recently commissioned on a project in Borssele, where a larger pile size was specifically requested for the foundations of the high-voltage pylons. Our Tubex pile drilling machine, the TBM35, has been completely overhauled, allowing us to work more effectively in even tighter spaces. The engine that powers the machine meets the latest emissions requirements. This is important because we often work in urban areas or very close to buildings. Its compact dimensions, combined with a powerful drilling torque of 35 Tm, make this machine ideally suited to complex working conditions in the infrastructure and petrochemical industries. The machine recently installed the foundations for the Buitenring Parkstad Limburg project, a viaduct over the A76 near Nuth. The work took place in the central reservation of a motorway that remained open to traffic. We have also added a new tracked power pack with a hose reel to our fleet. This allows us to power smaller drilling rigs, which often work inside buildings and are driven by an engine running outside. This creates a user-friendly situation for people and the surrounding environment,” says Ton. “Tubex now has an up-to-date fleet that meets the latest requirements for diesel engine emissions (DME) and reducing disturbance to the surrounding area. We are therefore well equipped for all projects in the near future.”   

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeUnderground construction
  • SubjectSpecials
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.