Specials

LVO measure for motorways validated by Rijkswaterstaat

LVO measure for motorways validated by Rijkswaterstaat

After eight years of research, Esha PenTack, produced by Esha Infra Solutions, has been found to meet Rijkswaterstaat’s requirements as a life-extending maintenance treatment for ZOAB. With validation by Rijkswaterstaat, PenTack is the first LVO measure approved for large-scale maintenance of motorways.

Applying PenTack extends the service life of asphalt (ZOAB, as well as DGD and SMA) by several years, without affecting skid resistance, noise reduction or water permeability. A PenTack treatment can be repeated up to three times on ZOAB, potentially extending its service life by as much as nine years. This makes a significant contribution to C02 reduction. What is more, using PenTack causes far less disruption to road users than laying a new asphalt surface, as the road can be reopened to traffic soon after maintenance.

Since 1996
Back in the 1990s, Esha Infra Solutions developed the bitumen emulsion PenTack, which contains a rejuvenating component. The treatment restores sufficient flexibility to the binder in aged asphalt, thereby preventing ravelling for many years. The bitumen emulsion is applied to the aged asphalt surface using computer-controlled spray trucks, and is then covered with chippings to provide sufficient skid resistance.  

A business enquiry for ESHA Infra Solutions? Get in touch

Companies in this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ThemeExtending the life of roads and civil engineering structures
  • SubjectSpecials
  • CompanyESHA Infra Solutions
Share this article

Follow on Grond/Weg/Waterbouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.